The construction of 1) a new playing pitch, associated goals, ball stop nets, floodlighting, dugouts, score board, fencing, 2) a walking track, associated protective fencing/barriers and lighting, 3) a surfaced vehicular parking area, internal access road, lighting, alterations and improvements to an existing entrance and all associated siteworksDecision record indexed
The Courtyard, Townfields Cloughjordan, Co. Tipperary
The existing dwelling and outbuilding as constructed under planning grant 19600017 to include alterations to internal layout, elevations and use of the outbuilding as a meditation space and all associated siteworks as constructed. Permission is sought to provide a door to the north and the west elevations of the dwellingDecision record indexed
A) completion of partially constructed dwelling including conversion of the attic space to living accommodation, b) construction of detached domestic garage, c) installation of septic tank and percolation area and all ancillary site worksDecision record indexed
The erection of a 15m high shrouded pole (16 metre overall height to top of lighting finials) together with antennas, dishes and associated telecommunications equipment, ground level equipment cabinet, all enclosed by security fencing and to remove an existing 12 metre high wooden poleDecision record indexed
1). alterations to the western site boundary to accommodate a longer senior pitch, 2). the provision of sideline dug outs with covered area to northern sideline of the senior pitch, 3). the provision of a ball stop net to the southern goal end of the junior pitch, 4). the provision of equipment storage sheds and covered area to the western sideline of the junior pitch, 5). the provision of floodlights to the junior pitch area, 6). the provision of site lighting to the carpark, vehicle and pedestrian circulation/walkway areas, 7). the provision of a modular build structure to provide dressing rooms, toilets and club room, served by a wastewater tank and pump station, discharging to the main sewer, including associated site worksDecision record indexed
New part two storey part single storey dwelling, domestic garage, new site entrance, connection to public services and all associated site worksDecision record indexed
Installation of a streetlighting network comprising lighting columns and fixtures above and below ground level and all ancillary works; erection of 2 no. pedestrian footbridges and associated foundations; complete road turning bays and construction of traffic ramps to taken in charge standards; complete road signage and road markings to taken in charge standards; repair of identified existing footpaths/greenways; erection of security fencing around waste water treatment plant; erection of security fencing around sewage pumping station; connection of water main at Step Road entrance and installation of tarmacadam at Step Road entrance; and all ancillary worksDecision record indexed
The demolition of storage sheds and former workshop and the erection of an extension to rear of the existing dwelling, including associated worksDecision record indexed