Planning records
Showing 1-50 of 32,556 public recordsSliding steel entrance gate to the main entrance; partial demolition of a section of existing boundary wall; construction of new site entrance piers and the extension of the existing perimeter railings to meet the new piers; 2 new bicycle shelters and all associated site development works.
Works to the existing roof including installation of 173sq.m of solar pv panels; the erection of a new guardrail on the existing parapet to the perimeter of the roof; alteration to a portion of the existing roof from a pitched roof to a flat roof, installation of roof access hatches and all associated site development works.
On a site bound by Belgard Road (R113) to the east, Belgard Square North to the North, Belgard Square East to the west and Clarity House to the south, demolition of all existing structures on site (with a combined gross floor area of c. 3625sq.m); The construction of a mixed-use residential development set out in 3 blocks including a podium over a basement, ranging in height from 2 to 13 storeys (with core access above to roof terrace), comprising 334 residential units of which 118 will be Build to Rent (BTR) residential units, with associated amenities and facilities across the development; 4 retail/café/restaurant units and 3 commercial spaces associated with the 3 live-work units (723sq.m combined); Childcare facility (144sq.m); 670 bicycle parking spaces including 186 visitor spaces; 117 car parking spaces (including 6 disabled spaces) are provided at ground floor and basement level; Communal space in the form of residential courtyards and roof terraces; Public open space provision including Homezone/tertiary route along the south of the site between Belgard Rd and Belgard Square East; The overall development has a Gross Floor Area of 29,784 sq.m; Of the total 334 residential units proposed, unit types comprise Block A (Build-to-Rent), 91 one bed units; 1 two bed 3 person units; 26 two bed 4 person units; Blocks B & C, 2 live-work studio units; 102 one bed units; 12 two bed 3 person units; 88 two bed 4 person units including 5 duplex units; 1 two bed 4 person live-work unit; 11 three bed units; A portion of the proposed residential development is a 'Build to Rent' scheme in accordance with Specific Planning Policy 7 and 8 as set out in the 'Sustainable Urban Housing: Design Standards for New Apartments (December 2020); All associated works, plant, services, utilities, telecommunications infrastructure, PV panels and site hoarding during construction; A Natura Impact Statement has been prepared in respect of the proposed development and accompanies this application; The application contains a statement setting out how the proposal will be consistent with the objectives of the relevant development plan or local area plan; The application contains a statement indicating why permission should be granted for the proposed development, having regard to a consideration specified in Section 37(2)(b) of the Planning and Development Act, 2000, as amended, notwithstanding that the proposed development materially contravenes a relevant development plan or local area plan other than in relation to the zoning of the land.
The development consists the installation of 2no. new water tanks and an associated enclosure to the north of the existing office building, the relocation of a previously granted bicycle shelter under planning reference SD21A/0123, from the east of the site to the south-west, and all associated site works at PM Group, Kearney House, Belgard Square, Dublin, D24 XFW2.
Renovation and modifications to the original building including a change of use to office, training and distribution centre; proposed changes to the existing internal layout; internal fire stair location moved; extended mezzanine area, additional new toilets; external windows and modifications to the roller door on the rear elevation; new signage to the front elevation and all ancillary works.
Amendments to previously granted permission (SD20A/0017) comprising of alterations to façade; installation of roof lights and PV panels.
Mixed-use development including 310 "Build-to-Rent" residential apartments, a creche and a number of commercial units (c. 2,289 sqm) on a c. 1.26 ha site; Consisting of the demolition of existing boundary wall and construction of: c. 2,289 sqm of retail/commercial floor space across 10 units including retail, restaurant/café and Class 2 financial/professional services and office use, and a crèche (257sqm) at ground and first floor levels; 310 build to rent residential apartments including 99 one bedroom units, 203 two bedroom units and 8 three bedroom units within a part 6 to part 12 storey development across 3 blocks over partial basement; c. 2,223 sqm of communal external amenity space provided in the form of a ground floor garden and external terraces at fifth, sixth, seventh and eighth floor levels; c. 1,026 sqm of public open space provided in the form of a central courtyard with landscaped areas at site perimeters; c. 1,785 sqm of resident support facilities and services and amenities provided at basement, ground and first floor levels; Vehicular access to the basement development from a new access point at Belgard Square East; A new tertiary route provided in the southern part of the site linking Belgard Square East and Belgard Road; Provision of 130 car parking spaces (including 8 club car spaces and 6 disabled access spaces) at basement level in addition to 5 set down spaces (4 serving creche) and 1 disabled access space at ground level, layby on Belgard Square East, 6 motorcycle spaces and a total of 763 bicycle parking spaces; Provision of 4 Ø0.3m microwave link dishes to be mounted on 2 steel support pole affixed to lift shaft overrun, all enclosed in radio friendly GRP shrouds, together with associated equipment at roof level at Block B; Provision of 3 ESB substations with switch rooms and plant rooms at basement level, hard and soft landscaped areas, bin and bicycle stores, public lighting, attenuation, green roof, plant at roof level, service connections and all ancillary site development works. The application contains a statement setting out how the proposal will be consistent with the objectives of the relevant development plan and local area plan. The application contains a statement indicating why permission should be granted for the proposed development, having regard to a consideration specified in section 37(2)(b) of the Planning and Development Act, 2000, as amended, notwithstanding that the proposed development materially contravenes a relevant development plan or local area plan other than in relation to the zoning of the land.
The proposed development principally comprises: the demolition and removal of existing boundary walls and railings on the main development site's eastern, western and northern sides; and the construction of a mixed-use development in 2 No. blocks (Block A to the south and Block B to the north) with a gross floor area of 23,540 sq m (including basement of 275 sq m) and ranging in height from 1 No. to 7 No. storeys (with mezzanine level) over basement. The development includes a total of 199 No. residential dwellings (6 No. studios, 47 No. 1-bed, 98 No. 2-bed and 48 No. 3-bed) in the 2 No. blocks, with Block A comprising 49 No. 'senior living' apartment units and Block B comprising 150 No. 'standard' apartment units. The development also includes 2,123 sq m of non-residential floor space, with the following uses proposed: 4 No. retail units (totalling 331 sq m); 4 No. class 1 / class 2 commercial units (totalling 387 sq m); a bicycle sales and repair shop (81 sq m); an off-licence (64 sq m); a bar (151 sq m); a café (87 sq m); a medical centre (210 sq m); a dental practice (72 sq m); a pharmacy (195 sq m); a beauty/health salon (195 sq m); and a crèche (350 sq m) with external play area. The development also comprises: an undercroft car park accessed via a new entrance/exit at Belgard Square East which provides 58 No. car parking spaces; a gated service lane to the south of Block A, with entrances/exits off Belgard Square East and Belgard Road; 2 No. pedestrian/cycle crossings, at Belgard Square East and Belgard Road; continuation of the northbound cycle lane from Belgard Road onto Old Blessington Road; alteration to the median and northbound right turn at Belgard Road onto Abberley Square; cycle parking; internal communal amenity spaces for the senior living units; hard and soft landscaping, including public open space, communal amenity space and incidental spaces; private amenity spaces (as balconies and terraces facing all directions); boundary treatments; 2 No. sub-stations; plant/operational rooms; bin stores; public lighting; blue roofs; rooftop PV arrays; lift overruns and rooftop opening vents atop both blocks; 4 No. 0.3 m diameter microwave link dishes mounted on 2 No. steel support poles affixed to the Block B lift overrun, all enclosed in radio-friendly GRP shrouds; and all associated works above and below ground. Note for the mixed-use question below: there are too many non-residential uses proposes relative to the lines available, so we have provided the residential floor area and the combined non-residential floor area. See submitted materials for details of the individual non-residential uses. The main development site (approximately 0.91 Ha) is generally bound: to the north by Old Blessington Road; to the east by Belgard Road.
Alterations to existing external service area to the north eastern side of The Square Shopping Centre at the entrance to the existing service yard comprising of construction of an external plant area (c.135sq.m) enclosed by 2.4 metre high galvanised fencing to accommodate an Air Handling Unit (AHU) and a Chiller Unit ancillary to the shopping centre; new flat roof boiler room building (c.34sq.m gross floor area) within the proposed new enclosed plant enclosure; installation of a metal frame (2.4 metres wide x 1 metre high and located 2-3 metres above the ground supported by metal stilts) to facilitate the connection of the Air Handling Unit and Chiller within the plant area to the covered service yard area; replacement of mesh panels on existing wall on the western and norther side of the service yard with metal louvered panels; all associated site and development works.
Permission for development at McDonald's restaurant, Belgard Square East, Belgard Road, Tallaght, Dublin 24, D24 HW74. The development will consist of proposed new revised signage to the south, east and west elevations, upgrade works to the existing sky sign including new flat display panel sign, and all associated works necessary to facilitate the development.
Provision of a 9.7sq.m extension to the north-western corner of the building to facilitate additional staff room space; the installation of a new high level window along the western elevation of the building; the replacement of the existing sliding entrance door with a new automatic swing door along the southern elevation of the building; the removal of the existing wall in the external bin storage area/corral to facilitate an increase in area by 17sq.m and the provision of close boarded timber fencing; the removal of a door on both the northern and eastern elevation of the building. The proposed development will also include: the removal of 1 No. Parking space; the replacement of 3 No. car parking spaces with 2 No. Electric Vehicle Charging spaces; the provision of 3 No. additional pedestrian entrances along the southern boundary of the site onto the pedestrian walkway connecting Belgard Square East to the R113; bicycle parking; the rearrangement of the external seating area; signage; and all associated site development works.
Change of use from Betting Office to Beauty Salon with proposed opening hours of Monday to Sunday, 9:30 a.m. to 8:00 p.m.
Extension of an existing telecommunications lattice tower (providing new overall height of 31.5 metres) carrying existing antennas, dishes and associated equipment and additional new antennas, dishes and associated equipment together with new ground equipment cabinets, new fencing and all associated site development works.
The development consists of the change of use of the ground floor unit from retails use to cafe/patisserie shop including the sale of hot and cold beverages. The following works are proposed: (1) Internal configuring of unit including fit out of unit to facilitate development with provision of serving counter, store, W/C and seating area at ground floor level internally and externally (2) Alterations to ground floor level facade including new glazed door and window, new awning to shopfront, new signage and projecting signage to front facade. (3) All associated site works and ancillary works at this address in accordance with plans as submitted
The development will consist of (a) the removal of the existing fascia signage, (b) the installation of green powder coated aluminium cladding panels overlaid on the existing shopfront, (c) the installation of a new double glazed Crittall framed glazing and entrance door complete with repairs to the shopfront, (d) the installation of new internally illuminated fascia signage, (e) the installation of a new internally illuminated projecting sign and (f) all associated site works.
Subdivision of the existing retail department store (Unit 116 - 5,396sq.m. - formerly Debenhams) to comprise 2 retail units - 116A (2,431sq.m) and 116B (2,270sq.m) and new service corridor (176sq.m) to the rear of the proposed unit 116B to provide access to the existing service yard; associated modifications including the removal of the existing mezzanine floor within Unit 116 (497sq.m); creation of new retail frontage within the internal mall and associated signage; revisions to existing retail Unit 117 (113sq.m) and 118 (102sq.m) to form a single amalgamated unit (169sq.m) and creation of additional mall floor space (47sq.m) arising from the unit reconfiguration; all associated site and development works including minor revisions to the layout of the existing service yard.
Permission to permanently retain the change of use from Civic Offices to medical centre on foot of now expired, 10 year temporary permission (SD08/0594). Proposed uses include public attendance for consultation, treatment and general healthcare provision on all levels from lower ground floor to fourth floor, including retention of existing signage and roof top plant.
A telecommunications field technician apprenticeship training area, comprising of a compound, 35m by 25m enclosed by a 3m perimeter fence. The area will contain a number of street cabinets, underground access chambers, underground ducting, half height training poles and a storage unit.
Change of use of existing open plan 997sq.m shell and core retail unit to the use as a spa/recreational facility to include swimming pool area; relaxation areas; treatment rooms; associated office/administration areas; changing facilities; internal dining/restaurant area; associated kitchen facilities; plant areas; associated ducting/extraction vents with associated elevational changes; connections to all services and site development works; new internal mezzanine floor to provide additional 602sq.m at new first floor level and on-street bicycle parking outside the building for 18 bicycles at the corner of Abberley Square and Abberley Square East.
New external signage with internal illumination at high level to Northern façade with internal LED display signage (2.5m x 2.1m) at ground floor level.
Installation of a 7.5m x 8.65m retractable canopy/awning, glazed partitions and planters for a 65sq.m sheltered outdoor seating area to the front of existing commercial unit.
Alterations to previously approved design (Reg.Ref:SD25A/0001W) comprising modified internal apartment layouts, additional window/door ope to terraces in Apts 1 & 2, fenestration alternations to southern and eastern facades, additional floor area to Apt. 4 to northern elevation, additional of 2 no. AOV's to roof level and all associated site works.
Change of use of a vacant unit to four one bedroomed apartments.
The development will consist of internal reconfiguration and amalgamation of 4no. existing Level 2 retail units (U238, U239, U240 and U241) to provide two retail units (U238: 516sqm and U240: 1282sqm) and ancillary circulation and general store rooms (c.274sqm) resulting in no overall increase in gross floorspace. Permission is also sought for all associated site and development works and reuse of existing signage zones.
Revisions to previously permitted internal modifications as approved under Ref. SD18A/0399 resulting in the reductions in the kiosk zone at Level 2 only by 196sq.m (from 1073sq.m to 877sq.m) to accommodate a new partially enclosed restaurant/café unit (196sq.m) and associated setting; the new restaurant and seating area will correspond with the footprint of the existing Units 260/262 and 263 and will contain associated facilities including a kitchen, front and rear counters, condiment unit, dining tables, chairs, booths and benches; associated signage and development works.
Change of use from 2 existing office units to 2 two bedroom student accommodation units located at first floor level including minor internal modification works and retaining the existing entrances off the main courtyard.
Change of use from existing cafe bar to 15 studios for short-term accommodation / student accommodation / emergency accommodation units on the ground floor to include internal modifications and external modifications with associated private open space and communal facilities; All with associated signage, drainage and site works.
The temporary use (for the next 5 years 2025-2029 inclusive) of part of the eastern carpark lands for the erection of a temporary tent structure for use as an ice rink for a period not exceeding 3 months per year (November - January) and all associated site and development works including plant, lighting, ancillary signage and with pedestrian routes to the shopping centre and associated car parks. The proposal will result in the loss of c.48 spaces for the duration of the temporary ice rink use.
Install additional antennae on top of the existing 40-meter high telecommunications monopole structure to include all ancillary equipment (total height not to exceed 44 meters to the top of the antennae) on behalf of the commission for communications regulation (ComReg). To include associated ground mounted equipment.
(i) Retention permission is sought for the mezzanine floor, stairwell and associated meeting room; (ii) (a) change of use of Unit F1 from cafe to car rental office and erection of partition walls to create a reception area, staff offices, staff mess area, wc, store room and staff canteen at ground floor; (b) upgrade works including replacement of mezzanine floor and stairwell; (c) installation of company signage to front of unit; and (ii) change of use from commercial car park to car rental and car share facility at basement level comprising of the following: (a) removal of 3 car parking spaces to provide for single storey car rental kiosk (28.82sq.m) comprising reception area; (b) redesignation of 30 commercial car parking spaces as car rental spaces (3 car club, 3 staff, 12 return and 12 rental spaces); (c) removal of 7 car parking spaces to provide circulation route, and car washing area (69.18sq.m) comprising 2 power washers, 1 wash pad connected to the existing petrol interceptor in the car park and car drying area. The car wash will connect to the mains water connection; (d) erection of company signage over entrance to car park from Belgard Square North; and (e) drainage and all associated site development and ancillary works necessary to facilitate development.
Mabelground Limited intend to apply for retention permission for development (Large-scale Residential Development (LRD)) comprising amendments to a permitted Strategic Housing Development (SHD) as granted under ABP Reg. Ref. ABP-305763-19 at this c. 1.19 Ha. site at the corner of Airton Road and Belgard Road, Tallaght, Dublin 24, D24 HD35. Retention permission is sought for the following modifications: The amalgamation of 2 No. retail/commercial units (178.5 sq m and 175.4 sq m) to create one larger unit, and the relocation of the ESB substation and switch room from the southern boundary into the retail/commercial floorspace (total retail/commercial unit floorspace is 310 sq m); shell and core provided to the permitted creche (fit-out subject to tenant requirements); modifications to the height of the scheme including a minor increase to the finished floor levels, minor adjustment to the parapet heights including a slight increase of one section of roof by 125mm in Block B, minor increase in the height of the roof level amenity space by 500mm, and increase in the height of a staircore by 2.3 metres at roof level; revised roof design layout including an amended PV panel layout, increased green roof provision from 2,490 sq m to 2,576 sq m (increase of 86 sq m), reduction in plant, and provision of railings to the roof terrace amenity space; removal of the second private terrace accessed from bedroom No. 3 of Unit No. AG.105; removal of en-suite bathrooms from Unit Nos. B1.302, B1.303, B1.307, B2.301, B2.302, B2.303, B2.307, B3.301, B3.302, B3.307, B4.301, B4.302, B4.307, B5.301, B5.302 and B5.307; removal of stairs leading from the surface level courtyard to the basement; modifications to the landscaping strategy for fire safety including the addition of ventilation for the basement and adjustments to the landscaping layout at surface level; elevational changes including amendments to the material finishes, and provision of additional fire escapes on the western elevation; minor internal design changes including the provision of a metering room in lieu of 9 sq m of creche floor area, reconfiguration of staircores, reconfiguration of the refuse store, bicycle parking and disabled parking at basement level, and the provision of an attenuation tank at basement level; and all associated development works above and below ground.
Demolition of the existing industrial buildings on site (4,800sq.m) and the construction of 2 blocks comprising: 328 apartments (93 1-bed, 222 2-bed and 13 3-bed), ancillary residential support facilities and commercial floorspace measuring 31,147sq.m gross floor space above a single basement level measuring 5,861sq.m. Block A is a part-5 to part-7 storey (13,710sq.m) over basement block comprising 149 apartments with office space (222sq.m). Block B is a part-6 to part-9 storey (17,437sq.m) over basement block comprising 179 apartments, 2 double-height retail/commercial (Class 1/Class 2) units (354sq.m), a café/restaurant (313sq.m), a creche (360sq.m), internal residents amenity area (644sq.m) at ground floor including reception (37.7sq.m), residents lounge (91.3sq.m), private dining area (52.6sq.m), co-working space (45.5sq.m), games room (47.3sq.m), gym (80sq.m) and communal lounge (220sq.m) at 6th floor level. The development also consists of the provision of a landscaped courtyard; public plaza at the corner of Airton and Belgard Road; pedestrian access from Airton Road to the Technological University campus; balconies; landscaped roof terrace at 6th floor level (7th Storey) of Block B (671sq.m); 184 car parking spaces at basement level including 14 club car spaces, 10 disabled parking spaces and 4 creche parking spaces; 727 basement and surface bicycle parking spaces; 4 motorbike parking spaces; bin storage; boundary treatments; green roofs; hard and soft landscaping; plant; lighting; Vodafone cabin sub-station; ESB sub-stations, switch rooms and generators; and all other associated site works above and below ground.
Mabelground Limited intend to apply for permission for development (Large-scale Residential Development (LRD)) comprising amendments to a permitted Strategic Housing Development (SHD) as granted under ABP Reg. Ref. ABP-305763-19 at this c. 1.2 Ha. site at the corner of Airton Road and Belgard Road, Tallaght, Dublin 24, D24 HD35. The proposed amendments comprise revisions to the permitted site entrance from Airton Road to the north including the provision of a new island and dished kerbs.
Demolition of existing commercial building (736sq.m) and construction of a single storey cafe/restaurant (79sq.m); single storey bicycle workshop building (32sq.m); improved public realm area to include seating; bicycle parking (60 spaces) and hard and soft landscaping and all associated site and development works.
The proposed development will consist of amalgamation (including removal of internal mezzanine areas) and change of use of Units U133ABC (former An Post) and U133D (former Bodytalk) from Post Office and Retail Use respectively (both Class 1 “shops”) to accommodate a restaurant/ takeaway unit (243sqm) for consumption of hot food on and off the premises, modifications to existing shopfront signage, new tenant sign on eastern elevation and all associated site and development works
Change of use from office to medical/dentist use with revisions to front elevation.
Temporary change of use of part of unit 70 from light industrial to indoor gymnastics sports facility and associated site works.
3 signs (1m metre high x 4.5 metres wide aluminium back panels with individual raised illuminated lettering) on the existing tower feature on the western elevation of The Square; 1 sign (1.2m meter high x 6.1 metres wide aluminium back panel with individual raised illuminated lettering) positioned externally on the southern elevation of The Square (south eastern corner).
The development will consist of the provision of a new glazed entrance lobby (24sqm) at the existing west entrance to the Square Shopping Centre (Level 3) and all associated site and development works.
The sub-division of a vacant commercial/retail unit measuring 309.4 sq.m m; the change of use of Unit No. 2 to an education/day centre use (142.3 sq.m m); and associated signage.
(i) Demolition of the existing industrial buildings (2,518sq.m);(ii) Construction of a 'build-to-rent' housing development providing a total of 245 residential apartments (comprising 69 studio units, 56 one-bed units and 120 two-bed units) in a six to eleven storey building over basement. Each apartment has associated private open space in the form of a ground floor terrace or a balcony and has access to 21 communal amenity spaces (totalling 880sq.m), including a communal gym (82.5sq.m), and a ground floor level landscaped courtyard. The development is served by an underground carpark (accessed from the Cookstown Road extension currently under construction) providing a total of 79 parking spaces (including 75 standard spaces and 4 mobility impaired user parking spaces), and 468 bicycle spaces (388 resident spaces at basement level and 80 visitor spaces at ground floor level in the central courtyard and on street);(iii) 2 commercial units (comprising 129.4sq.m and 126.5sq.m and accommodating Class 1, 2 and 8 uses as per the Planning and Development Regulations, 2001-2019, as amended) at ground floor level; (iv) associated site and infrastructural works are also proposed which include: foul and surface water drainage; attenuation tanks; lighting; landscaping; boundary fences; plant areas; ESB substations; internal hard landscaping, including footpaths and street furniture; and all associated site development works.
The amendments to the permitted development will consist of: 1. Reduction in the overall height and internal and external re-configuration of permitted development resulting in the omission of 1 no. floor in Block A and C, and 2 no. floors of Block B to comply with Condition 2 of the permitted development. This will result in an overall reduction in units in the permitted development by 55 no. units from 252 no. units to 197 no. units; 2. Omission of 41 no. studio apartments which will be replaced with 15 no. 1-beds, 13 no. 2-beds and 2 no. 3-bed units including any associated elevational changes to balconies and window openings; 3. Revised layout at ground floor to remove podium courtyard, parking and service area which will be replaced with a new underground car park, entrance and service area; 4. Relocation of permitted creche to the ground floor corner of Blocks B and C and inclusion of an associated outdoor play area resulting in the omission of apartment no. 40 and relocation of tenant amenities/ community space to Block A to comply with Condition 2 of the permitted development; 5. Inclusion of plant equipment at roof level; and, 6. Inclusion of a blue roof drainage system at roof level of all permitted apartment blocks. 7. The development also includes all site development works necessary above and below ground necessary to facilitate the development.
(i) Demolition of the existing industrial buildings, (ii) construction of: (a) 252 'build-to-rent' apartments in a two to nine storey development. Each apartment has associated private open space in the form of a ground floor terrace or a balcony and has access to 613sq.m of internal communal amenity space (including a concierge and management facilities, communal gym, flexible meeting rooms, library/co-working space, lounge, cinema/multimedia room and external covered game area); 1792sq.m of external communal amenity space at first and second floor levels; and a 65sq.m external covered communal amenity area at first floor level. The development is served by an under-croft carpark accessible from the south-western corner of the site providing a total of 73 parking spaces (including 58 standard spaces, 10 go-car spaces and 5 mobility impaired user parking spaces) and 500 bicycle spaces at ground floor level (372 resident spaces and 128 visitor spaces); and (b) 2 commercial units (comprising of a 95sq.m unit accommodating a café/restaurant and a 145sq.m unit accommodating Class 1, 2 and 8 uses as per the Planning and Development Regulations, 2001-2019, as amended) and a 275sq.m crèche, with associated 86sq.m play area, at ground floor level; (iii) road, junction and streetscape upgrade works along Fourth Avenue and Cookstown Road, including the installation a signalized junction at the intersection of Fourth Avenue and Cookstown Road; (iv) Construction of a temporary access road along the southern site boundary; and (v) associated site and infrastructural works are also proposed which include: foul and surface water drainage; attenuation tanks; lighting; landscaping; boundary treatment; plant areas; ESB substations; and all associated site development works.
(i) Demolition of the existing industrial buildings, (ii) construction of: (a) 252 'build-to-rent' apartments in a two to nine storey development. Each apartment has associated private open space in the form of a ground floor terrace or a balcony and has access to 613sq.m of internal communal amenity space (including a concierge and management facilities, communal gym, flexible meeting rooms, library/co-working space, lounge, cinema/multimedia room and external covered game area); 1792sq.m of external communal amenity space at first and second floor levels; and a 65sq.m external covered communal amenity area at first floor level. The development is served by an under-croft carpark accessible from the south-western corner of the site providing a total of 73 parking spaces (including 58 standard spaces, 10 go-car spaces and 5 mobility impaired user parking spaces) and 500 bicycle spaces at ground floor level (372 resident spaces and 128 visitor spaces); and (b) 2 commercial units (comprising of a 95sq.m unit accommodating a café/restaurant and a 145sq.m unit accommodating Class 1, 2 and 8 uses as per the Planning and Development Regulations, 2001-2019, as amended) and a 275sq.m crèche, with associated 86sq.m play area, at ground floor level; (iii) road, junction and streetscape upgrade works along Fourth Avenue and Cookstown Road, including the installation a signalized junction at the intersection of Fourth Avenue and Cookstown Road; (iv) Construction of a temporary access road along the southern site boundary; and (v) associated site and infrastructural works are also proposed which include: foul and surface water drainage; attenuation tanks; lighting; landscaping; boundary treatment; plant areas; ESB substations; and all associated site development works.
Change of use from retail unit to unit for Day Care Centre use along with signage.
Located on a section of Belgard Square South. The development includes the closure of the slip road from Belgard Square South onto the N81. This development is proposed to accommodate the increase in the volume of buses in the area as a result of the changes proposed under BusConnects. The volume of buses is set to increase from 22 to 49 buses per hour. It forms part of Government efforts to improve public transport and address climate change nationally, supporting national strategies such as the National Development Plan 2021 - 2030 and the Climate Action Plan 2023. The layover facility will be comprised of bus parking for 10 buses and welfare facilities for drivers. The development consists of two separate parking areas with 7 bus bays in the south layover and 3 in the layby to the north of Belgard Square South. There will be one entrance point into the layover area located on the southern side of Belgard Square South. This layover area will have 2 egress points with a right turn ban in place. There will be a layby located on the northern side of Belgard Square South, across from the layover area. The layover area includes a bus driver welfare facility comprising of two toilet units. The proposed Development includes the closure of the hard shoulder on the northern side of the N81 to accommodate the realignment of the cycle track along the N81. The proposed development includes all the associated works to facilitate the bus layover and welfare facility. This includes drainage works, utility diversions, public lighting, fencing and landscaping. The overall area of the site is approximately 0.7 ha.
Two bedroom, double storey house.
28m of new secure metal fencing.
Mixed use commercial extension (9,956sq.m gross floor space) to the southern side of The Square Shopping Centre and a new public plaza and all associated site and development works including new signage; Level 1 - no changes; Level 2 - removal of southern mall entrance lobby and construction of new extension to existing Level 2 mall to include 6 retail units (2,611sq.m), a food hall/market hall area for multiple restaurant/food and beverage type uses with associated seating areas (2,041sq.m), a restaurant/cafe unit (67sq.m) and associated ancillary accommodation and circulation (1,534sq.m) and plant rooms (176sq.m) and introduction of new internal service corridor; Level 2 extension is replacing surface parking spaces (140) to the south of the shopping centre and an existing parking area (34 spaces) to the east of the proposed extension is to be reconfigured; creation of Level 3 entrance and creation of new public plaza to replace roof car park (111 spaces) and the new outdoor public plaza (0.74ha) will be used for multi-purpose events, civic and recreational uses and retail and food and beverage concessions involving temporary moveable structures erected on a seasonal basis; the creation of the new Level 3 entrance involves replacement of existing retail unit at Level 3 (Unit 307A) with mall area to include flexible kiosk type retail concession areas; 2 buildings accommodating 9 restaurant/bar units (3,324sq.m) and ancillary accommodation (175sq.m) and associated outdoor seating areas in the new plaza on south facing terraces; Level 4 - ancillary accommodation and service areas (28sq.m) on roof of 2 restaurants buildings within provision for screened plant areas and solar panels; the proposed extension has a maximum building height of 18 metres above existing ground levels; the extension is to replace and supersede the Plot B development previously permitted under Reg. Ref. SD13A/0192 (Bod Ref. PL06S.243280) which included a gross floor space of 5,684sq.m; the permitted northern extension (Plot A) remains unchanged. Permission is sought to amend Condition 3(a) of the Reg. Ref. SD13A/0132 (Bord Ref. PL06S.243280) to facilitate the construction of the proposed southern extension prior to the permitted northern extension (Plot A) subject to a phasing programme to be agreed.
Change of use of the fifth floor level from office to hotel use to provide for 26 hotel suites; Associated modifications to the layout and elevations at fifth floor level and to the stair cores at ground to fifth floor levels to facilitate access and egress; Introduction of lobbies to the stair cores at basement level; Provision of a green roof to the existing building on site; Revisions to the existing car and bicycle parking arrangements at basement level; All associated site development works.