Planning records
Showing 1-7 of 7 public recordsThe proposed development will consist of the amalgamation of existing Unit 54 (c. 174 sq.m) and existing Unit 55 (c. 201 sq.m), both retail use, into a single retail unit of c. 381 sq.m through the removal of the existing partition wall between the two units. New internal centre façade for the amalgamated unit to include for 2 no. banner signs of 6.4m x 1.25m.
Development and modifications to development permitted under SDCC Reg Ref. SD23A/0068 as follows: 1. The extension of the Yellow Mall Entrance Lobby area, with a total floor area of 66 sq.m, relocated between Unit 20 and proposed Unit 21B and the extension of the Mall Area by c. 77 sq.m, resulting in an increase of the parapet height of the canopy over the Yellow Mall Entrance Lobby and units by 200mm; 2. The subdivision of Unit 21 as permitted under SD23A/0068 to create 2 no. separate units namely Unit 21A and 21B (as food / beverage units) with a gross floor area of approximately 178 sq.m and 196 sq.m respectively; 3. The removal of the ATM on the eastern facade of Unit 20, and related services located internally within Unit 19, resulting in a decrease in floor area of Unit 19 and increase of floor area of Unit 20 by c. 6 sq.m; 4. Change of Use of Unit 20 from retail use (permitted under SD23A/0068) to food / beverage use; 5. Minor facade amendments to the Unit 20 and proposed Unit 21B to remove glazing and replace with solid facade panelling in line with fire safety requirements; 6. The addition of 8 no. PV panels to serve the extended Entrance Lobby, and all necessary infrastructure and connections for a further 5 no. PV panels if required by Unit 21A in the future, all at roof level to the west of the glazed drum; 7. All associated site development works.
Demolition and removal of the existing entrance canopy at first floor level and the construction of a new entrance canopy over extended units. Replacement of existing Liffey Valley signage on the northern elevation with a new sign of 3.Sm x 8.35m. Upgrading of the existing northern elevation facade to a render finish. New tinted transparent window vinyl to be applied internally to the existing drum's glazing; Extension of the existing Units 20 and 21 into the existing plaza to facilitate increased units of 240sq.m and 380sq.m; Extension of Unit 19 to provide for relocation of ATM and ancillary back of house area (6.7sq.m) on the eastern elevation of the extended Unit 20; The total additional floorspace is 394.7sq.m; Unit 20 is proposed as a retail unit and Unit 21 is proposed as a food/beverage unit; Facade signage is proposed on the northern elevation of both units (0.625m x 5.09m) and on the eastern elevation of Unit 20 and western elevation of Unit 21 (both 0.665m x 2.16m) (total unit facade signage of 9.24sq.m); Relocation of existing 6 accessible car parking spaces, currently located to the north of the entrance/plaza, to within the existing car park and landscaping of proposed site in line with recently upgraded landscaping in the centre; The placement of 2 car-parking pay station units with canopy to the east and west of the site adjacent to the existing Centre facade; All Associated Site Development Works.
NEXT PLC are applying for permission for the replacement of 2 x (internally illuminated) external signs 1.9m x 6m and 1 x (internally illuminated) external sign 1.5m x 4m.
Amendments to the permitted development previously granted under SDCC Ref. SD19A/0320 and An Bord Pleanala Ref. 306251-19; including the erection of 2 bus shelters on Fonthill Road each comprising of a bus stop sign, real time passenger Information (RTPI) unit and a two-sided internally illuminated advertising panel (c. 1.9sq.m each side); road alterations on Fonthill Road comprising of the amendment of staggered to straight Toucan crossings, the addition of a new straight Toucan crossing, the replacement of bus lay-by areas with bus islands, and the removal of a left slip lane; all associated site services and site development works.
Mixed leisure, entertainment and retail extension to the existing Liffey Valley Centre organised around a large public plaza and pedestrian friendly east-west street with parapet levels varying between c.15m and c.18m above street level; the scheme provides for: (a) a two storey commercial extension (c.46,783sq.m gross) with plant areas at roof level to the existing Centre providing for mixed leisure and entertainment units (c. 9,247sq.m gross), food/beverage units (c.4,052sq.m gross), retail units (c. 21,051sq.m gross) and all ancillary space and circulation areas (c.12,433sq.m gross); the main retail area will be anchored by two stores (comprising a total of c.10,090sq.m gross) located on either side of the public plaza; (b) a central public plaza fronting onto the east-west street covered with a large glass canopy in the form of a curved gridshell structure, this structure will be the tallest part of the proposal at a height of c. 20m above street level, the food/beverage units are located around the plaza at both ground and first floor levels; (c) car parking over two levels (c.900 spaces including 45 universal access spaces and c.200 long stay cycle spaces with an area of c.27,917sq.m gross) located north-east of the extension area c. 290 short stay cycle spaces, 27 short stay car parking spaces and car/taxi set down areas on the east-west street; c.100 long stay cycles spaces provided within the existing car park to the adjacent to the Westend development (Vue Cinema and restaurants); approximately 2,085sq.m of existing gross floor space is to be removed/demolished over ground and first floor to facilitate the extension; the proposal includes all associated service yards, plant and equipment, photovoltaic panels, electricity substations, all utility connections and works, street lighting, signage, landscaping and boundary treatments; the proposal includes the construction of new toucan crossing points for cyclists on Ascail an Life (Ring Road around the Centre) at the western end of the east-west street to provide safe connection to the existing cycle network. An Environmental Impact Assessment Report (EIAR) is submitted.
Retention of coffee shop use & internal seating area within shop unit at ground (79sq.m); provision of additional internal seating area of 51sq.m; new shop opening onto shopping mall and seating area of 15sq.m within the mall directly in front of shop unit; all associated site services & development works.