Showing 1-14 of 14 public recordsUniversity College Dublin intends to apply for permission for development on a site of c. 7.56ha at the University College Dublin Campus, Belfield, Dublin 4 (the overall campus includes Protected Structures). The proposed development comprises modifications to the Landscaping and Infrastructure Enabling works as part of the Future Campus Phase 1 proposals permitted under D20A/0030 (307514-20). The proposed development will consist of: (1) Omission of previously permitted 3 no. Mechanical and Electrical Plant (MEP)/services compounds and Plant facilities with a combined area (c. 723 sqm), generally located to the north west of the Clinton Auditorium and the south west of the Engineering and Materials Science Centre; (2) The single storey Ardmore Annex (c. 1,300 sqm) a standalone building located to the north east of Ardmore House (a Protected Structure) was permitted for demolition and is now to be retained on site. (3) Reinstatement of original access route at the main Belfield entrance for pedestrian/cyclist use only, modifications to previously permitted landscaped arrival plaza with associated new interim landscaped tie in works. (4) Omission of permitted covered cycle parking area located at rear of Centre for Future Learning and area to be landscaped. A new relocated covered bike parking area is proposed in area of now omitted MEP services compound. A total of 104no. covered bike parking spaces, 84 uncovered bike parking spaces and 10no. cargo bike spaces are proposed in this area. The overall provision of cycle parking spaces is reduced from 581 to 429 (including 104 covered spaces, 27 bike lockers and 10 cargo bike spaces).
Permission for installation of two monolith signage to the north east and east of the Belfield campus along Stillorgan Road. Signage will measure 6m x 2m and feature back-lit UCD Logo in a black/stainless steel finish.
We, University College Dublin, intend to apply for permission for development at this site extending to c. 3.83 hectares on lands at the UCD Sports Precinct east of Newstead and north of the Campus Ring Road (extension of Wynnsward Drive), University College Dublin, Belfield, Dublin 4. The development includes amendments to permission granted under Reg. Reg: D23A/0163. The development will consist of the omission of two canopies at entrances along the eastern elevation of the permitted multi-Purpose Performance and Events Centre (MPPEC) and minor landscape works. The first canopy is located above the entrance to the entrance lobby at lower ground floor level in the northern section of the building. The second canopy is located above the entrance to the main foyer at ground floor level in the northern section of the building. Minor landscape works including the omission of the permitted retaining wall adjacent to the eastern elevation at the southern part of the building are also proposed. No other changes to the permitted development are proposed.
Development on a site at University College Dublin, Belfield, Dublin 4. The application site comprises of lands known as the Little Sisters Car Park, located to the south-west of Belgrove Student Residences. The development will consist of the permanent, continued use of the established car park, comprising 224 no. existing car parking spaces, originally permitted under D20A/0328 (and limited to a three-year duration under Condition 3). No new works are proposed as part of this application.
The proposals comprise buildings, sports pitches and landscaping forming Phase 2 of the planned wider phased redevelopment of the UCD Sports & Student Amenities Precint (Phase 1 application reg. ref. D22A/0828). The development will consist of the construction of a multi-Purpose Performance & Examination Centre over three floors comprising a multi-purpose sports hall (c. 4500 sqm, c13.3 metres in height) performance centre (c. 2260 sqm, c. 15.8 metres in height) and tennis centre (c.3425sqm. c.13.3 metres in height) providing 5 no. indoor tennis courts and all associated facilities including plant area at lower ground floor area (c. 395 sqm) located to the west of the existing UCD Sports Centre and additional roof level plant and green roof. Landscaped area and 'Sports Plaza' providing informal recreation, pedestrian and cycle connections to the west and south of the proposed buildings and a skills wall in the northern part of the site. 1 no. existing tennis court in the southern part of the site to be retained with 2 no. courts removed. Additional pedestrian and cycle connections are provide to the east of the proposed buildings providing links to the adjoining uses with 4 no. accessible car parking spaces ( 1 no. EV charging point) and set down area and cycle parking and the removal of 164 no. car parking spaces and relocation of 3 no. 5-a-side soccer pitches. Works to existing student centre to provide alternative fire escape. All associated access (Campus Ring Road), infrastructure and works to facilitate the development including 1. no. substation and 1 no. water pumphouse. 9 no. signage zones are included on the southern, western and eastern elevations of the MPPEC building providing a total of c.255 sqm.
Permission for development at this site extending to c. 1.43 hectares at Astra Hall / UCD Student Centre, North of the Campus Ring Road, University College Dublin, Belfield Dublin 4. The develpment will consist of a single storey extension (c. 215 sqm) of the existing Astra Hall / UCD Student Centre extending from the eastern elevation of the building (c. 795 sqm total proposed floor area), reconfigured landscaping and relocated cycle parking (158 no. spaces) and all associated works. 2 no. signage zones on the eastern and southern elevations totalling 35 sqm.
Permission for part change of use of an existing permitted retail unit (367sqm), within the Ground Floor of the Vilage Building (reg. Ref. 06D.TA0001) to retail use with ancillary off licence sales (16sqm).
Permission for development. The proposed development will comprise the comprehensive refurbishment of the existing 3 storey Biology (West) and the 4 storey Physics (North) buildings (existing c. 13,356sq m) at the O'Brien Centre for science with the provision of a 4 storey new clip-on structure extension and 1no. Additional floor (c. 7,893sq m Gross Floor Area) to the West building and a new 4 storey link (c. 1,628 sq m gross Floor Area) connecting the two buildings, and South and a new stair core (c. 143 sq m) to North (c. 23,020 sq m Gross Floor Area overall) to provide overall contemporary lab space, offices, workshop spaces, meeting rooms and teaching spaces along with other ancillary facilities. The development includes demolition works to the facade of the buildings; upgrading of the existing concrete structures; addition of new pedestrian entrance at the north west junction, relocation of 90 no. bicycle spaces to the north of the West Building and the provision of 126 no. additional bicycle parking spaces in a cycle parking structure adjacent the Hub building, relocation of 4no. accessible car parking space. It is proposed to provide an underground attenuation tank in an area north of the UCD Students Union building, an extended generator compound south of the existing substation building, and to provide a new waste storage enclosure (c.108 sq m) in an area north-west of the UCD Computer Centre. Green roofs are provided at roof level and the proposal includes all site services, drainage works above and below ground, plant, landscaping and all associated ancillary site development works, There are no works proposed to the existing Protected Structures within the University College Dublin Campus as part of this planning application.
Permission is sought for development. The development will consist of 1 no. additional floor to Block E; 1 no. additional floor to Blobk K; 2 no. additional floors to Block H; a new 3-storey link building between Blocks H and K with ramped nd stepped access; new glazed lonks at second floor level between Blocks E and H, Blocks E and D and Blocks E and F; photvoltaic panels at roof level; access doors to roof, internal alterations and all assocaited site works, with a combined propsoed gross floor area (GFA) of approximately 2,296sqm at Newman (Arts) Building, University College Dublin, Belfield, Dublin 4.
Permission is sought for the
Permission for development. The application site comprises
Permission for development. The proposed development relates to Landscaping and Infrastructure Enabling works as part of the Future Campus Phase 1 proposals. The proposed development will consist of: Significant Public Realm improvements within the campus including: modifications to existing entrance arrangement (including replacement of existing gates) and provision of new arrival plaza at the main entrance to the University College Dublin campus at Belfield. Provision of a shared space pedestrian/cyclist spine route within the campus area from the new entrance / arrival plaza the east of the existing Tierney Building. Creation of new extensive landscaped public realm areas (including the Ardmore Quad and the area to the south east of Ardmore House - a Protected Structure) including a new network of shared space pedestrian/cycle routes, resurfacing works and an upgrade of existing pedestrian facilities within the application boundary. Construction of the following structures: 3 no. Mechanical and Electrical Plant (MEP)/services compounds and Plant facilities with a combined area of ( c. 723sqm), generally located to the north west of the Clinton Auditorium and the south west of the Engineering and Materials Science Centre. Demolition of the following buildings and structures: security hut/entrance booth (c.40 sqm) located at the main campus entrance. The single storey Campus Bank building (c.340 sqm). The single storey Ardmore Annex (c. 1,300 sqm) standalone building located to the north east of Ardmore House (a Protected Structure). The existing Mechanical Electrical Plant (MEP)/services plant area (with a combined area of c. 96.5 sqm) and all associated external apparatus generally to the south west of the existing Engineering and Materials Science Centre. The removal of the existing entrance gates and associated elements. The making good and levelling of ground following removal of buildings/plant (as necessary) and all associated temporary landscaping measures. The proposal also provides for: diversion and reconfiguration of the existing internal road network within the application boundary and provision of 1 no. gyratory providing vehicular access/egress to/from the existing car park (at the north eastern boundary of the site), the reconfigured Engineering car park and Belfield House (a Protected Structure). Extensive hard and soft landscaping proposals throughout, including the removal of existing trees, implementation of mitigation measures to retain existing trees and extensive replacement planting / of native trees and all associated tree protection measures, landscaping boundary treatments, campus lighting, a new entrance sign (double sided) - c. sqm each) within the new arrivals plaza. Provision of no. cycle parking facilities throughout the new public realm areas. Reconfiguration of the existing Engineering car park to accommodate a total of 14 no. car parking spaces (including 8 No. accessible spaces). Permanent reconfiguration and extension of the existing car parking area and all associated elements (on lands at the former running track and adjacent car park 6) to provide 680 no. car parking spaces. Including 323 no. car parking spaces (including 32 no. E Car spaces) relocated from the existing Tierney car park and Engineering car park, as well as 357 no. car parking spaces (of which 335 were granted temporary retention permission under Dun Laoghaire Rathdown County Council Planning Register Reference D18A/0244). All associated ancillary elements including associated ancillary plant, site services, all associated drainage works (including provision of attenuation tanks and SuDs measures) and all associated site development works. There are no works proposed to the existing Protected Structures within the University College Dublin campus as part of this planning application.
Permission for development on a site of c.0.41 ha
Permission for development. The proposed development relates to the provision of an academic building (the Centre for Creativity - c. 13,184sqm Gross Floor Area including basement) and all associated elements as part of the Future Campus Phase 1 proposals. The general height of the proposed building ranges from c.18.6 m up to overall height of c.48.88m (up to the highest of the proposed tower elements). The Centre for Creativity includes the provision of a study centre, a lecture theatre, workshop/studio/classroom facilities, ancillary exhibition spaces and all associated ancillary areas/facilities. The proposed development will consist of: Level 0 - Educational facilities including - forum (foyer/reception), study centre, UCD experience area, equipment room and demonstration spaces, workshops, studios/maker space areas, retail area, café and all associated ancillary areas/facilities. Level 1 - (including mezzanine areas) - Educational facilities including study centre, UCD experience areas, creative teaching spaces, offices and all ancillary support facilities. At mezzanine level - Educational facilities including study centre, workspaces, offices and all associated ancillary areas/facilities. Level 2 - Educational facilities including a lecture theatre, UCD experience area, studios/classrooms/study areas and all associated ancillary areas/facilities. Level 3 - Educational facilities including studio/classroom/study areas, UCD experience areas and all associated ancillary areas/facilities. Level 4 - Educational facilities including UCD experience area, creative teaching spaces, studios and all associated ancillary areas, facilities. Level 5,6 and 7 - Educational facilities including UCD Experience areas and all associated ancillary areas/facilities (including an observation areas at Level 7). At basement Level - Associated ancillary plant facilities, storage and ancillary areas/facilities, storage and ancillary areas/facilities. At roof level over part of level 2 and level 4- provision of a sedum roof (with a combined area c. 1184 sqm) and Photo Voltaic panels (with a combined area c. 230 sqm) and paved terrace (c. 270 sqm), associated plant, roof lights and roof access. The proposals also provides for associated landscaping including a stepped reflective pool (located at part of the south-west, north-west and north east elevations of the proposed Centre for Creativity) fronting the new campus Arrival Plaza (part of a separate planning application). an external south-facing courtyard forming part of the new Ardmore Quad (part of a separate planning application), an external service area, an external workshop terrace area at ground floor level, external storage facilities (c.91 sqm) and all site services and associated site development works. There are no works proposed to the existing Protected Structures within the University College Dublin Campus as part of this planning application.