Planning records
Showing 1-3 of 3 public recordsThe proposed LRD includes the demolition of the existing vacant manufacturing building on site, all associated site clearance and enabling works, and the construction of a residential development (Phase 2 development of the overall landholding) comprising 178 no. apartments, and a childcare facility, in 3 no. buildings (Blocks 1,2 & 3), ranging from 3 to 4 no. storeys in height, over a basement level. Vehicular access will be via the existing access from Vevay Road and via a new vehicular access from Boghall Road. The proposed development includes public open space, communal open space, boundary treatments, hard and soft landscaping, bin stores, an ESB substation and cycle lift, external fire escape cores, plant rooms, green roofs, and PV panels at roof level. All associated site and infrastructural works
The proposed development relates to the demolition of the existing vacant manufacturing building on the site, erection of temporary boundary fencing and gates, and all associated site works.
The construction of a first phase of development on the overall landholding consisting of the following: a) A three storey Nursing Home building, accommodating 144 no. bedrooms and ancillary resident and staff facilities, with a total GFA of 8,666sq.m. The proposal includes PV panels and a plant area at roof level, two signage zones, internal courtyards and terrace areas, an adjacent landscaped amenity space and a service yard area; b) A part three and part four storey office building, including plant area at roof level, with a total GFA of 3,354sq.m.; c) Internal access roads and parking, comprising 121 no. surface car parking spaces and 115 no. cycle spaces to serve both uses. Vehicular access will be via the existing entrance from Vevay Road; d) An ESB substation, all associated site and infrastructural works, including removal of existing hard surfacing, public lighting, landscaping and boundary treatments, bin storage, foul and surface water drainage, including attenuation tanks, all on a site area of c. 1.66 ha. The proposals will supersede the development permitted under WCC Reg. Ref. 18/1181 / ABP Ref. 304425-19