Planning records
Showing 1-3 of 3 public recordsThe development consists of: the construction of a new detached, two storey, three bedroom dwelling, and re-use of an existing site entrance, together with a new wastewater treatment system, percolation area and all associated siteworks. AI Rcvd 05/06/24 CAI received 09/07/24 SAI Rcvd 17/07/2024
The development will consist of the construction of a part single storey, part two storey house, waste water treatment unit and percolation area and new entrance on to the public road.
For two storey house and waste water treatment system and surface water soak away, using existing vehicular entrance and driveway off public road, with new internal domestic driveway. The existing hedgerow and trees along the front site boundary to be retained and a timber post and rail fence is proposed along internal site boundary.