SD25A/0139W

The development shall consist of the phased partial demolition, reconstruction and extension of the existing Bakery Production and distribution complex at their expanded site in Greenhills Industrial Estate. The overall development shall consist of a number of consecutive phases designed and implemented to ensure the maintenance of the ongoing operations of the facility namely: 1) Area 1 a. Demolition of the existing Varian brushes building which forms part of the expanded site. b. Creation external staff parking area constructed the North Eastern End of the site along with a new Public footpath and cycleway constructed around the Northern Boundary and providing access from St James Road into and through Greenhills Industrial estate. c. New Boundary wall formed with a brickwork wall with piers and Steel fence to match existing. d. Van Loading Building measuring 3082m2 on plan with a height of circa 5m at eaves level. The building shall be formed with a curved green roof with Solar panels and a step at the external elevation to reduce massing to the surrounding properties. The building shall be externally clad with Insulated Microrib panel which shall be augmented on the Southern and South Eastern elevations with Acoustic protection to minimise the operational noise at the boundary. 2) Area 2 a. Demolition of the existing centrally located two storey Office & Welfare accommodation and Van loading canopies. b. Construction of new Welfare Accommodation housing the Staff facilities including Staff Entrance, bike parking, Changing areas, toilets, canteen and office. Facility shall be formed in a Two storey concrete building clad with rendered blockwork to a parapet level and punctuated with windows along the Northern elevation. The footprint shall measure 829m2 and the overall height to parapet shall be 11m2. The roof shall house a mixture of green roof and solar panels. c. Reroofing and expansion of existing Packing operations to the South and adjoining the New Welfare Accommodation. Construction shall be of Structural Steel lattice girders supporting a mixture of Trapezoidal Insulated roof panels and built up insulated roof system. The Southern wall shall be externally clad with Insulated Microrib panel which shall be augmented on the Southern and South Eastern elevations with Acoustic protection to minimise the operational noise at the boundary. The extended Packing area shall measure 1273m2 on plan with a general height above floor level of 10.5m. 3) Area 3 a. Construction of new Bakery Facility on the site of the existing Car Park and loading area at the North Western edge of the site, directly adjoining the existing facility. The bakery shall measure 3007m2 and shall be 11m high at the boundary stepping up to 14m on the Bakery proper and 18m on the North Western Corner. The facility shall be completed with a mixture of rendered blockwork and brick work panels with high level windows into the Production area. The bakery shall be constructed of Structural Steel lattice girders supporting Trapezoidal Insulated roof panels solar panels. b. Demolition of the existing services area at the Western boundary. c. A three storey Plant and Process Area shall be constructed on the Western elevation and shall be constructed in a Concrete frame and clad with insulated Cavity walls finished with a mixture of Brick and Plastered blockwork external Elevations. The construction shall be completed with a tower structure in the North Western Corner. Roof Construction shall be an insulated built up system supported from a precast concrete superstructure. d. Reroofing of the existing batch and Multiplant Bakery areas to the South and adjoining the New Bakery. The existing low double pitch roofs shall be removed and a new higher Structural Steel lattice girder structure supporting a mixture of Trapezoidal Insulated roof panels and built up insulated roof system installed along with Solar Panels. e. Reroofing and regeneration of the existing Pan Plant located on the Southern boundary to consist of the replacement of the existing external envelope of the building. 4) Area 4 a. Demolition of the existing Administration office and Silo Enclosure. b. Construction of a new three Storey Office block with ground floor covered car parking. The building shall be completed in a concrete frame and precast concrete floors. The facility shall be completed with a mixture of rendered blockwork and brick work panels with strip windows to the Western elevation. c. Realignment of the existing Flour Silos and the installation of four additional silos which hall shall be contained within a Micro rib clad steel Enclosure for visual purposes. d. Alterations to existing boundary and the creation of a new car park and Intake Vehicle unloading area including the relocation of the existing entrance gates and the addition of a new gateway specifically for the office area. e. Redefinition of the existing boundary treatments and improvements to the existing internal estate footpath network with increased definition of cyclist facilities and road separation. Improved lighting installations to the environs of the development and adjoining areas. f. Installation of Sustainable surface water drainage and retention systems to all upgraded areas.

Brennans Bakeries, Greenhills Industrial Estate, Greenhills Road, Walkinstown, Dublin 12, D12 XR92.South Dublin County CouncilPermission0 reasons0 conditions
Granted08 December 2025
LRD25A/0002W

The development will comprise the following: Demolition of existing commercial/industrial buildings on site (c.6,711 sq.m in total). Provision of a mixed use, residential and commercial/employment development (c.49,275 sq.m GFA excluding undercroft) within 4 no. blocks ranging in height from 6 to 10 storeys. The development will provide 436 no. apartments (all with individual private open spaces) consisting of: 2 no. studios, 180 no. 1-beds, 158 no. 2-beds and 96 no. 3-beds. The development will also include: internal residential amenity spaces (c.375.3 sq.m in total); community library (c.352.1 sq.m); creche (c.359.1 sq.m), and 4 no. commercial/employment units (c.1,226.6 sq.m) comprising 2 office/co-working units (c.435.8 sq.m in total), medical centre (with ancillary pharmacy)(c.674.1 sq.m) and café (c.116.7 sq.m). • Block A - 9 to 10 storeys in height and will provide 81 no. residential units. • Block B - 9 to 10 storeys in height and will provide 137 no. residential units • Block C - 8 to 10 storeys in height and will provide 85 no. residential units • Block D - 6 storeys in height and will provide 133 no. residential units. Upgrades to the western side of the Parkmore Estate Road and along the Long Mile Road and Robinhood Road to provide a variety of pedestrian/ cyclist access points to the development and with vehicular access provided from the Estate Road with associated upgrades to the Estate entrance. The development will also include 173 no. car parking spaces within 2 no. undercroft car parks on site and including 12 no. parking spaces (for the commercial units) along the Long Mile Road frontage. Provision of 1,040 cycle parking spaces. Provision of public and communal open spaces, landscaping, boundary treatments, plant areas, waste management areas, and services provision (including ESB substations), and all associated works required to enable this development including connection to the Uisce Eireann network. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development.

Units 16-21A-B, Parkmore Industrial Estate, Longmile Road, Walkinstown, Dublin 12South Dublin County CouncilPermission0 reasons0 conditions
Granted28 July 2025
SD23A/0187

Internal reconfiguration and first floor internal extension (98.36sqm) to the existing light industrial unit (total gross floor area of building increases from 1003.9sqm to 1102.26sqm) and change of use to accommodate warehousing / distribution, professional trade support and training services, showroom for display and sale of painting products, ancillary offices and all associated staff accommodation. Permission is sought for revisions to the existing parking and servicing / delivery areas within the site via existing vehicular entrances from Elm Road and Chestnut Road, minor changes to the southern elevation, new building mounted signage and all associated site and development works associated with the above.

UNIT 21, Elm Road, Western Industrial Estate, Dublin 12South Dublin County CouncilPermission0 reasons0 conditions
Granted05 January 2024
SD23A/0158

Alterations to the development permitted under Reg. Ref.: SD18A/0068, as previously amended under Reg. Ref.: SD19A/0185 and Reg. Ref.: SD20A/0242, and to the development permitted under Reg. Ref.: SD20A/0309, as previously amended under Reg. Ref.: SD22A/0093. The proposed alterations in summary comprise the provision of an altered energy centre design and all associated development, along with minor alterations to the permitted site layout, provision of a gas AGI, and all ancillary works. The development, for which a 5-year planning permission is sought, will comprise the following: Construction of a revised energy centre in the western part of the subject site, to accommodate alternate generation technology, including 10 no. gas generation turbines (all with associated flues, 8 no. c. 33 metres (m) in height and 2 no. c. 15 m in height), 2 no. steam turbines including 2 no. steam turbine generator enclosure buildings with a gross floor area (GFA) of 219 sq.m each and a height of c. 6.2 m, associated steam turbine generator distribution and control structure with a GFA of 84 sq.m and an overall height of c. 4.2 m, and 2 no. steam turbine / air cooled condenser structures with a height of c. 25.4 m. Construction of 8 no. 33/20kV transformer bays to the southeast of the energy centre, with a further 12 no. gas / steam transformers to serve the proposed turbines to the west of the energy centre. Provision of 3 no. 13.6 m high fuel storage tanks, a fuel oil enclosure building (with a GFA of 50 sq.m and an overall height of c. 3.8m), a fire pump enclosure building (with a GFA of 65 sq.m and an overall height of c. 3.2 m) along with 3 no. c. 14.1 m high sprinkler tanks, a c. 14.5 m high water tank, and a water treatment plant building (with a GFA of 218 sq.m and a maximum height of c. 17 m including rooftop plant). Provision of 6 no. black-start / emergency generators to the south of the energy centre with an overall height of c. 5 m; Provision of a single storey over basement level powertrunk building (with a GFA of 932 sq.m and an overall height of c. 4.1 m) to the southeast of the proposed energy centre. Provision of a 3-storey over basement medium voltage / low voltage building (with a GFA of 3,161 sq.m and an overall height of c. 16.3 m) to the southwest of the proposed energy centre. Provision of 2 no. transformers adjacent to the substation constructed under Reg. Ref.: SD18A/0068, as amended by Reg. Ref.: SD19A/0185 (located to the southwest of the proposed energy centre). Provision of a guard hut with a GFA of 21 sq.m and with a height of c. 3.2m, to the west of the medium voltage / low voltage building. Provision of a Gas AGI (above-ground installation) to the southwest of the subject site within a fenced compound, accommodating a single storey control room building with a GFA of 10 sq.m and overall height of c. 3 m, a plant kiosk with a GFA of 17 sq.m and an overall height of c. 3 m, and a boiler house with a GFA of 13 sq.m and an overall height of c. 3m. Reorientation of permitted ICT Facility Building No. 4 to accommodate the revised energy centre layout (with no other change to this permitted building). Associated and ancillary alterations to the site layout relating to landscaping, parking (including 18 no. car parking spaces, and bicycle parking within a covered bicycle shelter to serve the energy centre) and roads layouts, lighting and services, boundary treatments, drainage, landscaping, and all associated and ancillary works. An Environmental Impact Assessment Report (EIAR) will be submitted to the Planning Authority with the planning application and the EIAR will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy at the offices of the Planning Authority. An EPA-Industrial Emissions Directive (IE) licence will be applied for to facilitate the operation of the proposed development.

3-4, Crag Avenue, Clondalkin Industrial Estate, Clondalkin, Dublin 22South Dublin County CouncilPermission0 reasons0 conditions
Granted05 December 2023
LRD23A/0010

Demolition of all existing 1-3 storey industrial / commercial structures and small café on site totalling c.5,500sqm in area; - Construction of a deck-access apartment development comprising 123 residential units arranged in 2 no. blocks (Block A 5 to 7 storeys and Block B 5 to 6 storeys) with a total floor area of c.9,806sqm including the proposed bike shelter (c.93sqm) and excluding deck access (c.901sqm); -Commercial floor space located at ground floor level facing Cookstown Road in Residential Block A (c.421sq.m); - The residential development consists of 58 no. 1 bed/2 person units, 12 no. 2 bed/3 person units and 53 no. 2 bed/4 person units with north, south, east and west facing balconies throughout and residents amenity area at ground floor level; -Central communal open space (c.1,303sq.m); -Provision of an ESB substation, switchboards, waste areas, water tanks and generator serving Blocks A and B; -Lobbies, stair/lifts, photovoltaic panels and green roofs throughout; -Partial provision of the pocket park identified in the Tallaght LAP (c.1,286sq.m); -New vehicular access from First Avenue and egress onto Cookstown Road via a one way system through the subject site; -All associated site development works, services provision, connection to the water supply, foul and surface water networks on First Avenue and Cookstown Road including partial diversion of the foul line to the north east of the site at First Avenue, temporary foul pump station. attenuation/bioretention systems, vehicular and pedestrian access including internal road and footpaths, pedestrian facilities/public realm upgrade works, landscape and boundary treatment works, tree removal, bicycle storage (302 no. total spaces) comprising 276 no. spaces (serving proposed mixed use development) and 26 no. spaces (serving concurrent transitional care facility application), car parking (32 no. total spaces) comprising 15 no. spaces (serving proposed mixed use development) and 17 no. spaces (serving concurrent transitional care facility application), 2 no loading bays (one each on First Avenue and Cookstown Road), 2 no. setdown/loading areas to the internal road and 1 no. ambulance setdown space serving the adjacent concurrent proposed Transitional Care Facility. The concurrent application has been made to South Dublin County Council regarding a 131 bed Transitional Care Facility on the western portion of the site (SDCC Ref SD22A/0361 refers) currently under appeal to An Bord Pleanála (ABP Ref 317394).

Unit 21, First Avenue, Cookstown Industrial Estate, Dublin 24South Dublin County CouncilPermission0 reasons0 conditions
Refused19 October 2023
SD22A/0463

Change of use of the existing building on site (comprising 763sq.m gross floor area) from office use to light industrial use (comprising the assembly of hampers and online orders at first floor area, digital device repair and refurbishment at second floor level with ancillary staff canteen and reception area at ground floor level); The development also includes the provision of a bicycle store (6 spaces) at ground I undercroft level, along with all ancillary works.

Knockmitten House, Knockmitten Lane, Western Industrial Estate, Dublin 12South Dublin County CouncilPermission0 reasons0 conditions
Granted15 February 2023
SD22A/0099

Construction of 5 warehouse / logistics units (Units 1, 2 3, 4 and 6), Including ancillary office use and entrance / reception areas over two levels, with maximum heights of c. 17.09 metres and a combined total gross floor area (GFA) of 20,158sq.m; Each warehouse / logistics unit includes car parking to the front, and service yards, including HGV loading bays, to the rear of each unit; Signage zones are proposed for each unit; A total of 200 car parking spaces and 110 cycle spaces are provided for the 5 warehous2e / logistics units; Construction of 3 three storey own-door office buildings (Block SA, SB and SC) with maximum heights of c. 13.45 metres and a combined GFA of 4,194sq.m; Signage zones are proposed at the entrances to the buildings; A total of 77 car parking spaces, 50 cycle parking spaces and a bin storage area are provided for the proposed office buildings; Construction of a cafe/restaurant unit with a maximum height of c. 6.09 metres and a GFA of 213sq.m to be located in the south western section of the site; The proposal includes signage for the unit, associated outdoor seating and a bin store; 14 car parking spaces and 10 cycle spaces are provided for the cafe/restaurant unit; The proposal includes 5 ESB substation buildings; The development is to be accessed off Ballymount Avenue and Calmount Road and includes for alterations and upgrades to the public footpaths and road; The development provides for vehicular and service access points, associated internal access roads, circulation areas and footpaths; The proposal includes landscaping and planting, entrance signage, boundary treatments, lighting, PV panels, green roofs, underground foul and storm water drainage network, including connections to the foul and surface water drainage network on the public roads, attenuation areas and all associated site works and development.

Site at Calmount Road and Ballymount Avenue, Ballymount Industrial Estate, Dublin 12South Dublin County CouncilPermission0 reasons0 conditions
Granted15 December 2022
4865/22

Planning permission comprising the following buildings: Colorman Premises: (i) Colorman, Unit 1 Broombridge Industrial Estate, Broombridge Road, Dublin 11, D11 XO64, (ii) unnamed building to south of Unite 1 (no eircode), (iii) Units 13-14 (no eircode); (iv) Unit 17 Broombridge Industrial Estate, Broombridge Road, Dublin 11, D11 RX54, (v) Unit 6 Boyne Road, Dublin Industrial Estate, Dublin 11, D11 XD25, (vi) Unit nos. 72 & 73, D11 XN29 & D11 AY67 Moyle Road, Dublin Industrial Estate, Dublin 11. The development will consist of: (i) the demolition of all existing warehouse/factory/office buildings and all associated ancillary outbuildings and structures located on-site and the removal of the existing vehicular entrance via Broombridge Road; (ii) the construction of a mixed-use development comprising 14 no. retail /commercial units (2,899.66sq.m), a hotel (9,084.24sq.m), a creche (343.5sq.m.), office/remote working/co-working space (44,334.85sq.m.) and 304 no. residential apartments (71 no. one-bedroom, 130 no. two bedroom & 103 no. three bedroom) within 4 no. principle blocks (Blocks A-D) ranging in height from 2-16 storeys over basement level parking/plant area. Block A comprises a 12 storey over basement level (basement 1) building which includes 4 no. retail/commercial units at ground floor level and office space from first to eleventh floor level; Block B comprises a 2-10 storey over basement level (basement 1) building which includes 7 no. retail/commercial units at ground floor level with office space also included from ground to ninth floor level; Block C comprises a 8-11 storey over basement level (basement 2) building which includes 18 no. residential apartments 3 no. retail units and a creche at ground floor level with an additional 286 no. apartment s unit from first to tenth floor levels. Each apartment will benefit from access to private amenity space in the form of a balcony on all elevations and communal amenity space at surface level. Block D comprises a 16 storey over basement level (basement 2) building which includes a hotel (100 no. rooms - inclusive of a double/triple/family rooms) from ground to sixth floor level and thirteenth to fifteenth floor level with restaurant, bar, reception area and ancillary services room at ground floor level and gym, meeting, conference room and staff rooms at first floor level and recreational areas (spa/pool/gamesroom/multi-purpose hall) at thirteenth to fifteenth floor level. Block D will also include office space from seventh to twelfth floor level. The entire basement level (basement 1 & 2), will comprise a total of 296 no. carparking spaces (inclusive of 16 no. accessible spaces), 44 no. motorcycle parking spaces, 848 no. bicycle parking spaces and 30 no. cargo bicycle parking spaces to serve the overall development together with plant, storage, refuse storage and ancillary rooms. Basement 1 is accessed via Broombridge Road and basement 2 is accessed via Boyne/Moyle Road, (iii) provision of a new undercroft vehicular/pedestrian/cycle access from Broombridge Road, new pedestrian and cycle connections onto Broombridge Road through the western site boundary, new pedestrian connection onto the Royal Canal through the southern site boundary, a covered street providing an east-west connection through the site and continued use of the existing vehicular/pedestrian/cycle access from Boyne Road to the east; (iv) bicycle parking (192 no. visitor spaces) will be provided at surface level and a taxi area (for drop-off/pick-up) will be provided to the front of Block D; (v) all associated site and infrastructural works, including foul and surface water drainage; hard and soft landscaping, refuse stores and plant rooms, internal footpaths and roads, lighting, signage ESB substations; public and communal opens space, necessary to facilitate the development. The application is accompanies by two site layout plans, the first of which incorporates the emerging preferred route for the future Luas green line extension along the western boundary of the site, the second shows the proposed development without the future Luas route included.

Lands at Broombridge Industrial Estate and Dublin Industrial Estate bounded by Broombridge Road, Royal Canal and Royal Canal Way, Dublin 11Dublin City CouncilPermission0 reasons0 conditions
Refused10 November 2022
4110/22

Planning permission for development of 4 No. Illuminated external projecting signs and building facade lighting. This external signage and lighting application relates to a previously permitted development (Dublin City Council Reg. Ref. 4743/19) currently under construction on a site of 0.115 hectares located at Newmarket, Brabazon Place, Brabazon Row and St. Luke's Avenue, Dublin 8 (lands comprising part of the site known as the IDA Ireland Small Business Centre at Newmarket Industrial Estate including parts of 10, 12, 13 and 14 Newmarket Industrial Estate and Brabazon Place, 32 Newmarket/ Brabazon Place). The proposed development consists: of the election of (a) 3 No. high level double-sided projecting internally illuminated signs (2.944 sq m each). 1 No. on the Brabazon Row / Brabazon Place (western) elevation and 2 no. on Newmarket) (southern) elevation and (b) 1 No. low level internally illuminated panel sign (2.091 sq. m) on the Brabazon Row / Brabazon Place (western) elevation and the provision of building facade lighting on the Brabazon Row / Brabazon Place (western) and Newmarket (southern) elevations.

Site of 0.115 hectares located at Newmarket, Brabazon Place, Brabazon Row and St. Luke's Avenue, Dublin 8 (lands comprising part of the site known as the IDA Ireland Small Business Centre at Newmarket Industrial Estate and Brabazon Place and including paDublin City CouncilPermission0 reasons0 conditions
Granted25 July 2022
SD21A/0060

Footpath within the western and southern boundaries of the site; erection of a new palisade fencing of 2.4m in height along the southern and western site boundary and a new pedestrian access gate from the north end of the site boundaries at Crag Avenue; single storey, detached vehicle control structure; provision of hard standing at the north west corner of the site; erection of 7 flood light poles and lights along the southern and western boundaries of the site; all associated site development and engineering works.

12, Crag Avenue, Clondalkin Industrial Estate, Dublin 22South Dublin County CouncilRetention0 reasons0 conditions
Refused06 May 2021
SD19A/0401

Demolition of the existing flat roof side extension and rear kitchen extension; Construction of a single storey side and rear extension with flat roof including 3 roof lights and internal alterations including designated car park spaces and cycle spaces; no alterations/works are being proposed to existing bin storage all with associated site demolition and development works, cycle parking, car parking.

Goose Cafe, Knockmitten Lane, Western Industrial Estate, Fox & Geese, Dublin 12South Dublin County CouncilPermission0 reasons0 conditions
Granted21 February 2020
SD19A/0366

Demolition of existing light industrial building (formerly known as Acoustic House) totalling 1,742sq.m; provision of new hardstanding areas and use of the former Acoustic House site as part of the adjacent Frank Keane Motors site to provide for used vehicle display; compound parking; customer parking; service parking; demo parking; construction of a 6 bay car wash and valet facility (244sq.m) located at the western boundary of the site; all associated boundary treatments and all associated site and development works on a site (1.3889ha) at Frank Keane Motors and adjacent premises formerly known as Acoustic House (vacant).

John F Kennedy Drive, John F Kennedy Industrial Estate, Dublin 12South Dublin County CouncilPermission0 reasons0 conditions
Granted27 January 2020