to
to

Planning records

Showing 1-2 of 2 public records
PreviousPage 1 of 1Next
  1. © OpenStreetMap
    221550Granted

    Woodland, Batterstown, Co. Meath

    The development will consist of: 1. Installation of outdoor Air Insulated Switchgear (AIS) electrical apparatus, including an associated extension to the hardstand compound (approximately 4 hectares) to facilitate same. This includes: a. installation of an extension to both sides of the existing 400 kV busbar, with provision of an associated wing coupler at either end of the existing 400 kV busbar. b. additional apparatus and associated works to the two existing busbars to create what is known as sectionalising bays. c. relocation of existing transformer connections from existing busbar to adjacent location on new busbar. d. an associated single-story extension (approximately 80 m2) to the existing control building. 2. The erection of four new lightning masts and relocation of one existing mast (each approximately 45m high). 3. Two bays on opposite sides to the newly extended 400 kV busbars at the southern end of the substation, each bay to incorporate breakers, reactive compensation devices and cable sealing ends. These bays will facilitate the connection of the new 400 kV underground cable links from Dunstown and Belcamp substations respectively. 4. Renewal, alteration and/or removal of associated 400 / 220 kV electrical apparatus and equipment. 5. All ancillary site development works including site preparation works, site clearance and levelling; provision of hardstanding, internal access tracks and temporary construction compound; associated underground cabling and earthgrid; associated extended surface water drainage network including a soakaway; associated palisade fencing and gates (approximately 2.65m high); lighting poles and landscaping as required to facilitate the development. Planning Permission is sought for a period of 10 years. Significant further information/revised plans submitted on this applicationDecision record indexed
    Decision17 April 2023View record
  2. © OpenStreetMap
    22837Granted

    Creemore & Belshamstown, Batterstown, Co. Meath

    The proposed development constitutes a new battery energy storage facility & synchronous condenser, with associated change of use on lands currently in agricultural use. The proposed development will comprise of rechargeable battery units with grid forming inverters contained within 253 no. 40 foot containers on site. (An associated Strategic Infrastructure Development planning application will be made to An Bord Pleanala in relation to a 220 kV Gas Insulated Substation and associated development on the adjoining lands to the east of the proposed development site, located at Creemore & Woodland, in Co. Meath, in accordance with Section 182A of the Planning and Development Act 2000, as amended). In addition, the proposed development includes a synchronous condenser within a c.983 sqm building (ranging in height from c. 11 to 13 m), with associated compound & plant; oil separator & collection pit; transformers; circuit breakers; underground cabling ducts & cable. The proposed development includes underground cable which will connect the new battery energy storage facility to the adjoining proposed 220 kV Gas Insulated Substation (the subject of the associated Strategic Infrastructure Development planning application as reference above). The proposed development will also include a battery storage control building (c. 400 sqm, 6.86 m in height); security gates & boundary treatments; hard & soft landscaping; well; bollards; plant & water storage tank; wastewater treatment system; SuDs; attenuation pond; installation of earthen berms; piped infrastructure & ducting; culverts; street lighting; lighting masts & CCTV columns; car parking; stoned access roads & the upgrading of the existing vehicular access to the R154; changes in level & all associated site development & excavation works above & below ground. Planning Permission is sought for a period of 10 years. Significant further information/revised plans submitted on this applicationDecision record indexed
    Decision25 October 2022View record
Showing 1-2 of 2
PreviousPage 1 of 1Next