20123: To demolish existing single storey dwelling and remove existing septic tank and shed, and construct a replacement single storey dwelling, revisions to existing entrance, new waste treatment system and percolation area, use of on-site mains water and all associated site works
Ballycarney, Co. Carlow
DecisionConditional grant
Decided12 March 2021
Application typePERMISSION
Source documents4
Site
What is on file
0refusal reasons15conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason
No refusal reason is on record for this application yet.
Conditions
- 1Development must be carried out in accordance with plans received 14 April 2020, 20 Oct 2020, and 23 Feb 2021, save as amended by conditions.Compliance
- 2External walls: render finish and natural limestone, neutral colours. Roof: blue/black slate with matching ridge.Design Materials
- 3Splayed entrance/sightlines per drawings. One vehicular entrance only. Existing boundary wall removed, new boundary planted with native hedgerow/beech. Aco-drain at entrance mouth. Surface water contained onsite. Soakaways per BRE Digest 365.Traffic Access
- 4No felling or uprooting of trees without a felling licence under the Forestry Act, 2014.Environment Ecology
- 5Retain/reinforce side hedgerows. Plant native hedgerow/beech at new boundary. Set back/replace adjacent hedge. Landscaping in first planting season. Replace dead/damaged plants within 3 years.Landscaping Boundary
- 6Surface water runoff disposed of onsite. Soakaways per BS8301 and BRE Digest 365. Gutters/RWP located to discharge within site.Wastewater Drainage
- 7Submit Waste Management Plan for agreement (EWC codes, reuse, removal, destinations, soil, hazardous, concrete, contaminated, by-products, segregation, permits). All ESB/telecom services underground. Relocate existing poles at applicant's expense.Construction Management
- 8Consult Chief Fire Officer and strictly comply with fire safety requirements prior to commencement.Compliance
- 9Surface water to new soakaways within curtilage. Only clean water to soakaways per BRE Digest 365/BS8301. Soil polishing filter min 45m2. Min one flush out valve. EPA Code of Practice 2009 compliance. Service contract required. Certificate of Compliance within 3 months of occupation with as-constructed drawings. Septic tank tested per I.S. EN 12566/S.R. 66. No surface water infiltration. Grease trap installed.Wastewater Drainage
- 10Sign Irish Water connection agreement prior to commencement. Obtain approval for build over/divert. Comply with CDS Technical Documentation. Adhere to separation distances. Connections subject to Capital Investment Programme.Water Services
- 11Pay development contribution of €1,599.45 prior to commencement. 5% p.a. interest applies from decision date to payment date (first 90 days discounted).Development Contribution
- 12Noise/vibration limited to BS 5228-1:2009+A1:2014 and BS 5228-2:2009+A1:2014. Dust levels <350 mm/m2/day per VDI 2119.Construction Management
Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
- Notification Of DecisionSource: carlowcoco.eplanning.ie / Bc66a943-35e1-419d-a4ca-f9d5d756dcc6.pdf / Document 112096Source PDF
- Final GrantSource: carlowcoco.eplanning.ie / Cbefa0de-4bf4-4751-82af-bd1991abbf01.pdf / Document 111478Source PDF
- F I Request LetterSource: carlowcoco.eplanning.ie / 6ab9eaa6-8b94-4dcf-973b-d7d27d6b9e4c.pdf / Document 112095Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- 2560137A 10 Year Planning Permission for a solar farm with a total area of circa 57 hectares. The solar farm will consist of solar panels on ground mounted frames, 8 no. single storey electrical inverter/transformer stations, 2 no. single storey spare parts containers, 1 no. Ring Main Unit, 3 no. weather stations, underground electrical ducting and cabling within the development site, private lands and within the L4038, L8185, R448, L3051, L3052 and L3050 public roads to connect solar farm field parcels, security fencing, CCTV, access tracks, 5 no. watercourse/drain deck crossings and 2 no. horizontal directional drill crossings (under M9 motorway and the Dublin - Waterford railway), temporary construction compounds, landscaping and all associated ancillary development and drainage works. Construction and operational access will be via 2 no. existing entrances from the R448 and L1010. Sections of the proposed underground electrical cabling will traverse the solar farms proposed under Carlow County Council References 24/60043 and 24/60205, but will not alter infrastructure proposed under these applications. The operational lifespan of the solar farm will be 40 years and planning permission is requested for this duration. A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application. / 0.5 km away / 31 October 2025Conditional grant
- 2560022To construct a dwelling house, domestic garage, waste water treatment system, percolation area, new bored well, new splayed entrance and associated site work / 0.8 km away / 29 May 2025Conditional grant
- 2660080The change of use of existing domestic garage for use as a granny flat ancillary to the use of the existing dwelling house including elevational alterations to same, full planning permission is sought to construct a single storey extension to the rear of same and to construct an extension linking the existing building to the existing dwelling house, all ancillary site works and services / 1.0 km away / 19 May 2026Conditional grant
- 2460205A 10 Year planning permission for a solar farm with a total area of circa 73 hectares in the townlands of Ballybar Lower, Ballybar Upper, Ballycarney, Ballyloo, Linkardstown, Park and Tinryland in County Carlow. The solar farm will consist of solar panels on ground mounted frames, 11 no. single storey electrical inverter/transformer stations, 3 no. single storey spare parts containers, 2 no. Ring Main Units, 3 no. weather stations, underground electrical ducting and cabling within the development site, private lands and within the L1010, L3051, L3052 and L3050 public roads to connect solar farm field parcels, security fencing, CCTV, access tracks, 3 no. watercourse/drain deck crossings and 2 no. horizontal directional drill crossings (under M9 motorway and L3050), temporary construction compounds, landscaping and all associated ancillary development and drainage works. Construction and operational access will be via 2 no. entrances from the L1022 and L1010. Sections of the proposed underground electrical cabling will traverse the solar farm proposed under Carlow County Council Reference 24/60043, but will not alter infrastructure proposed under that application. The operational lifespan of the solar farm will be 40 years and planning permission is requested for this duration. A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application / 1.1 km away / 24 April 2025Conditional grant
- 21424To construct a single storey, split level dwelling while demolishing an existing single storey dwelling, upgrading existing entrance, detached garage, new waste water treatment system, percolation area, bored well, and all associated site works / 1.1 km away / 26 May 2022Conditional grant
- 2077Retention planning permission for the revisions to dwelling as constructed on foot of planning ref 01/167. Revisions include internal & external alterations and revised entrance location. Retention planning permission is also sought for as constructed detatched domestic garage and all other associated site works. / 1.2 km away / 09 June 2020Conditional grant
- 238Development will consist of a new two storey dwelling extending to c.235msq. The proposal also includes associated site works including a new entrance gateway and lane, a septic tank unit, associated treatment systems, new boundary fencing and hedge and required services connections / 1.2 km away / 02 March 2023Conditional grant
- 2025The extension and alteration of existing dwelling house to comprise the following: an extension to the Eastern (rear) elevation, internal modifications within the existing building, alterations to the roof, Western (front) elevation and all associated site works / 1.3 km away / 12 June 2020Conditional grant