Conditional grantDecided 30 July 2020Carlow County Council

2014: For a 24 hour access, self-storage facility consisting of temporary container units, permanent reception and guest washroom facilities and all associated works

Barrowside Business Park, Sleaty Road, Graiguecullen
DecisionConditional grant
Decided30 July 2020
Application typePERMISSION
Source documents6

Site

What is on file

0refusal reasons16conditions8nearby records

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason

No refusal reason is on record for this application yet.

Conditions

  • 1Retain and complete development per submitted drawings (23 Jan 2020, 8 Jun 2020, 8 Jul 2020), save as amended by conditions.Compliance
  • 2Operational noise limits: Day 55dB, Evening 50dB, Night 45dB. No audible tonal or impulsive noise at night.Other
  • 3Use restricted to 'Storage' only. Any change of use requires separate permission.Occupancy
  • 4External finishes per submitted plans, neutral colours. No advertisement signs/structures without further permission.Design Materials
  • 5a-cSurface water connected to existing network via petrol interceptor, attenuation, hydro brake, non-return valve. Silt/oil interceptor per PPG3. SuDS compliance required.Wastewater Drainage
  • 5dFuels stored in bunded area with volume >= 110% largest tank or 25% total volume.Environment Ecology
  • 5eDust levels at boundary < 350mm/m2/day over 30-day composite sample (VDI 2119).Other
  • 5fParking per Joint Spatial Plan 2012-2018. Container layout must accommodate on-site parking; no parking on access roads.Traffic Access
  • 10All ESB/telecoms underground. No cabling across facades. Relocate existing poles at applicant expense.Other
  • 11Consult Chief Fire Officer and strictly comply with fire safety requirements prior to commencement.Compliance
  • 12Sign Irish Water connection agreement prior to commencement. Comply with CDS Technical Documentation. Subject to Capital Investment Programme constraints.Water Services
  • 13Construction noise/vibration limited to BS 5228-1 & 2 levels.Construction Management

Source documents

Original council portal records and source PDFs where available.

Nearby precedent

Similar nearby applications linked to this planning decision.