GrantedDecided 13 April 2021Carlow County Council

Chapel Street, Ballon, Co. Carlow

Planning application 20251
DecisionConditional grant
Decided13 April 2021
Application typeRETENTION
Source documents4

Site

What is on file

0refusal reasons13conditions8nearby records

Proposed development

Application description published by Carlow County Council.
Retention permission of (a) as-built first floor extension to existing apartment unit. (b) Planning permission is sought for first floor extension to the rear to accommodate a 2-bedroom apartment and all associated site works

Application and appeal history

Structured appeal stages, outcomes and source documents currently tied to this application.

No indexed appeal history

No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason on record

No refusal reason is on record for this application yet.

Conditions

  • 1Development to be retained/carried out in accordance with plans received 24/07/2020 and FI received 18/03/2021.Compliance
  • 2Permission authorises only the described development on site.Compliance
  • 3External finishes to match details on elevation drawing J560-PL02-001.Design Materials
  • 4Noise/vibration limited to BS 5228 standards; dust levels <350 mm/m2/day per VDI 2119.Construction Management
  • 5Clean surface water to soakpit/surface water system; foul/soiled water to public sewer.Wastewater Drainage
  • 6No impairment of existing drainage; surface water collected to soakways/system per BS 8301:1985 and BRE Digest 365; no discharge to public road or adjoining properties.Wastewater Drainage
  • 7Sign Irish Water connection agreement prior to commencement; comply with CDS Technical Documentation; subject to Capital Investment Programme constraints.Water Services
  • 8Off-carriageway parking for construction traffic; no parking on public road; prevent debris on road; maintain neat site; control noise/dust; dispose waste to licensed facility; erect warning sign.Construction Management
  • 9Construction hours restricted to Mon-Fri 08.00-18.00 and Sat 08.00-13.00; no work on Sundays/Bank Holidays.Construction Management
  • 10Relocate service poles prior to construction; all ESB/telecom cables to be located underground.Traffic Access
  • 11Consult Chief Fire Officer and comply with fire safety requirements prior to commencement.Compliance
  • 12Pay development contribution of €365.00 within one month of final grant.Development Contribution

Planning a project near Chapel Street, Ballon, Co. Carlow?

Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.

Source documents

Original council portal records and source PDFs where available.

Nearby precedent

Similar nearby applications linked to this planning decision.
Get up to 80 detailed nearby comparables in a site risk brief →