Conditional grantDecided 13 April 2021Carlow County Council

20251: Retention permission of (a) as-built first floor extension to existing apartment unit. (b) Planning permission is sought for first floor extension to the rear to accommodate a 2-bedroom apartment and all associated site works

Chapel Street, Ballon, Co. Carlow
DecisionConditional grant
Decided13 April 2021
Application typeRETENTION
Source documents4

Site

What is on file

0refusal reasons13conditions8nearby records

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason

No refusal reason is on record for this application yet.

Conditions

  • 1Development to be retained/carried out in accordance with plans received 24/07/2020 and FI received 18/03/2021.Compliance
  • 2Permission authorises only the described development on site.Compliance
  • 3External finishes to match details on elevation drawing J560-PL02-001.Design Materials
  • 4Noise/vibration limited to BS 5228 standards; dust levels <350 mm/m2/day per VDI 2119.Construction Management
  • 5Clean surface water to soakpit/surface water system; foul/soiled water to public sewer.Wastewater Drainage
  • 6No impairment of existing drainage; surface water collected to soakways/system per BS 8301:1985 and BRE Digest 365; no discharge to public road or adjoining properties.Wastewater Drainage
  • 7Sign Irish Water connection agreement prior to commencement; comply with CDS Technical Documentation; subject to Capital Investment Programme constraints.Water Services
  • 8Off-carriageway parking for construction traffic; no parking on public road; prevent debris on road; maintain neat site; control noise/dust; dispose waste to licensed facility; erect warning sign.Construction Management
  • 9Construction hours restricted to Mon-Fri 08.00-18.00 and Sat 08.00-13.00; no work on Sundays/Bank Holidays.Construction Management
  • 10Relocate service poles prior to construction; all ESB/telecom cables to be located underground.Traffic Access
  • 11Consult Chief Fire Officer and comply with fire safety requirements prior to commencement.Compliance
  • 12Pay development contribution of €365.00 within one month of final grant.Development Contribution

Source documents

Original council portal records and source PDFs where available.

Nearby precedent

Similar nearby applications linked to this planning decision.