GrantedDecided 24 November 2022Carlow County Council

Ballon, Co. Carlow

Planning application 22335
DecisionConditional grant
Decided24 November 2022
Application typePERMISSION
Source documents4

Site

What is on file

0refusal reasons13conditions8nearby records

Proposed development

Application description published by Carlow County Council.
The demolition of existing portacabin structure housing a childcare facility and the construction of a new replacement single storey building (on an enlarged footprint). This building is located to the side of protected structure CW 110 (Old National School Ballon). The building shall comprise of playgroup areas with associated wc's changing, sleeping room and all associated works

Application and appeal history

Structured appeal stages, outcomes and source documents currently tied to this application.

No indexed appeal history

No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason on record

No refusal reason is on record for this application yet.

Conditions

  • 1Development must be carried out in accordance with plans received on 04/10/2022.Compliance
  • 2Permission is temporary for a period of 5 years.Occupancy
  • 3Permission is limited to the specific plans and particulars submitted.Compliance
  • 4External finish materials, colours and textures must be agreed with the Planning Authority before commencement.Design Materials
  • 5Disabled access, including for wheelchair users, must be provided in accordance with Building Regulations.Traffic Access
  • 6Warning signage must be erected during construction for road users and the public.Construction Management
  • 7Surface water must be collected and disposed of to soakways or a site system designed per BRE Digest 365; no discharge to public road.Wastewater Drainage
  • 8Clean surface water to soakpits/system; foul waste and soiled water only to public sewer.Wastewater Drainage
  • 9Applicant must sign an Irish Water connection agreement prior to commencement and comply with CDS Technical Documentation.Water Services
  • 10Off-carriageway parking for construction traffic required; no parking on public road; vehicles must be kept clean.Construction Management
  • 11Construction hours restricted to Mon-Fri 08:00-18:00 and Sat 08:00-13:00; no work on Sundays or Bank Holidays.Construction Management
  • 12Applicant responsible for relocating services/utilities; all lines and cables to be underground unless otherwise agreed.Other

Planning a project near Ballon, Co. Carlow?

Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.

Source documents

Original council portal records and source PDFs where available.

Nearby precedent

Similar nearby applications linked to this planning decision.
Get up to 80 detailed nearby comparables in a site risk brief →