GrantedDecided 27 March 2020Carlow County Council

Bunclody Road, Tullow, Co. Carlow

Planning application 2039
DecisionConditional grant
Decided27 March 2020
Application typePERMISSION
Source documents5

Site

What is on file

0refusal reasons17conditions8nearby records

Proposed development

Application description published by Carlow County Council.
The construction of a rear extension to existing premises to include new storage area, ancillary office accommodation, new toilet facilities, kitchen facilities and seating area and incorporating internal alterations to existing shop layout and alterations to front elevation, electric car charging points and ancillary services associated with same

Application and appeal history

Structured appeal stages, outcomes and source documents currently tied to this application.

No indexed appeal history

No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason on record

No refusal reason is on record for this application yet.

Conditions

  • 1Development must follow submitted plans dated 10/02/2020, save as amended by conditions.Compliance
  • 2Max retail floor area 100m². Two sliding door storage containers at rear western elevation must be removed off-site.Design Materials
  • 3Any additional signage within site boundaries requires prior written agreement with the Planning Authority.Design Materials
  • 4Submit a detailed Construction Management Plan for written agreement before starting works, covering phasing, compound, noise, traffic, and waste disposal.Construction Management
  • 5Prevent debris spillage on adjoining roads. Provide adequate on-site parking for all construction, delivery, and service vehicles within the curtilage.Construction Management
  • 6No heavy construction machinery before 08.00 weekdays/09.00 Saturdays or after 18.00 weekdays/13.00 Saturdays, nor on Sundays/Bank Holidays.Construction Management
  • 7Site works restricted to Mon-Fri 08.00-18.00, Sat 08.00-14.00, no activity Sun/Public Holidays. Off-site noise limits: Day 55dB, Night 45dB. No tonal/impulsive noise.Construction Management
  • 8Take precautionary measures to avoid damaging infrastructural services traversed by construction vehicles. Immediately repair any damage to Planning Authority's satisfaction.Construction Management
  • 9Existing land and roadside drainage must not be impaired. Development designed and constructed to ensure efficient, uninterrupted drainage flow.Wastewater Drainage
  • 10Provide 19 car parking spaces within the site, clearly delineated with thermo plastic paint.Traffic Access
  • 11All ESB, telephone, and service cables must be located underground. Relocate existing poles in consultation with authorities prior to commencement at applicant's expense.Design Materials
  • 12Sign Irish Water connection/self-lay agreement before commencement. Comply with CDS Technical Documentation. Connections subject to Irish Water Capital Investment Programme constraints.Water Services

Planning a project near Bunclody Road, Tullow, Co. Carlow?

Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.

Source documents

Original council portal records and source PDFs where available.

Nearby precedent

Similar nearby applications linked to this planning decision.
Get up to 80 detailed nearby comparables in a site risk brief →