GrantedDecided 02 August 2023Carlow County Council

Tullow, Co. Carlow

Planning application 22235
DecisionConditional grant
Decided02 August 2023
Application typePERMISSION
Source documents5

Site

What is on file

0refusal reasons21conditions8nearby records

Proposed development

Application description published by Carlow County Council.
Development at a site to the south-east of the Tesco Superstore, Tullow, Co. Carlow, which extends generally from Mill Street to the Tullow Wastewater Treatment Plant (WwTP), Tullow, Co. Carlow. The development will consist of (1) the decommissioning of: an existing siphon crossing underneath the River Slaney; Abbeywells Pumping Station (Abbeywells PS); a CSO overflow to the River Slaney near to Abbeywells PS; a CSO overflow to River Slaney near Millstreet junction from existing overflow chamber; an existing pumping main from Abbeywells PS to discharge manhole on N81; and an existing septic tank (2) the partial decommissioning of: an existing combined sewer network on the eastern and western sides of the River Slaney (3) the construction of: a new combined sewer network to connect eastern and western agglomerations to the proposed pumping station; a new gravity sewer crossing under the River Slaney to transfer flows from eastern agglomeration; a new Formula A network pumping station to pass flows to Tullow Wastewater Treatment Plant (Tullow WwTP); a new pumping main to transfer flows from the proposed pumping station to Tullow WwTP; a new storm storage chamber to contribute to a total of 450m3 of storage in the proposed pumping station site; a new overflow sewer from proposed pumping station to River Slaney; a new pumping station site to locate wet well, stormchamber, ESB substation, emergency generator and other ancillary equipment; new storm pumps to facilitate storm overflow discharge to River Slaney; new lifting gantries (2 no.) within the proposed pumping station site to facilitate the removal of the two sets of pumps; a site access route and associated gates; 2 no. car parking spaces; hard and soft landscaping and boundary treatment works; and all associated site development works and services on a site of 1.12ha. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development and will be submitted with the planning application.

Application and appeal history

Structured appeal stages, outcomes and source documents currently tied to this application.

No indexed appeal history

No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason on record

No refusal reason is on record for this application yet.

Conditions

  • 1Development to be carried out in accordance with approved drawings and reports received 13 July 2022, as amended by revised particulars 12 June 2023.Compliance
  • 2Construction mitigation and site-specific measures from Section 6 of the Natura Impact Statement (JBA Consulting, 13 July 2022) to be implemented in full to protect River Slaney SAC integrity.Environment Ecology
  • 3Mitigation measures from Section 4 of the Ecological Impact Assessment (JBA Consulting, 13 July 2022) to be implemented in full.Environment Ecology
  • 4Appointment of a suitably qualified Ecological Clerk of Works for the duration of works to advise on constraints and ensure legislative compliance.Environment Ecology
  • 5Measures to prevent spread of Alien Invasive Species during construction per NRA guidelines; non-native species treatment per JBA Consulting management plan (13 July 2022).Environment Ecology
  • 6Construction operations to comply with CIRIA C532; bankside works per NRA Guidelines; instream works per Inland Fisheries Ireland Guidelines.Environment Ecology
  • 7Noise/vibration limited to BS 5228 levels at sensitive receptors; dust < 350 mm/m2/day at site boundary per VDI 2119.Construction Management
  • 8Construction stage traffic management plan to be submitted for written agreement prior to commencement, covering lane restrictions, bus parking, pedestrian access, signage, plant storage, and road cleaning. Public route closures subject to consultation.Traffic Access
  • 9Consultation with stakeholders on construction programme and traffic management per Section 4 of Outline Traffic Management Plan EC1000013 (eps, 12 June 2023).Traffic Access
  • 10Road opening works subject to Road Opening Licence per 'Guidelines for Managing Openings in Public Roads (2007)', submitted for written agreement prior to commencement.Traffic Access
  • 11Development shall not impair existing drainage; no surface water runoff to public road/adjoining properties; clean surface water collected/disposed per details submitted 12 June 2023.Wastewater Drainage
  • 12Flooding response plan and mitigation to follow details in EC1000013 Tullow Networks (eps, 12 June 2023).Wastewater Drainage

Planning a project near Tullow, Co. Carlow?

Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.

Source documents

Original council portal records and source PDFs where available.

Nearby precedent

Similar nearby applications linked to this planning decision.
Get up to 80 detailed nearby comparables in a site risk brief →