Conditional grantDecided 23 April 2021Carlow County Council

20480: The construction of a dwelling house, entrance, connection to public sewer, and all ancillary services and associated site works

Chapelstown Road, Chapelstown, Carlow
DecisionConditional grant
Decided23 April 2021
Application typePERMISSION
Source documents4

Site

What is on file

0refusal reasons14conditions8nearby records

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason

No refusal reason is on record for this application yet.

Conditions

  • 1Development must be carried out in accordance with plans received 22 Dec 2020 and revised plans 30 Mar 2021, save as amended by conditions.Compliance
  • 2Submit details/specimens of selected granite for gabled front elevation. Remaining elevations to be smooth plaster render in neutral colours. Roof to be slate/tiles in neutral colours.Design Materials
  • 3Retain existing trees along rear/southern boundary. Protect trees during construction via fencing. Implement landscaping/tree planting before/during first planting season post-completion. Replace any damaged/died trees/plants within 3 years.Landscaping Boundary
  • 4Retain existing boundary walls along western/southern boundaries, finished with smooth render. Raise eastern boundary wall to 1.9m with smooth render. Front/northern boundary wall to be 1.2m with 1.425m piers, capped and rendered. Metal entrance gates 1.2m high in neutral colour.Landscaping Boundary
  • 5All ESB, telephone, and service cables must be located underground. Applicant to arrange relocation of existing poles at their expense if necessary.Compliance
  • 6Consult Chief Fire Officer and strictly comply with all fire safety requirements prior to commencement.Compliance
  • 7Take precautionary measures to avoid damage to infrastructural services, roads, and footpaths. Immediately make good any damage to Planning Authority's satisfaction.Construction Management
  • 8Construct manhole FMH3 on existing sewer. Lay FMH1 in 150mm sewer. Construct min 100mm sewer from dwelling to FMH3. Intercept and blank off existing sewer exiting property. Clarify pipework responsibility for existing house no. 4 up to rear boundary. Submit full details to Water Services Section and PA for agreement.Wastewater Drainage
  • 9Sign Irish Water connection agreement prior to commencement. Comply with Irish Water standards/codes. Obtain written approval for any build over/diversion of services. Maintain separation distances per Irish Water Codes of Practice.Water Services
  • 10Divert surface water to new onsite soakaways within site boundary. Only clean/uncontaminated water to soakaways. Design/install per BRE Digest 365. Ensure runoff does not discharge onto public road/footpath or adjoining properties.Wastewater Drainage
  • 11Pay development contribution of €7,346.53 prior to commencement. Interest at 5% per annum applies from grant date to payment date, with first 90 days discounted.Development Contribution
  • 12No construction traffic/parking on roads/footpaths. Keep adjoining roads/footpaths/properties clean and orderly. Take all safety precautions for adjoining properties/public areas. No materials stored on roads/footpaths. Dispose of waste at authorised facilities using licensed operators.Construction Management

Source documents