Conditional grantDecided 17 January 2022Carlow County Council

21437: Permission for the erection of a dwelling house, garage, treatment system and percolation area and all associated site works

Carriglead, St. Mullins, Co. Carlow
DecisionConditional grant
Decided17 January 2022
Application typePERMISSION
Source documents3

Site

What is on file

0refusal reasons15conditions8nearby records

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason

No refusal reason is on record for this application yet.

Conditions

  • 1Development to be carried out in accordance with plans received 15 Nov 2021, except where altered by conditions.Compliance
  • 2Dwelling to be first occupied as permanent residence by applicants for 5 years. Section 47 agreement required prior to commencement.Occupancy
  • 3External finishes per Drawing No. 02. Any stone finish must be natural stone only.Design Materials
  • 4Site levelling by excavation into sloping ground to minimise obtrusion on landscape.Design Materials
  • 5Garage to be used solely incidental to dwelling enjoyment; no self-contained unit or commercial activity.Other
  • 6Lines of sight at road entrances per DMRB. Road opening licence required prior to commencement.Traffic Access
  • 7Site entrance wing walls/piers height max 1.2m.Design Materials
  • 8Do not impair existing drainage. Install Aco-Drain. Surface water to soakways per BS 8301:1985 and BRE Digest 365.Wastewater Drainage
  • 9Wastewater system per EPA Code of Practice (June 2021). Certificate of Compliance, ILS EN 12566 testing, vent pipes, max 6 distribution pipes, activated carbon filters, no surface water infiltration, grease trap.Wastewater Drainage
  • 10Sign Irish Water connection agreement prior to commencement. Comply with Irish Water CDS Technical Documentation.Water Services
  • 11Provide off-carriageway parking for construction traffic. Keep site/road clean. Control noise and dust.Construction Management
  • 12Construction hours: Mon-Fri 08:00-18:00, Sat 08:00-13:00. No work Sundays/Bank Holidays.Construction Management

Source documents

Original council portal records and source PDFs where available.

Nearby precedent

Similar nearby applications linked to this planning decision.