GrantedDecided 16 November 2022Carlow County Council

Main Street, Hacketstown, Co. Carlow

Planning application 22250
DecisionConditional grant
Decided16 November 2022
Application typePERMISSION
Source documents3

Site

What is on file

0refusal reasons13conditions8nearby records

Proposed development

Application description published by Carlow County Council.
The change of use of existing commercial unit for use as a restaurant / take-away facility including works to accommodate same, full planning permission is sought for the change of use of part of the ground floor of adjacent dwelling house to accommodate proposed restaurant / take-away facility, all ancillary site work and services.

Application and appeal history

Structured appeal stages, outcomes and source documents currently tied to this application.

No indexed appeal history

No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason on record

No refusal reason is on record for this application yet.

Conditions

  • 1Development to be carried out in accordance with plans received 28/07/2022 as amended by FI response 21/10/2022.Compliance
  • 2Permission authorises only development detailed in submitted plans; does not relate to other development on site.Compliance
  • 3Opening hours restricted to 7.00am - 1.00am.Occupancy
  • 4Sign connection agreement with Irish Water prior to commencement, comply with CDS Technical Documentation, and notify Irish Water of change of use for Section 16 licence.Water Services
  • 5Grease traps to be installed to prevent grease entering wastewater services.Wastewater Drainage
  • 6All waste segregated per commercial food waste regulations; litter bin placed at front and maintained by applicant.Environment Ecology
  • 7No materials stored in public parking spaces; no surface water runoff to public roads/adjoining properties; rear parking for construction operators only.Traffic Access
  • 8No interference with public footpath without Tullow Municipal District Engineer agreement; Road Opening Licence required for road/footpath openings; no materials on public road/footpath during construction.Construction Management
  • 9Fascia signage details agreed in writing prior to commencement; solid block lettering only (no neon, plastic, PVC, Perspex, flashing, reflectorised); no other advertising structures without prior written agreement.Design Materials
  • 10Disabled access provided in compliance with Building Regulations and National Disability Authority guidelines.Compliance
  • 11Construction hours restricted to Mon-Fri 08.00-18.00 and Sat 08.00-13.00; no work on Sundays/Bank Holidays.Construction Management
  • 12Consult Chief Fire Officer and strictly comply with fire safety requirements prior to commencement.Compliance

Planning a project near Main Street, Hacketstown, Co. Carlow?

Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.

Source documents

Original council portal records and source PDFs where available.

Nearby precedent

Similar nearby applications linked to this planning decision.
Get up to 80 detailed nearby comparables in a site risk brief →