Killane, Kellistown, Co. Carlow
Planning application 23181
DecisionConditional grant
Decided14 December 2023
Application typePERMISSION
Source documents4
Site
What is on file
0refusal reasons7conditions8nearby records
Proposed development
Application description published by Carlow County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
No refusal reason is on record for this application yet.
Conditions
- 1Development must be carried out in accordance with plans received 03/11/2023.Compliance
- 2Permission limited to development described in public notices and submitted plans.Compliance
- 3External wall and roof finishes must match existing finishes per drawing 23.102.12.Design Materials
- 4Surface water diverted to soakaways per BRE Digest 365; no discharge to roadway; domestic grease trap installed.Wastewater Drainage
- 5Construction traffic parked off-carriageway; public road kept clean; site litter-free; noise/dust controlled beyond boundary.Construction Management
- 6Construction hours restricted to Mon-Fri 08:00-18:00 and Sat 08:00-13:00; no work on Sundays or Bank Holidays.Construction Management
- 7Consult Chief Fire Officer prior to commencement and strictly comply with fire safety requirements.Compliance
Planning a project near Killane, Kellistown, Co. Carlow?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
- Notification Of DecisionSource: carlowcoco.eplanning.ie / Ca11a02e-363d-45f7-8127-4f1dcdacb4a8.pdf / Document 106935Source PDF
- Final GrantSource: carlowcoco.eplanning.ie / 01076185-08c8-46aa-a221-d60dfe2d1139.pdf / Document 107075Source PDF
- Planners ReportSource: carlowcoco.eplanning.ie / 54f194fd-3270-4fd9-99fd-c048f15447c0.pdf / Document 106936Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- 20394Retention permission is sought for a domestic garage with ground floor storage and a home gym, office and WC on the first floor, constructed to the rear of an existing dwelling, connection to the septic tank, group water scheme and all associated site works / 0.5 km away / 12 January 2021Granted
- 1811The construction of an extension to existing dwelling, garage, entrance gateway and front boundary wall and associated site works. / 0.5 km away / 02 August 2018Granted
- 1942The construction of a single storey dwelling, detached domestic garage, onsite wastewater treatment system, splayed entrance, bored well and all associated site development works / 0.6 km away / 14 May 2019Granted
- 2360171The construction of a Single-Storey Dwelling, Detached Garage, septic tank & percolation area, connection to mains water, splayed entrance and all associated site development works / 0.6 km away / 15 November 2023Granted
- 1743The construction of open cubicles with scraped passages, feed passages, open geomembrane-lined slurry lagoon, silage slab and all associated site works / 0.6 km away / 19 May 2017Granted
- 2360078Permission for erection of an extension to existing clubhouse building, installation of a playground, modifications and expansion of existing car parking facilities including lighting, upgrade to existing sewage facilities to include installation of treatment system and percolation area and all associated site work / 1.2 km away / 08 January 2024Granted
- 2211Permission for development consisting of the construction of a single storey dwelling, on-site wastewater treatment system, connection to water mains, new splayed entrance and all ancillary site works / 1.2 km away / 07 July 2022Granted
- 19104For the construction of a two storey dwelling, detached domestic garage, onsite wastewater treatment system, bored well, splayed entrance onto existing private lane and all associated site development works / 1.2 km away / 01 October 2019Granted