GrantedDecided 22 December 2023Carlow County Council

Rose Cottage, Tobinstown, Tullow Co. Carlow

Planning application 2360169
DecisionConditional grant
Decided22 December 2023
Application typePERMISSION
Source documents6

Site

What is on file

0refusal reasons12conditions8nearby records

Proposed development

Application description published by Carlow County Council.
Permission for development that consists of a part two storey, part single storey, rear extension to an existing two storey dwelling, new wastewater treatment system, demolition of part of an existing agricultural shed and all associated site works. Retention permission is also sought for a single storey side extension.

Application and appeal history

Structured appeal stages, outcomes and source documents currently tied to this application.

No indexed appeal history

No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason on record

No refusal reason is on record for this application yet.

Conditions

  • 1Development to be retained and carried out in accordance with plans received 09/08/2023, as amended by FI received 11/12/2023.Compliance
  • 2Permission authorises development as detailed in plans and does not relate to other development on site.Compliance
  • 3External walls, roof finishes, windows and doors per Drawing No. 2317. FI 100. Sand cement render finish to have neutral colour.Design Materials
  • 4All existing mature trees and hedgerows on and bounding the site retained and maintained as currently in situ.Landscaping Boundary
  • 5No surface water runoff discharged to adjoining public road or properties, and no surface water from adjoining road enters site.Wastewater Drainage
  • 6Only clean surface water discharged to soakpits/surface water system. Only foul waste to on-site wastewater treatment system.Wastewater Drainage
  • 7Soakaways per BRE Digest 365. Percolation pipes/vents per specified requirements. Wastewater system per EPA Code of Practice (PE ≤ 10) issued 7th June 2021. Certificate of Compliance submitted prior to occupation. Septic tank tested per I.S. EN 12566. No surface water infiltrating treatment system. Existing septic tank decommissioned.Wastewater Drainage
  • 8Off-carriageway parking for construction traffic. No parking along public road. Prevent debris on road. Site kept neat. Noise/dust emissions controlled.Construction Management
  • 9Construction hours restricted Mon-Fri 08.00-18.00, Sat 08.00-13.00. No work on Sundays & Bank Holidays.Construction Management
  • 10Existing house and extension jointly occupied as single dwelling unit. Extension not let, sold or conveyed separately.Occupancy
  • 11Consult Chief Fire Officer prior to commencement and comply with recommendations.Compliance
  • 12Development contributions of €168.00 and €1,289.76 paid within specified timeframes.Development Contribution

Planning a project near Rose Cottage, Tobinstown, Tullow Co. Carlow?

Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.

Source documents

Original council portal records and source PDFs where available.

Nearby precedent

Similar nearby applications linked to this planning decision.
Get up to 80 detailed nearby comparables in a site risk brief →