Conditional grantDecided 09 February 2024Carlow County Council

2360296: The erection of an extension to and renovation of a derelict cottage, erection of a domestic garage/store, close up the existing entrance and erect new entrance off the private lane bounding the eastern boundary of the site and the installation of a sewerage treatment plant, polishing filter and wellbore together with all associated site works and also planning permission for the temporary retention of a mobile home and septic tank on the site

Dranagh, St. Mullins, Co. Carlow
DecisionConditional grant
Decided09 February 2024
Application typePERMISSION
Source documents5

Site

What is on file

0refusal reasons13conditions8nearby records

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason

No refusal reason is on record for this application yet.

Conditions

  • 1Development to be carried out in accordance with plans received on 14/12/2023, except where altered by conditions.Compliance
  • 2Permission limited to development detailed in plans received on 14/12/2023.Compliance
  • 3Mobile home retained temporarily until extension completion or max 5 years. Removed within 3 months of occupation. Limited to ancillary storage/residential use only.Occupancy
  • 4External finishes per Drawing No. 5 (14/12/2023). Natural stone matching existing house. Roof: blue bangor or glaslacken slate. No white uPVC. Renovation per Conservation Report (14/12/2023).Design Materials
  • 5Garage/store used solely incidental to dwelling enjoyment. No self-contained dwelling or commercial activity permitted.Occupancy
  • 6Do not impair existing drainage. No surface water to public road or adjoining properties. Soakaways designed per BRE Digest 365. Divert all surface water to new site soakaways.Wastewater Drainage
  • 7Driveway access shall have unbound gravelled surface. Lines of sight at junction per DMRB and Site Layout Plan (Ref No. 3, 14/12/2023). Established prior to construction.Traffic Access
  • 8Wastewater system per EPA Code of Practice (7 June 2021). Certificate of Compliance with as-constructed drawings prior to occupation. I.S. EN 12566 testing. Min 1 flush out valve. No surface water infiltration. Grease trap installed. Existing septic tank removed.Wastewater Drainage
  • 9Sign connection agreement with Irish Water prior to commencement if connecting to public network. Comply with CDS Technical Documentation.Water Services
  • 10Construction hours restricted to Mon-Fri 08:00-18:00 and Sat 08:00-13:00. No work on Sundays/Bank Holidays.Construction Management
  • 11Provide off-carriageway parking for construction traffic. Prevent spread of invasive species. Keep public road clean. Maintain site litter-free. Control noise/dust emissions.Construction Management
  • 12Consult Chief Fire Officer prior to commencement and strictly comply with recommendations.Compliance

Source documents

Original council portal records and source PDFs where available.

Nearby precedent

Similar nearby applications linked to this planning decision.