Lisalican, Borris, Co. Carlow
Planning application 2460157
DecisionConditional grant
Decided26 July 2024
Application typePERMISSION
Source documents5
Site
What is on file
0refusal reasons13conditions8nearby records
Proposed development
Application description published by Carlow County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
No refusal reason is on record for this application yet.
Conditions
- 1Development must be carried out in accordance with plans received on 10/06/2024, except where altered by conditions.Compliance
- 2Existing derelict house to be fully demolished within 30 days of first occupation of the replacement house; waste disposed of by certified contractors at licensed facilities.Other
- 3External finishes (roof, walls, rainwater goods, windows, doors) per Drawing J922-PL01-001. Stone must be natural indigenous stone; render neutral colour.Design Materials
- 4Retain existing mature trees and hedgerows. New native species planting within first available season, replaced if failure occurs.Landscaping Boundary
- 5Sightlines at laneway/public road junction per Drawing J922-PL03-001 and DMRB. Verge kept unobstructed. Road opening licence required. No materials stored on public road.Traffic Access
- 6Do not impair existing drainage. Surface water collected to soakaways per BRE Digest 365. Only clean surface water to soakaways; foul waste to on-site WWT system.Wastewater Drainage
- 7On-site WWT system per EPA Code of Practice (PE ≤ 10, 7 June 2021). Certificate of Compliance with as-constructed drawings before occupation. Septic tank tested per I.S. EN 12566. Vents, max 6 distribution pipes, distribution box, liquid levelling device, activated carbon filters, no surface water infiltration, grease trap.Wastewater Drainage
- 8Sign Uisce Éireann connection/self-lay agreement prior to commencement. Comply with CDS Technical Documentation.Water Services
- 9Provide off-carriageway parking for construction traffic; no parking on public road. Prevent muck/debris on road. Maintain neat site. Control noise/dust.Construction Management
- 10Construction hours restricted to Mon-Fri 08:00-18:00 and Sat 08:00-13:00. No work on Sundays or Bank Holidays without prior written approval.Construction Management
- 11Relocate service poles prior to construction. All ESB, telephone, and service cables located underground at applicant's expense.Other
- 12Consult Chief Fire Officer prior to commencement and strictly comply with any fire safety requirements.Compliance
Planning a project near Lisalican, Borris, Co. Carlow?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
- Notification Of DecisionSource: carlowcoco.eplanning.ie / 5d6b7c38-3cb6-4e7e-b6d7-2cad32ca08de.pdf / Document 117732Source PDF
- Chief Executives OrderSource: carlowcoco.eplanning.ie / C466052f-816f-40c6-adcf-c2e21b2f8ff8.pdf / Document 117731Source PDF
- Final GrantSource: carlowcoco.eplanning.ie / 2d4ff90f-40cc-4be5-8712-ea9e6c439336.pdf / Document 120585Source PDF
- Planners ReportSource: carlowcoco.eplanning.ie / 96d68565-25ff-46d1-b8dd-5240528ff8a2.pdf / Document 119700Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- 2360291To carry out works to our existing single storey dwelling: 1. Demolish a 20th century extension 2. Renovate the remaining 19th century portion of the house 3. Construct a new extension, together with general landscaping and all associated site works / 0.4 km away / 12 February 2024Granted
- 2460083To construct a dwelling house with services, domestic garage and all associated site works / 0.6 km away / 13 December 2024Granted
- 21290Permission for retention of alterations to dwelling, from plans approved under planning register number 04/668 (The alterations include (1) alterations to roof to include gable ends instead of hip roof, (2) Change of sun room to all windows instead of blockwork between windows, (3) The omission of the veranda to the rear of the house and the construction of a balcony, (4) elevation changes to include the change of size and position of same windows and the inclusion of a door at first floor to the balcony and (5) conversion of the attic to two non-habitable room and a W.C. and permission for retention of entrance walls as constructed and all associated site works / 0.7 km away / 08 September 2021Granted
- 2460305The part demolition and renovation of an existing two story cottage ruins to form a two story dwelling with side and rear extension, new domestic garage, domestic well, new waste water treatment system and percolation area including all associate site and landscaping works including a new site entrance / 0.8 km away / 30 January 2025Granted
- 1986The erection of a single storey dwelling house with mezzanine level internal, private well, on site waste water treatment system, domestic garage and all associated site works / 0.8 km away / 29 April 2019Granted
- 1872For the erection of a dwelling house, entrance, domestic garage, installation of sewerage treatment plant, polishing filter and all associated site works / 0.9 km away / 23 November 2018Granted
- 21174Retention permission for the construction of an existing domestic garage and all associated site works / 1.0 km away / 30 June 2021Granted
- 18153To construct a two storey split level dwelling, single storey garage, bored well, waste water treatment system, new domestic entrance and all associated site works. / 1.0 km away / 15 October 2018Granted