2460202: Retention Planning and Planning Permission for the following; - a) Retention of garage raft foundation slab as constructed, b) Retention of mezzanine floor level in dwelling, c) Retention of exterior alterations and alterations to window & door openings in dwelling. d) Planning permission sought to complete construction of a partially completed two storey part single storey dwelling and single storey garage, proposed extension to existing utility room, alterations to interior and exterior, Installation of an appropriate waste water treatment system, bored well, upgrade existing entrance to a domestic entrance, and all ancillary site works and landscaping
Russellstown Woods, Palatine, Co. Carlow
DecisionRefused
Decided04 September 2024
Application typePERMISSION
Source documents4
Site
What is on file
0refusal reasons10conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason
No refusal reason is on record for this application yet.
Conditions
- 1Only clean, uncontaminated surface water from the development shall be diverted to adjacent streams.Wastewater Drainage
- 2WWT system and percolation area must be designed, constructed, operated, and maintained per the EPA Code of Practice (2021).Wastewater Drainage
- 3WWT system and percolation area must fully comply with drawing WTS-001 (July 2024).Wastewater Drainage
- 4Prior to first occupation, a Certificate of Compliance signed by a qualified person must be submitted, including site-specific as-constructed drawings of the percolation trench/pipe and cross-sections of the treatment system.Occupancy
- 5Applicant must submit certification that the septic tank/WWT system has been tested per I.S. EN 12566 and meets national annex performance requirements.Compliance
- 6Surface water must not be allowed to infiltrate the treatment system.Wastewater Drainage
- 7A domestic grease trap must be installed to prevent grease entering the treatment system.Wastewater Drainage
- 8No surface water generated by the development shall be dispersed onto the public roadway.Wastewater Drainage
- 9Access for Fire Brigade vehicles must comply with Chief Fire Officer requirements.Traffic Access
- 10Water supplies for firefighting must comply with Chief Fire Officer requirements.Water Services
Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
- Notification Of DecisionSource: carlowcoco.eplanning.ie / 4d8168fe-5b3c-47a9-995b-4c37fdb34bd9.pdf / Document 120712Source PDF
- Chief Executives OrderSource: carlowcoco.eplanning.ie / 1a4119b2-3c89-4713-bd0a-b0ead072fc8d.pdf / Document 120713Source PDF
- Planners ReportSource: carlowcoco.eplanning.ie / 3e8b6d0a-8cbf-4c75-b998-de38d3bb9bda.pdf / Document 120723Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- 1821Planning permission to construct a dormer style dwelling, new entrance, connection to mains water, waste water treatment system and percolation area and all associated site works. / 0.1 km away / 21 March 2018Refused
- 2560105The construction of a 3 bedroom single storey dwelling, an adjoining domestic carport, a bored well, secondary treatment system & soil polishing filter, a new entrance, connection to services and all associated works / 0.1 km away / 16 June 2025Refused
- 2460421The construction of a new single storey dwelling, an adjoining domestic carport, a bored well, secondary treatment system & soil polishing filter, a new entrance, connection to services and all associated works / 0.1 km away / 19 February 2025Refused
- 2360241The construction of a new single storey dwelling, an adjoining domestic carport, a domestic shed / store, a bored well, secondary treatment system & soil polishing filter, a new entrance, connection to services and all associated works / 0.1 km away / 29 November 2023Refused
- 2360239To construct a two-storey dwelling house, garage, new site entrance, bored well, proprietary treatment system, associated percolation area, all ancillary site works and services / 0.3 km away / 29 November 2023Refused
- 22285The construction of a Dwelling House, Domestic Waste Water Treatment System (DWWTS), entrance, ancillary services and associated site works / 0.9 km away / 25 October 2022Refused
- 2052The construction of a proposed detached dormer dwelling, detached single storey domestic garage, proposed treatment plant/polishing filter, well, site entrance and all associated site works. (A NIS/appropriate screening report has been prepared in respect of the proposed development) / 1.8 km away / 15 April 2020Refused
- 18119Planning permission is sought for the Construction of a proposed detached dormer dwelling, detached single storey domestic garage, proposed treatment plant/polishing filter, well, site entrance and all associated site works. / 1.8 km away / 11 March 2019Refused