Conditional grantDecided 04 September 2024Carlow County Council

2460206: Retention permission for the following, the construction of a two storey extension to the rear elevation of our existing dwelling, the construction of a stove chimney to roof of existing sunroom, the construction of a domestic garage/shed, alterations to previously granted Pl.No.03/509 to include relocation of domestic garage and change of use of same to use as a home office, relocation of previously granted entrance, relocation of previously granted septic tank and percolation area and all associated site works

Paulville, Tullow, Co. Carlow
DecisionConditional grant
Decided04 September 2024
Application typeRETENTION
Source documents5

Site

What is on file

0refusal reasons11conditions8nearby records

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason

No refusal reason is on record for this application yet.

Conditions

  • 1Development to be retained in accordance with plans received 19 July 2024, save as amended by conditions.Compliance
  • 2Dwelling and extension must be jointly occupied as a single unit; no separate sale, let, or transfer.Occupancy
  • 3Home office use restricted to private domestic/incidental purposes; no commercial, trade, industrial, or habitation use.Occupancy
  • 5Permission relates only to development detailed in submitted plans; does not cover other site development.Compliance
  • 6aResubmit site characterisation form within 3 months indicating 6 p.e design with 6x18m percolation area for written agreement.Wastewater Drainage
  • 6bOnly clean/uncontaminated surface water to be diverted to existing network within site curtilage.Wastewater Drainage
  • 6cSoakaways designed and installed per BRE Digest 365.Wastewater Drainage
  • 6dWastewater system designed, constructed, operated and maintained per EPA Code of Practice (PE < 10) issued 7 June 2021.Wastewater Drainage
  • 6eNo surface water from development to be dispersed onto public roadway.Wastewater Drainage
  • 7Consult Chief Fire Officer and strictly comply with all fire safety requirements.Compliance
  • 8Development contribution of €1,286.10 payable within one month of permission date, with 5% p.a. interest from grant date.Development Contribution

Source documents

Original council portal records and source PDFs where available.

Nearby precedent

Similar nearby applications linked to this planning decision.