GrantedDecided 07 May 2026Carlow County Council

Cranemore, Kildavin, Co. Carlow

Planning application 2660069
DecisionConditional grant
Decided07 May 2026
Application typePERMISSION
Source documents5

Site

What is on file

0refusal reasons17conditions8nearby records

Proposed development

Application description published by Carlow County Council.
To construct a slatted cubicle shed, concrete aprons, new agricultural entrance and all associated site works. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development and is submitted with the planning application

Application and appeal history

Structured appeal stages, outcomes and source documents currently tied to this application.

No indexed appeal history

No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason on record

No refusal reason is on record for this application yet.

Conditions

  • 1Development must be carried out in accordance with submitted reports, plans and particulars received 13 March 2026, save as amended by conditions.Compliance
  • 2Permission authorises only the development described in public notices and received plans; does not cover other exempted development on site.Compliance
  • 3Agricultural entrance and sightlines per Site Layout Plan Sheet No. 3 of 4. Full details for wing fencing/gate (materials, heights, finishes) submitted for written agreement before commencement. Sightlines achieved before works start and maintained indefinitely. Six metres of entrance shall be level; detailed drawings submitted within six months. Surface water runoff disposed of onsite; no discharge to public road. Entrance designed/drained to prevent water crossing. Existing roadside drainage protected without interference. Soakaways designed per BS8301 and BRE Digest 365. Road opening works subject to licence and written agreement. Reason: traffic safety, prevent water crossing road, prevent road damage.Traffic Access
  • 4Only clean/uncontaminated roof or yard water diverted to soakaways/pits within site curtilage. New soakaways designed/constructed per BS8301 and BRE Digest 365, accommodating 20% climate change. Reason: public health and environmental sustainability.Wastewater Drainage
  • 5Design and construction must comply with SI 588-2025 (Good Agricultural Practice for Protection of Waters) Regulations 2025. Reason: environmental sustainability and public health.Compliance
  • 6Operation of the facility and farm facilities as a whole shall comply with SI 588/2025. Reason: environmental sustainability and public health.Compliance
  • 7Design and construction of farm buildings shall comply with TAMS specifications published by the Dept of Agriculture, Food and the Marine. Reason: environmental sustainability and proper planning.Compliance
  • 8All soiled water from concrete aprons diverted to two proposed slatted tanks. Tanks must be watertight. Reason: environmental and proper planning.Wastewater Drainage
  • 9External wall finishes: part mass concrete, part galvanised corrugated sheeting (dark grey or green). Roof: galvanised corrugated sheeting (dark grey or green). Reason: visual amenity.Design Materials
  • 10Existing trees/hedgerows along side/rear boundaries retained in full. Front boundary landscape hedge planting per Sheet No. 3 of 4 using Crataegus Monogyna (Hawthorn). Planted continuously (double row) and indefinitely maintained. Planting in first season post-completion. Replacement within 3 years if damaged/dies. Timber post and rail fencing at front boundary sections. Reason: assimilate development, visual amenity, traffic safety.Landscaping Boundary
  • 11All ESB, telecommunications and public services located underground throughout site. Cabling not laid across building facades. Relocation of existing poles arranged with authorities at applicant's expense prior to commencement. Reason: visual amenity.Water Services
  • 12Consult Chief Fire Officer before commencement and strictly comply with any fire safety requirements. Reason: public health and safety.Compliance

Planning a project near Cranemore, Kildavin, Co. Carlow?

Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.

Source documents

Original council portal records and source PDFs where available.

Nearby precedent

Similar nearby applications linked to this planning decision.
Get up to 80 detailed nearby comparables in a site risk brief →