IDA Business and Technology Park, Killygarry, Cavan
Planning application 19358
DecisionConditional grant
Decided11 November 2019
Application typePERMISSION
Source documents4
Site
What is on file
0refusal reasons4conditions8nearby records
Proposed development
Application description published by Cavan County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
No refusal reason is on record for this application yet.
Conditions
- 1Development must follow plans lodged 18 Sept 2019. Any details requiring agreement must be agreed in writing with the Planning Authority before commencement.Compliance
- 2Developer must prevent pavement or structural damage to the adjoining public road network from heavy plant during construction. Damage repaired by Council at developer's cost.Construction Management
- 3No surface water from internal roads/paved areas shall flow onto the public road. Must be collected by a drainage system and discharged directly to nearby watercourses.Wastewater Drainage
- 4Prior to commencement, submit specific details for written agreement on junction design, public lighting, road markings, traffic calming measures, and landscaping.Traffic Access
Planning a project near IDA Business and Technology Park, Killygarry, Cavan?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Inside the decision file
Extracts from the council's own decision documents for this application — 8 pages of searchable text on file.Chief Executives Order1 page indexed
© CAVAN COUNTY COUNCIL PLANNING AND DEVELOPMENT ACTS 2000 to 2018 Chief Executive's Order No: PL 99.449 Reference Number: 19/358 Name of Applicant: IDA Ireland Address: C/o ORS Block A, Marlinstown Office Park Mullingar Co. Westmeath N91 WS5NN Nature of Application: PERMISSION for development consisting of c.230...
Final Grant2 pages indexed
PLANNING AND DEVELOPMENT ACT 2000 - 2018 NOTIFICATION OF FINAL GRANT COUNCIL OF THE COUNTY OF CAVAN TO: IDA TIreland C/o ORS Block A. Marlinstown Office Park Mullingar Co. Westmeath N91 W5NN Planning Register Number: 19/358 Application Receipt Date: 18/09/2019 Further Information Received Date: In pursuance of the...
Planners Report5 pages indexed
MEMORANDUM From Eve Harrison To Nicholas O’Kane Senior Planner Executive Planner Planning Section Lol wg Ff Date: 8" November 2019 Planning Reg. No: 19/358 Applicant: IDA Ireland Type of Application: Permission Development Description: for development consisting of c.230 metres of a single carriageway park roadway,...
Read the full decision filePro members can search and read every indexed page of this file with the AI research assistant — planner's reasoning, conditions, and precedent across 3 documents.
Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
- Chief Executives OrderSource: cavancoco.eplanning.ie / 72ba0246-00cf-429e-ae84-40c743f2f09b.PDF / Document 332519Source PDF
- Final GrantSource: cavancoco.eplanning.ie / B49a9f6b-a278-426d-9024-ae2348f476d8.PDF / Document 333707Source PDF
- Planners ReportSource: cavancoco.eplanning.ie / 5c866983-2f4d-42da-9613-391d522363e6.PDF / Document 332516Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- 18477To erect two fully serviced factory units, each incorporating 2 storey administration & staff facility areas, single storey manufacturing/ assembly/ storage areas, additional entrances & completion of service road to provide site access, parking, signage, landscaping, boundary treatments, bicycle shelter, connection to public sewer, surface water, watermain and utility services and all ancillary and ancillary works / 0.1 km away / 13 February 2019Granted
- 21407To retain alterations to previously approved unit under Planning Ref. No. 18/477. Alterations include 1) Revised Site 6 site plan incorporating revised site boundaries, site entrance, location of Unit 1 and parking layout, 2) Additional single-storey extension to Unit 1, 3) Alterations to plans and elevations.,4) Additional detached storage unit, 5) 2 no. signage added to Unit 1 elevations, 6) All associated ancillary works / 0.1 km away / 24 August 2021Granted
- 22384For RETENTION of a) alterations to site layout, entrance and site boundaries, b) external plant and gas tanks, c) 2 no. temporary storage vessels and d) all associated and ancillary works at site 7, IDA Cavan Business Park, Killygarry, Cavan. PERMISSION is also sought to erect 1 no. permanent storage vessels to replace existing temporary storage vessels and for the relocation of the previously approved bicycle shelter within the site / 0.1 km away / 27 October 2022Granted
- 20584For the construction of an ESB substation building and all ancillary site development works / 0.1 km away / 30 January 2021Granted
- 20318For alterations to previously approved unit under planning reference 18/477 to include - a) reduction in building height, b) additional floor area, c) associated alterations to floor plans and elevations, d) alterations to site layout & boundaries, e) alteration to site entrance and f) all associated and ancillary works / 0.1 km away / 17 September 2020Granted
- 2660024For Permission for development of a 38kV/MV Gas Insulated Switchgear (GIS) Electrical Substation at this site (c. 1.929 Ha) located at Cavan Business & Technology Park, Dublin Road, Killygarry, Cavan, Co. Cavan. The site is generally bound to the north by a private site access road; to the east by the Cavan Business & Technology Park private access road; to the south by unoccupied greenfield land; and to the west by an existing industrial property. The proposed development will consist of the provision of a new 38 kV / MV Gas Insulated Switchgear (GIS) Electrical Substation and will include the following elements: 1. Removal of existing MV timber poleset and associated overhead line 2. Construction of: i. A new substation compound (c. 1,999 sq.m) with a 2.6 m high palisade fence ii. 1 No. prefabricated 38 kV GIS module and foundation (c.31 m2 and c.5.139 m high); iii. 1 No. prefabricated MV GIS module and foundation (c.34 m2 and c.4.64 m high); iv. 1 No. prefabricated Control Room module and foundation (c.34 m2 and c.4.64 m high); v. 2 No. 38/20 kV 18.75 MVA transformers and associated bunds (c.4.67 m high ea.); vi. Telecommunication SCADA pole of c. 12 m in height; vii. Associated and ancillary outdoor electrical equipment and other apparatus, including installation of underground cables; viii. All associated site development works including provision of access roads, lighting, boundary fences, landscaping, site services including drainage and all ancillary site development works / 0.1 km away / 19 March 2026Granted
- 2360005For variations to a previously approved Advanced Building Solution consisting of office and light industrial/production space. Permission is sought for revisions to the previously approved main building including a minor increase in permitted floor area, the vehicular/pedestrian entrance, timber post-and-rail boundaries, car parking, landscaping, and access road and all associated site works. This includes new permission for signage, cycle shelters, underground fire-fighting water storage tank, and an independent ESB substation & switch room building, and all associated site works. This application is a variation to previously approved site and building granted under application ref. no. 21117 / 0.2 km away / 14 June 2023Granted
- 21534For development consisting of Construction of a fully serviced industrial unit, works include construction of a new site entrance from service road, connection to existing public services and associated site development works. Significant further information and revised plans have been submitted. / 0.2 km away / 31 March 2022Granted