20318: For alterations to previously approved unit under planning reference 18/477 to include - a) reduction in building height, b) additional floor area, c) associated alterations to floor plans and elevations, d) alterations to site layout & boundaries, e) alteration to site entrance and f) all associated and ancillary works
7 IDA Cavan Business Park, Killygarry, Co Cavan
DecisionConditional grant
Decided17 September 2020
Application typePERMISSION
Source documents4
Site
What is on file
0refusal reasons11conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Cavan is in progress.
Conditions
- 1Development must follow plans lodged 29 July 2020, except as modified by conditions. Any details requiring agreement must be agreed in writing with the Planning Authority before starting work.Compliance
- 2Developer must pay €10,000 to the Planning Authority for public infrastructure/facilities under the Development Contribution Scheme.Development Contribution
- 3Developer must prevent pavement or structural damage to the adjoining public road network from heavy plant during construction. Any damage repaired by Council at developer's cost.Construction Management
- 4No surface water from roofs or paved areas may flow onto the adjoining road. Must be collected by a surface water drainage system and discharged directly to nearby watercourses.Wastewater Drainage
- 5Car and HCV parking must be marked with thermoplastic road marking materials. Roadways and junctions require signage and road-markings per the 'Traffic Signs Manual'.Traffic Access
- 6Car park, internal service road, and entrance areas must be structurally designed for ground conditions and proposed use levels, surfaced with appropriate depths of bituminous bound materials.Traffic Access
- 7Car parking spaces must be a minimum width of 2.7m.Traffic Access
- 8Public lighting of the main service road must be extended to include the proposed service road extension at full cost to the developer.Traffic Access
- 9Noise at site boundaries must not exceed 55dB(A) (15 min Leq) 07:00-18:00 Mon-Fri and 45dB(A) at any other time. Measurements per ISO R.1996/1.Environment Ecology
- 10Submit a construction and demolition waste management plan to be agreed in writing with the Planning Authority before commencement.Construction Management
- 11Submit specific details for all external finishes, boundary treatment, signage, and landscaping to be agreed with the Planning Authority before commencement.Design Materials
Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
- Chief Executives OrderSource: cavancoco.eplanning.ie / 6e9866ca-11e5-4cd0-af12-7aef11f1314f.PDF / Document 343394Source PDF
- Final GrantSource: cavancoco.eplanning.ie / 15aa2e39-a2b6-4335-b59e-ba08bd462709.PDF / Document 344769Source PDF
- Planners ReportSource: cavancoco.eplanning.ie / C768a432-4016-48eb-8c50-25b1baaae207.PDF / Document 343389Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- 22384For RETENTION of a) alterations to site layout, entrance and site boundaries, b) external plant and gas tanks, c) 2 no. temporary storage vessels and d) all associated and ancillary works at site 7, IDA Cavan Business Park, Killygarry, Cavan. PERMISSION is also sought to erect 1 no. permanent storage vessels to replace existing temporary storage vessels and for the relocation of the previously approved bicycle shelter within the site / 0.0 km away / 27 October 2022Granted
- 20584For the construction of an ESB substation building and all ancillary site development works / 0.0 km away / 30 January 2021Granted
- 21407To retain alterations to previously approved unit under Planning Ref. No. 18/477. Alterations include 1) Revised Site 6 site plan incorporating revised site boundaries, site entrance, location of Unit 1 and parking layout, 2) Additional single-storey extension to Unit 1, 3) Alterations to plans and elevations.,4) Additional detached storage unit, 5) 2 no. signage added to Unit 1 elevations, 6) All associated ancillary works / 0.0 km away / 24 August 2021Granted
- 18477To erect two fully serviced factory units, each incorporating 2 storey administration & staff facility areas, single storey manufacturing/ assembly/ storage areas, additional entrances & completion of service road to provide site access, parking, signage, landscaping, boundary treatments, bicycle shelter, connection to public sewer, surface water, watermain and utility services and all ancillary and ancillary works / 0.0 km away / 13 February 2019Granted
- 19358For development consisting of c.230 metres of a single carriageway park roadway, footpath, public lighting and all associated site works / 0.1 km away / 11 November 2019Granted
- 2660024For Permission for development of a 38kV/MV Gas Insulated Switchgear (GIS) Electrical Substation at this site (c. 1.929 Ha) located at Cavan Business & Technology Park, Dublin Road, Killygarry, Cavan, Co. Cavan. The site is generally bound to the north by a private site access road; to the east by the Cavan Business & Technology Park private access road; to the south by unoccupied greenfield land; and to the west by an existing industrial property. The proposed development will consist of the provision of a new 38 kV / MV Gas Insulated Switchgear (GIS) Electrical Substation and will include the following elements: 1. Removal of existing MV timber poleset and associated overhead line 2. Construction of: i. A new substation compound (c. 1,999 sq.m) with a 2.6 m high palisade fence ii. 1 No. prefabricated 38 kV GIS module and foundation (c.31 m2 and c.5.139 m high); iii. 1 No. prefabricated MV GIS module and foundation (c.34 m2 and c.4.64 m high); iv. 1 No. prefabricated Control Room module and foundation (c.34 m2 and c.4.64 m high); v. 2 No. 38/20 kV 18.75 MVA transformers and associated bunds (c.4.67 m high ea.); vi. Telecommunication SCADA pole of c. 12 m in height; vii. Associated and ancillary outdoor electrical equipment and other apparatus, including installation of underground cables; viii. All associated site development works including provision of access roads, lighting, boundary fences, landscaping, site services including drainage and all ancillary site development works / 0.1 km away / 19 March 2026Granted
- 21534For development consisting of Construction of a fully serviced industrial unit, works include construction of a new site entrance from service road, connection to existing public services and associated site development works. Significant further information and revised plans have been submitted. / 0.1 km away / 31 March 2022Granted
- 2360005For variations to a previously approved Advanced Building Solution consisting of office and light industrial/production space. Permission is sought for revisions to the previously approved main building including a minor increase in permitted floor area, the vehicular/pedestrian entrance, timber post-and-rail boundaries, car parking, landscaping, and access road and all associated site works. This includes new permission for signage, cycle shelters, underground fire-fighting water storage tank, and an independent ESB substation & switch room building, and all associated site works. This application is a variation to previously approved site and building granted under application ref. no. 21117 / 0.1 km away / 14 June 2023Granted