2560006: For retention of alterations to site levels to form existing ground levels and permission is also sought for: • The erection of a fully serviced single storey factory unit to be used as a manufacturing facility incorporating 2 storey administration & staff facility areas to include meeting rooms, office space and a canteen. • New vehicular entrances off the existing service roads. • Site works to consist of car parking, landscaping, lighting, the provision of a bicycle shelter and boundary treatments to the site. • Connection to the public sewer, surface water network, watermain and utility services • Detached ESB substation building. • Alterations to existing service road. • All ancillary and associated site works.
Site 8, Cavan Business and Technology Park, Dublin Road Killygarry Co. Cavan
DecisionConditional grant
Decided28 March 2025
Application typePERMISSION
Source documents8
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Cavan is in progress.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
- Notification Of DecisionSource: cavancoco.eplanning.ie / 577c0916-103b-49bc-8e5f-eb6d82cedb8a.pdf / Document 437137Source PDF
- Chief Executives OrderSource: cavancoco.eplanning.ie / 25399071-c04d-4eec-bf6c-957f41d8326a.pdf / Document 435451Source PDF
- Chief Executives OrderSource: cavancoco.eplanning.ie / 3e7d94de-221d-46b9-a41e-ad1ced1af43f.pdf / Document 437135Source PDF
- Final GrantSource: cavancoco.eplanning.ie / Deaf487d-8215-42b9-bbed-57e16a4fb650.pdf / Document 440647Source PDF
- Planners ReportSource: cavancoco.eplanning.ie / D712a381-b91c-4f2b-bb34-30512403f1b9.pdf / Document 435453Source PDF
- Planners ReportSource: cavancoco.eplanning.ie / 5e35a5aa-3aa5-4158-b2ec-980cabe032a3.pdf / Document 437136Source PDF
- F I Request LetterSource: cavancoco.eplanning.ie / 8e847f61-f9f3-4dde-adfb-7b7e81adfd62.pdf / Document 435452Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- 21157For (1) construction of a fully serviced industrial unit to incorporate a single storey production and manufacturing area together with a two storey ancillary administration and staff facilities area, (2) provision of car parking, bicycle parking, external yard area, landscaping, boundary treatments and access via existing site entrance, (3) erection of signage to proposed building façade, (4) connection to public foul water, surface water and water main, (5) completion of all ancillary site works and associated structures / 0.1 km away / 06 May 2021Granted
- 23140To consist of an extension of existing service road in order to provide new entrance to existing commercial unit site, lighting, footpaths, connection to all existing services, removal of existing entrance, alterations to site boundaries and all ancillary works / 0.1 km away / 19 May 2023Granted
- 18536To provide new access roadway through site no.13 Kilmore Business Park to existing commercial unit, alterations to site boundaries & all ancillary site works / 0.1 km away / 01 February 2019Granted
- 21534For development consisting of Construction of a fully serviced industrial unit, works include construction of a new site entrance from service road, connection to existing public services and associated site development works. Significant further information and revised plans have been submitted. / 0.2 km away / 31 March 2022Granted
- 2660024For Permission for development of a 38kV/MV Gas Insulated Switchgear (GIS) Electrical Substation at this site (c. 1.929 Ha) located at Cavan Business & Technology Park, Dublin Road, Killygarry, Cavan, Co. Cavan. The site is generally bound to the north by a private site access road; to the east by the Cavan Business & Technology Park private access road; to the south by unoccupied greenfield land; and to the west by an existing industrial property. The proposed development will consist of the provision of a new 38 kV / MV Gas Insulated Switchgear (GIS) Electrical Substation and will include the following elements: 1. Removal of existing MV timber poleset and associated overhead line 2. Construction of: i. A new substation compound (c. 1,999 sq.m) with a 2.6 m high palisade fence ii. 1 No. prefabricated 38 kV GIS module and foundation (c.31 m2 and c.5.139 m high); iii. 1 No. prefabricated MV GIS module and foundation (c.34 m2 and c.4.64 m high); iv. 1 No. prefabricated Control Room module and foundation (c.34 m2 and c.4.64 m high); v. 2 No. 38/20 kV 18.75 MVA transformers and associated bunds (c.4.67 m high ea.); vi. Telecommunication SCADA pole of c. 12 m in height; vii. Associated and ancillary outdoor electrical equipment and other apparatus, including installation of underground cables; viii. All associated site development works including provision of access roads, lighting, boundary fences, landscaping, site services including drainage and all ancillary site development works / 0.2 km away / 19 March 2026Granted
- 22384For RETENTION of a) alterations to site layout, entrance and site boundaries, b) external plant and gas tanks, c) 2 no. temporary storage vessels and d) all associated and ancillary works at site 7, IDA Cavan Business Park, Killygarry, Cavan. PERMISSION is also sought to erect 1 no. permanent storage vessels to replace existing temporary storage vessels and for the relocation of the previously approved bicycle shelter within the site / 0.2 km away / 27 October 2022Granted
- 20584For the construction of an ESB substation building and all ancillary site development works / 0.2 km away / 30 January 2021Granted
- 20318For alterations to previously approved unit under planning reference 18/477 to include - a) reduction in building height, b) additional floor area, c) associated alterations to floor plans and elevations, d) alterations to site layout & boundaries, e) alteration to site entrance and f) all associated and ancillary works / 0.2 km away / 17 September 2020Granted