19226: For the further completion of construction of Westpark Business Campus with the construction of Block 6000 ( immediately south of existing Block 7000), for a building of five storeys ( with an additional area for mechanical plant on the roof area ) on the western portion of the proposed building facing into the centre of the Campus with a further two basement storeys linking into a proposed, ancillary, multi-deck car park ( MDCP) to the east of the site. Block 6000 will have a total gross floor area of 10,800 sqms for office use. The office building includes ancillary services including, secure internal, cycle parking with staff toilets and shower facilities. The ESB sub station and mechanical plant areas are contained within the office building. The proposed development will use existing drainage services in place within the overall Campus and the existing road network. The development includes all other ancillary site development works as required to complete the block
Westpark Business Campus, Shannon, Co. Clare
DecisionConditional grant
Decided21 May 2019
Application typePERMISSION
Source documents6
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason
No refusal reason is on record for this application yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
- Chief Executives OrderSource: clarecoco.eplanning.ie / 6cb99e6e-a99d-43f5-9dd6-dc09316605e7.PDF / Document 448018Source PDF
- Final Grant / file 1 of 2Source: clarecoco.eplanning.ie / Cb38c125-aea5-4f22-bbaf-22b347522d69.PDF / Document 451707Source PDF
- Final Grant / file 2 of 2Source: clarecoco.eplanning.ie / 714d3a2c-4d64-4030-8ac0-9909725ed09a.PDF / Document 451707Source PDF
- Planners ReportSource: clarecoco.eplanning.ie / 7d28b990-cfe2-473c-880e-9c61bb46a4ec.PDF / Document 448020Source PDF
- Planners ReportSource: clarecoco.eplanning.ie / 78ae94ca-ecb0-4ccc-97f3-fe2419ccef46.PDF / Document 448022Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- 17583For the further completion of construction of Westpark Business Campus with the construction of Block 6000, ( immediately south of existing Block 7000), a mixed use, multi-storey block, similar to that granted under parent planning permission under Clare County Council PA Ref: P01-1066 and APB Ref: PL03.130244. Block 6000 will have a total gross internal area of 12,045 sqms with offices at upper floors 300-500 and data centre/light industrial / storage/ Research and Development uses at lower levels 100-200. The construction of an ancillary, multi-deck carpark (MDCP) located to the South of Block 4000 within the Campus. The MDCP will accommodate 580 spaces and will replace the existing, 101 at grade, split level, car park located to the South of Block 4000. The car park will also replace the 500 space MDCP located to the South of the Campus, granted by Clare County Council under Ref: P01-1066 and APB Ref PL.03-130244. The proposed development will use existing drainage services in place within the overall campus and the existing road network. The development includes, landscaping, ancillary parking adjacent to Block 6000, ESB Substation, service areas for goods vehicles. The application includes all other ancillary site development works as required to complete the block. / 0.1 km away / 20 September 2017Conditional grant
- 19621To Retain and Maintain and, Continue to use established, temporary ancillary car parking areas associated with the development and operation of the Westpark Business Campus. / 0.1 km away / 23 September 2019Conditional grant
- 2560673For the following development on the site, consisting of; construction of a new 47 m2 bunded modular extension including an underground bund, A new external covered solvent storage area and bund, New concrete yard, New access landing, ramp, steps & railings, Removal of an existing LPG tank, and All ancillary site development works and services to facilitate the development including drainage, and utility connections. The proposed development site is controlled by an Industrial Emissions Licence (No. IEL P0020-03) authorised by the Environmental Protection Agency / 0.2 km away / 22 December 2025Conditional grant
- 21623For 4 No face illuminated wall signs to replace existing 1 No non-illuminated freestanding sign to replace existing and 1 No new non-illuminated freestanding sign / 0.3 km away / 05 August 2021Conditional grant
- 17499To remove a temporary structure and to construct an extension to its existing facility in order to create additional storage and office space / 0.3 km away / 09 August 2017Conditional grant
- 19441For the following development which will consist of (1) full planning permission for a change of use of the previously granted extension ( ref P17-499 ) from storage to industrial, (2) full planning permission for new boundary fencing and gates, (3) RETENTION of planning permission of an additional factory extension ( 409m2) to the previously granted extension ( ref P17-499), (4) RETENTION of planning permission of a new ( 1252m2) external yard area, (5) RETENTION of planning permission of the demolition of existing external sheds, (6) RETENTION of planning permission of fenestration changes from the previously granted extension ( ref P17-499), and all associated civil, site development, site services and landscaping works / 0.3 km away / 07 November 2019Conditional grant
- 2660039For development at Precision Engineering Ltd., Block O109, Shannon Industrial Estate, Shannon, Co. Clare. The development will consist of proposed roof-mounted photovoltaic, PV, panels on the existing profiled metal roof and all associated siteworks / 0.3 km away / 24 March 2026Conditional grant
- 18654For development which will consist of a rear extension to the existing warehouse storage area including all ancillary site works / 0.4 km away / 05 October 2018Conditional grant