20575: To: construct of 1 no Advanced Technology Manufacturing Unit. The building consists of a single storey high-bay industrial floor with ancillary office area and roof plant. Site works consists of the provision of an enclosed service yard with dedicated plant and refuse storage compound, rainwater harvesting tank and new sub-station, cycle parking and external landscaping, along with all associated site works, services and signage. Demolition of existing sub-station. The Building will replace the existing structures on site, the demolition which was granted under planning reference no P19-822.
Bay 77-79 Block R, Shannon Industrial Estate, Shannon Free Zone
DecisionConditional grant
Decided05 May 2021
Application typePERMISSION
Source documents13
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Clare has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
- Chief Executives OrderSource: clarecoco.eplanning.ie / 097ef134-bbe4-4e97-853b-b84ac4e4777e.PDF / Document 512502Source PDF
- Chief Executives OrderSource: clarecoco.eplanning.ie / Dbe94c5d-db24-4384-ba67-bdb54f7f78c6.PDF / Document 525683Source PDF
- Chief Executives OrderSource: clarecoco.eplanning.ie / 6194e61b-8810-4f99-b9fe-1103f2252751.PDF / Document 543539Source PDF
- Final Grant / file 1 of 2Source: clarecoco.eplanning.ie / Cabaef5c-e757-405e-8a99-e0c610d574e1.PDF / Document 550165Source PDF
- Final Grant / file 2 of 2Source: clarecoco.eplanning.ie / 83616fb9-e727-4107-b843-bc590fa5bdfd.PDF / Document 550165Source PDF
- Planners Report / file 1 of 2Source: clarecoco.eplanning.ie / 3676d66d-5aaa-4938-839b-9499b016cf14.PDF / Document 512506Source PDF
- Planners Report / file 2 of 2Source: clarecoco.eplanning.ie / Ee97c37c-f225-4493-a584-a895657c6d89.PDF / Document 512506Source PDF
- Planners ReportSource: clarecoco.eplanning.ie / 3cc968ac-805f-4838-811c-85751345cb55.PDF / Document 512507Source PDF
- Planners ReportSource: clarecoco.eplanning.ie / 9e0de004-a0ca-44de-806a-6e09d47a1483.PDF / Document 525685Source PDF
- Planners ReportSource: clarecoco.eplanning.ie / 0df30649-46c6-4c5c-bfbf-4a756313420f.PDF / Document 543541Source PDF
- Planners ReportSource: clarecoco.eplanning.ie / B9936622-b790-41f2-b018-4eef95311dd9.PDF / Document 543542Source PDF
- F I Request LetterSource: clarecoco.eplanning.ie / 9ffe315c-bb22-4348-9e22-2d0c3b565473.PDF / Document 512501Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- 23224For development which will consist of alterations and amendments to the elevations, external finishes and site works previously permitted under Planning Reference No P20/575 / 0.0 km away / 26 May 2023Conditional grant
- 19822For the Demolition of existing industrial/office buildings within Bays 77 and 79 of the Shannon Industrial Estate and associated site clearance works along with all other associated site works to allow for future development on the site at Caherteige and Drumgeely Td / 0.0 km away / 23 March 2020Conditional grant
- 20786The development consists of the demolition of an existing carparking area and the relocation of an existing ESB substation to facilitate the construction of a four-storey office building with a gross floor area of 5636m2. Other works include the provision of 317no. carparking spaces including accessible spaces, EV charging areas and set-down areas, a relocated vehicular access to the site, an additional vehicular access point to ancillary parking on the opposite side of the road with a pedestrian crossing connecting both. Secure bicycle parking spaces, refuse store and plant and services building, incorporating the relocated substation. Signage and wayfinding, services plant and photovoltaic units to roof level with all landscaping and associated site works & services The planning application is accompanied by a Natura Impact Statement / 0.1 km away / 09 December 2020Conditional grant
- 20901For construction of an external refuse store at Bay 89.1, Shannon Free Zone West, Shannon, Co. Clare. The proposed works will include construction of a louvred refuse enclosure to the south of the existing building together with all ancillary site works and servies / 0.1 km away / 20 January 2021Conditional grant
- 19232For the change of use of the existing Bay 89.1, located at the Shannon Free Zone West, Co. Clare, from its previously permitted office use, to a local service restaurant and retail use, works to include reconfiguration of the existing elevations to provide increased glazing, an external canopy, signage both on the building, and free-standing, roof level plant enclosure, provision of outdoor paved seating area, bicycle parking and reconfigured car parking as well as all ancillary site works and service alterations / 0.1 km away / 23 May 2019Conditional grant
- 21503The development consists of the demolition of an existing common overflow carparking area to facilitate the provision of a light industrial facility with ancillary office space, yard spaces, refuse stores with carparking, bicycle parking, ESB substation, switch room and associated site works. PERMISSION is sought for the industrial and office facility to have the flexibility to be subdivided as follows: Option A: One No. Unit (Area: 5886m2) with Ancillary Yard and Refuse Store. Option B: Two No. Units (Units 01 Area: 3913m2) (Unit 02 Area: 1973m2) with Two No. Ancillary Yards and Two No. Refuse Stores. Option C: Three No. Units (Area Unit 01: 1973m2 / Area Unit 02: 1940m2 / Area Unit 3: 1973m2) with Three No. Ancillary Yards and Three No. Refuse Stores. Other works include the provision of 156 no. carparking spaces which include accessible spaces, EV charging areas and set-down areas with vehicular and HGV access points to the perimeter of site. Secure bicycle parking spaces, refuse stores with roof level and site level external services areas, building signage with all ancillary landscaping and associated site works and services. The planning application is accompanied by a Natura Impact Statement / 0.2 km away / 14 July 2021Conditional grant
- 2560242For the RETENTION and COMPLETION of relocation of the single storey services building with a generator/transformer compound and the alterations to the previously granted permission (Planning Ref: P24 – 60531) comprising of revisions: Extension to existing yard, removal of car spaces to adjacent carpark and relocating existing palladian fence to the new yard space edge. The proposed development also includes the addition of 2 No. external dock ports, minor amendments to internal configuration and omission of previously proposed external mezzanine plant decks. Note: there is no increase in floor area. Works also include all associated site development works / 0.2 km away / 26 June 2025Conditional grant
- 2460531The development consists of the alterations to the previously granted permission (Planning Ref: P21 – 503) comprising of revisions including: a reduced office area with new production floor welfare facilities (77sqm), relocating external palladian fence to the yard space, new single storey services building with a generator/transformer compound adjacent to existing substation. The proposed development also includes the addition to the existing service yard of a new sprinkler tank and pump station, 2 no. new dock levellers, two new roller doors, alterations to internal road, two no. external packaged plant units (16m x 3.8m each) and a new two storey external plant structure to house air handling units, plant and containment enclosure. Note: there is no increase in floor area, the mezzanine grid floor supports additional plant only. Works also include all associated site development works with minor amendments to existing carparking layouts. / 0.2 km away / 11 December 2024Conditional grant