Shannon Free Zone, Shannon, Co Clare
Planning application 20786
DecisionConditional grant
Decided09 December 2020
Application typePERMISSION
Source documents6
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Clare County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
No refusal reason is on record for this application yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Shannon Free Zone, Shannon, Co Clare?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Inside the decision file
Extracts from the council's own decision documents for this application — 26 pages of searchable text on file.Chief Executives Order4 pages indexed
Order No: CLARE COUNTY COUNCIL PLANNING AND DEVELOPMENT ACT 2000 (AS AMENDED) “AEB FS File Reference Number: P20/786 Name of Applicant: Address: Shannon Commerical Properties Universal House Shannon Free Zone Airport Avenue Shannon Co. Clare Application Received: 28/10/2020 Nature of Application: Permission the...
Final Grant8 pages indexed
C la re Pl a nn ng Au th or ity -I ns pe ct io n Pu rp os es O nl y!
Planners Report10 pages indexed
C la re Pl a nn ng Au th or ity -I ns pe ct io n Pu rp os es O nl y!
Read the full decision filePro members can search and read every indexed page of this file with the AI research assistant — planner's reasoning, conditions, and precedent across 4 documents.
Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
- Chief Executives OrderSource: clarecoco.eplanning.ie / 2cd092cf-065a-4e0f-9225-3e6d65814bb3.PDF / Document 520479Source PDF
- Final GrantSource: clarecoco.eplanning.ie / 8052d428-ab7f-43b6-bc8f-d1dd23ad7ca2.PDF / Document 526198Source PDF
- Planners ReportSource: clarecoco.eplanning.ie / Acef8586-3d7c-4a9f-86b6-016e7a138eeb.PDF / Document 520481Source PDF
- Planners ReportSource: clarecoco.eplanning.ie / Fa1fd958-4ddf-4ba9-ba5d-af9ff3c63268.PDF / Document 520482Source PDF
- Planners ReportSource: clarecoco.eplanning.ie / 454491d2-03f2-473b-bc2b-f0498a3a8710.PDF / Document 520483Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- 20575To: construct of 1 no Advanced Technology Manufacturing Unit. The building consists of a single storey high-bay industrial floor with ancillary office area and roof plant. Site works consists of the provision of an enclosed service yard with dedicated plant and refuse storage compound, rainwater harvesting tank and new sub-station, cycle parking and external landscaping, along with all associated site works, services and signage. Demolition of existing sub-station. The Building will replace the existing structures on site, the demolition which was granted under planning reference no P19-822. / 0.1 km away / 05 May 2021Granted
- 23224For development which will consist of alterations and amendments to the elevations, external finishes and site works previously permitted under Planning Reference No P20/575 / 0.1 km away / 26 May 2023Granted
- 19822For the Demolition of existing industrial/office buildings within Bays 77 and 79 of the Shannon Industrial Estate and associated site clearance works along with all other associated site works to allow for future development on the site at Caherteige and Drumgeely Td / 0.1 km away / 23 March 2020Granted
- 22773To erect 3,074.00 m2 or 564.64 kWp of photovoltaic panels on four roofs of our campus, with all associated site works. We are going to install solar panels on the roof, of Block T (55-56), Block T(57-59), Block V (160-161) and the new existing building of our campus, A glint and glare assessment will be submitted with the panning permission application / 0.2 km away / 24 October 2022Granted
- 21503The development consists of the demolition of an existing common overflow carparking area to facilitate the provision of a light industrial facility with ancillary office space, yard spaces, refuse stores with carparking, bicycle parking, ESB substation, switch room and associated site works. PERMISSION is sought for the industrial and office facility to have the flexibility to be subdivided as follows: Option A: One No. Unit (Area: 5886m2) with Ancillary Yard and Refuse Store. Option B: Two No. Units (Units 01 Area: 3913m2) (Unit 02 Area: 1973m2) with Two No. Ancillary Yards and Two No. Refuse Stores. Option C: Three No. Units (Area Unit 01: 1973m2 / Area Unit 02: 1940m2 / Area Unit 3: 1973m2) with Three No. Ancillary Yards and Three No. Refuse Stores. Other works include the provision of 156 no. carparking spaces which include accessible spaces, EV charging areas and set-down areas with vehicular and HGV access points to the perimeter of site. Secure bicycle parking spaces, refuse stores with roof level and site level external services areas, building signage with all ancillary landscaping and associated site works and services. The planning application is accompanied by a Natura Impact Statement / 0.2 km away / 14 July 2021Granted
- 2460531The development consists of the alterations to the previously granted permission (Planning Ref: P21 – 503) comprising of revisions including: a reduced office area with new production floor welfare facilities (77sqm), relocating external palladian fence to the yard space, new single storey services building with a generator/transformer compound adjacent to existing substation. The proposed development also includes the addition to the existing service yard of a new sprinkler tank and pump station, 2 no. new dock levellers, two new roller doors, alterations to internal road, two no. external packaged plant units (16m x 3.8m each) and a new two storey external plant structure to house air handling units, plant and containment enclosure. Note: there is no increase in floor area, the mezzanine grid floor supports additional plant only. Works also include all associated site development works with minor amendments to existing carparking layouts. / 0.2 km away / 11 December 2024Granted
- 2560242For the RETENTION and COMPLETION of relocation of the single storey services building with a generator/transformer compound and the alterations to the previously granted permission (Planning Ref: P24 – 60531) comprising of revisions: Extension to existing yard, removal of car spaces to adjacent carpark and relocating existing palladian fence to the new yard space edge. The proposed development also includes the addition of 2 No. external dock ports, minor amendments to internal configuration and omission of previously proposed external mezzanine plant decks. Note: there is no increase in floor area. Works also include all associated site development works / 0.2 km away / 26 June 2025Granted
- 23536For the construction of a new lift facility and all associated works / 0.2 km away / 08 December 2023Granted