2273: Of alterations and changes to dwelling house and septic tank, as constructed, from grant of permission reference P8/26445
Sorrel Island, Lissycasey, Co Clare
DecisionConditional grant
Decided29 March 2022
Application typeRETENTION
Source documents5
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Clare has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
- Chief Executives OrderSource: clarecoco.eplanning.ie / C8aff45c-ce68-4f6a-a7ce-6051fd35284c.pdf / Document 597192Source PDF
- Final GrantSource: clarecoco.eplanning.ie / 0f1ffc77-34a5-429e-a907-bc7eb22c6904.pdf / Document 604296Source PDF
- Planners ReportSource: clarecoco.eplanning.ie / Bc579cc6-8127-439a-8540-4f0621a11980.pdf / Document 597194Source PDF
- Planners ReportSource: clarecoco.eplanning.ie / 1e7e763a-4944-4d93-a4f4-9f8760ac6c99.pdf / Document 597195Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- 23290For development at lands at Crossmore County Clare in the townlands of Furroor, Illaunatoo or Sorrelisand, Boolynakockaun and Booltiagh. The development will consist of: 1. Amendment to item (1) of Permitted Development Pl. Ref: 21/1057 to install a 38kV electrical connection over a total length of approximately 11km, from the permitted Crossmore Wind Farm (Pl. Ref: 09/123, as extended under Pl. Ref: 19/388 and altered by Pl. Ref: 20/284) to the entrance to the existing Booltiagh 110kV electrical substation. This amended connection will consist of: a. Revision to site boundaries as permitted under Pl. Ref: 21/1057; b. Removal of permitted overhead line from permitted polesets north of Local Road L2084 (previously numbered polesets 1-40 consented under Pl. Ref: 21/1057) for a distance of circa 4km and its replacement with c. 6.5km of underground electrical cabling along unnamed Local Roads. c. Relocation of permitted poleset number 40 (consented under Pl. Ref: 21/1057) 7m (meters) south. Redesign of poleset number 40 from double (as permitted under Pl. Ref: 21/1057) to triple (termination) poleset. The entirety of the grid connection from Crossmore Wind Farm to the existing Booltiagh 110kV electrical substation will therefore comprise c. 5.5km of overhead line (poleset numbers 41-93 conscented under Pl. Ref: 21/1057) c. 6.5km of underground cable (proposed under subject application) 2. Site Drainage 3. All associated site development and ancillary works. The application will be accompanied by a Natura Impact Statement (NIS) / 0.5 km away / 11 July 2023Granted
- 18517For development which will consist of: carry out extensions and alterations to existing habitable dwelling house including (a) RETAIN rear part of existing house and removed remaining structure (b) construct extension and alterations to remaining part of existing dwelling house (c) new connected garage (d) remove existing out buildings as shown (e) connect to existing services and associated site works. / 0.5 km away / 18 December 2018Granted
- 2560326To erect dwelling house, waste water treatment system, percolation area, new site entrance and all associated works / 2.0 km away / 20 January 2026Granted
- 18555For development which will consist of the installation of battery arrays located within container units (18 number units, each 30m2 by c. 2.6m tall) a control building (c 160.5m2 by c.6.4m tall) and transformer (c. 5m tall). The development will include for ancillary infrastructure including security fencing, lighting, CCTV, Internal access roads & drainage. The overall development site is c.1.4Ha. / 2.1 km away / 30 August 2018Granted
- 2360414For development which will consist of a 10 year planning permission for the construction and operation of battery arrays (240 number units, each 1.87m2 by c. 2.32m tall), a control building with gross floor area 140m2 by 6.40m tall, 3 number 12MVA transformers (c. 3.5m tall), 1 number 2.5MVA transformer (c. 2.5m tall) and inverters (24 number units, each 1.85m2 by c. 2.22m tall. The development will include for ancillary infrastructure including security fencing, lighting, CCTV, internal access roads and drainage. The development will have a 35 year operational lifetime. The overall development site is ca. 1.42 hectares (ha) / 2.1 km away / 23 November 2023Granted
- 19869For the erection of a permanent health and safety sign including all ancillary site works, at the entrance to Glenmore Wind Farm / 2.3 km away / 16 December 2019Granted
- 19299For the construction of a battery storage compound adjacent to an existing electricity substation, with new palisade fencing, bunded concrete plinths, up to 4 No. storage units and associated equipment, transformers and all ancillary site works. A Natura Impact Statement ( NIS ) has been prepared and included as part of this application / 2.3 km away / 09 September 2019Granted
- 24217To construct a new dwelling house and garage complete with a new entrance, sewage treatment system and ancillary works / 2.4 km away / 02 October 2024Granted