Dromourneen Bantry
Planning application 06/245
DecisionConditional grant
Decided26 June 2006
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Cork County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Cork has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Dromourneen Bantry?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- 18/743Planning retention for domestic garage, with domestic storage overhead, & all associated site works / 0.1 km away / 25 January 2019Granted
- 04/2211Relocation of substation and provision of site tracks in relation to grant of planning W/02/3281 / 0.4 km away / 27 May 2004Granted
- 25/394Construct a cattle house with slatted slurry tank and carry out all asociated site works / 0.7 km away / 08 September 2025Granted
- 05/9586Wind farm to consist of 13 no. wind turbines with blade tip height of up to 100m, electrical substation and control building, 60m high meteorological mast, site entrances, access tracks, hardstandings and ancillary site works / 0.7 km away / 23 February 2006Granted
- 02/3281Windfarm consisting of 21 no. turbines, 60m high met mast, substation and control building, site tracks and entrances / 0.7 km away / 25 February 2003Granted
- 04/5143Dwelling / 1.1 km away / 30 August 2004Granted
- 16/6The upgrade of the existing site entrance at Derreennacno and amendment of Condition 1 of An Bord Pleanala Reference PL 04.216875 (a permission for 13 no. turbines) to specify that the structures should be removed at the expiration of a 25 year period instead of the 20 years permitted. Permission is also sought for the amendment of Condition 4 of An Bord Pleanala Reference PL 88. 235028, (a permission for 6 no. turbines) to specify that the permission is for a period of 25 years from the date of commissioning instead of the 20 years specified in the condition. An environmental impact statement (EIS) has been prepared and will be submitted to the planning authority with this application / 1.2 km away / 29 February 2016Granted
- 04/684Dwellinghouse (Change of Plan) / 1.2 km away / 05 April 2004Granted