Townlands of Lognagappul, Lackenafasoge, Glanaphuca-Caheragh Drimoleague, and Townlands of Dromourneen,Derreennacno and Barryroe-Bantry-Glanta Commons Wind Farm
Planning application 16/6
DecisionConditional grant
Decided29 February 2016
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Cork County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Cork has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Townlands of Lognagappul, Lackenafasoge, Glanaphuca-Caheragh Drimoleague, and Townlands of Dromourneen,Derreennacno and Barryroe-Bantry-Glanta Commons Wind Farm?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- 02/3280Erection of 40m high wind monitoring mast / 0.1 km away / 17 September 2002Granted
- 05/9586Wind farm to consist of 13 no. wind turbines with blade tip height of up to 100m, electrical substation and control building, 60m high meteorological mast, site entrances, access tracks, hardstandings and ancillary site works / 0.5 km away / 23 February 2006Granted
- 02/3281Windfarm consisting of 21 no. turbines, 60m high met mast, substation and control building, site tracks and entrances / 0.5 km away / 25 February 2003Granted
- 09/849Ten year planning permission for a wind farm of up to 6 wind turbines (hub height 64m and rotor diameter of 71m - tip height of 99.5m), access roads, hardstandings, underground cabling, rock borrow pit and ancillary site works - forming an extension to the existing Glanta Commons Windfarm / 0.6 km away / 18 September 2009Granted
- 13/76Modification to the ten year planning permission for up to six turbines forming an extension to the Glanta Commons Wind Farm granted under An Bord Pleanala reference number PL 88.235028 (County Council number 09/849). The modification is to increase the turbine hub heights from 64m to 74.5m. Turbine locations and wind farm access roads to remain the same as granted by An Bord Pleanala / 0.9 km away / 05 April 2013Granted
- 04/2211Relocation of substation and provision of site tracks in relation to grant of planning W/02/3281 / 1.0 km away / 27 May 2004Granted
- 15/320A ten year planning permission for up to two wind turbines with a tip height of up to 110 metres, site access roads, hardstanding areas, underground cabling and all ancillary site works - forming an extension to the existing Glanta Commons Wind Farm, consisting of nineteen wind turbines. An environmental impact statement (EIS) has been prepared and will be submitted to the Planning Authority with this application / 1.1 km away / 06 August 2015Granted
- 18/743Planning retention for domestic garage, with domestic storage overhead, & all associated site works / 1.1 km away / 25 January 2019Granted