Dromourneen, Lognagappul Barryroe, Bantry, Co. Cork West and adjacent to existing Glanta Commons Wind Farm
Planning application 13/76
DecisionConditional grant
Decided05 April 2013
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Cork County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Cork has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Dromourneen, Lognagappul Barryroe, Bantry, Co. Cork West and adjacent to existing Glanta Commons Wind Farm?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- 15/320A ten year planning permission for up to two wind turbines with a tip height of up to 110 metres, site access roads, hardstanding areas, underground cabling and all ancillary site works - forming an extension to the existing Glanta Commons Wind Farm, consisting of nineteen wind turbines. An environmental impact statement (EIS) has been prepared and will be submitted to the Planning Authority with this application / 0.3 km away / 06 August 2015Granted
- 09/849Ten year planning permission for a wind farm of up to 6 wind turbines (hub height 64m and rotor diameter of 71m - tip height of 99.5m), access roads, hardstandings, underground cabling, rock borrow pit and ancillary site works - forming an extension to the existing Glanta Commons Windfarm / 0.4 km away / 18 September 2009Granted
- 19/320The construction of a loose open Livestock shed for the housing of sheep and cattle, a dungstead and a slurry/soiler water tank / 0.8 km away / 08 July 2019Granted
- 02/3280Erection of 40m high wind monitoring mast / 0.8 km away / 17 September 2002Granted
- 09/119Dwellinghouse, domestic garage and stables for private use / 0.8 km away / 27 March 2009Granted
- 16/6The upgrade of the existing site entrance at Derreennacno and amendment of Condition 1 of An Bord Pleanala Reference PL 04.216875 (a permission for 13 no. turbines) to specify that the structures should be removed at the expiration of a 25 year period instead of the 20 years permitted. Permission is also sought for the amendment of Condition 4 of An Bord Pleanala Reference PL 88. 235028, (a permission for 6 no. turbines) to specify that the permission is for a period of 25 years from the date of commissioning instead of the 20 years specified in the condition. An environmental impact statement (EIS) has been prepared and will be submitted to the planning authority with this application / 0.9 km away / 29 February 2016Granted
- 05/442Extension to dwelling / 1.3 km away / 24 March 2005Granted
- 03/5803Dwellinghouse / 1.3 km away / 23 January 2004Granted