Carrigogna Midleton
Planning application 07/4828
DecisionConditional grant
Decided31 May 2007
Application typeOUTLINE PERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Cork County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Cork has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Carrigogna Midleton?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- 08/8471Construction of split level single storey dwelling and installation of wastewater treatment unit / 0.0 km away / 26 March 2009Granted
- 23/5310A) Conservatory to front of dwelling house. B) Minor modifications to windows and door openings on front elevation and C) Timber framed shed to side of dwelling. / 0.0 km away / 21 August 2023Granted
- 03/2075Construction of ground floor and 1st floor extensions to dwelling and partial demolition of extension / 0.1 km away / 12 June 2003Granted
- 23/524610 year permission to develop an Energy Storage System, which will connect to the adjoining ESB Midleton 110kV Electricity Substation. The proposed development will have a projected life span of 30 years. The development will consist of the construction of 1) enclosed battery energy storage system within a site compound on a total of up to c.0.83 hectare site, to include: 1 no. single storey 110kV customer substation, control and switch rooms; up to 13 battery blocks on concrete support structures including heating, ventilation and air conditioning unit (HVAC units); transformer and inverter units; including access tracks and site entrance along existing roadway; associated electrical cabling and ducting; security gates, 2.6m palisade perimeter security fencing; CCTV system; landscaping works and all other associated ancillary infrastructure. / 0.2 km away / 12 September 2023Granted
- 18/4550Development of grid system services facility within a total site area of up to 0.76 hectares, to include 1 no. single storey electrical substation building, 1 no. customer switcher gear, electrical inverter/transformer station modules, containerised battery storage modules on concrete support structures, heating, ventilation and air conditioning units (HVAC units), access tracks and new site entrance, associated electrical cabling and ducting, security gates, perimeter security fencing, CCTV security monitoring system, animal fencing, earth bund and landscaping works and all associated ancillary infrastructure on land. / 0.2 km away / 26 April 2018Granted
- 22/5789Alterations to the existing Midleton 110kV station to include a single storey extension on the northern side of the existing control building and the extension of the existing compound palisade fence to the north of the site. / 0.3 km away / 21 September 2022Granted
- 25/6374A 10-year permission for a solar farm consisting of solar photovoltaic panels on ground mounted frames, 1 single-storey delivery station, 1 single-storey transformer station, 1 single-storey spare parts storage container, construction of a new site entrance off the L - 36014 local road, internal access tracks, security fencing, CCTV, landscaping and all associated development site works. The solar panels are arranged within a total developable site area (including ancillary works) of 8.85ha at Carrigogna, Midleton, Co. Cork. This development is covered by the provisions of the Renewable Energy Directive III (directive(EU) 2023/2024) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act, as amended. When a notice issues in accordance with section34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply. / 0.3 km away / 27 April 2026Granted
- 15/5441Alterations to the existing Midleton 110kV station to include; extension to the existing compound palisade fence, single storey side extension to the existing control building, 1 no. 18meter high monopole, 1 no. transformer and transformer bay, associated drainage and site works / 0.3 km away / 17 August 2015Granted