Wallingstown Little Island
Planning application 07/9492
DecisionConditional grant
Decided30 August 2007
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Cork County Council.Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Cork has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Wallingstown Little Island?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- 21/5225The development of an 110kV substation at the former Mitsui Denman site. The proposed substation will comprise of: a two-storey Gas Insulated Switcher (GIS) 110/20kV substation building, an associated single storey Gas Insulated Switchgear (GIS) 20kV substation building, associated outdoor electrical equipment, including filter banks, transformers, cable sealing ends and surge arresters, two number lightning protection masts (12.5 metres in height), associated internal access road, boundary treatment including substation perimeter fencing and all ancillary site development works. Construction of two number 110kV underground cable ducts between the proposed substation and the existing Eirgrid 110kV substation to the North in Wallingstown. The site area of the proposed substation is approximately 0.60ha. The proposed substation is to support development in the Wallingstown area in Little Island. - Extension of duration of permission granted under planning reference: 16/5606. / 0.1 km away / 29 June 2021Granted
- 16/5606The development of an 110kV substation at the former Mitsui Denman site. The proposed substation will comprise of: a two-storey Gas Insulated Switcher (GIS) 110/20kV substation building, an associated single storey Gas Insulated Switchgear (GIS) 20kV substation building, associated outdoor electrical equipment, including filter banks, transformers, cable sealing ends and surge arresters, two number lightning protection masts (12.5 metres in height), associated internal access road, boundary treatment including substation perimeter fencing and all ancillary site development works. Construction of two number 110kV underground cable ducts between the proposed substation and the existing Eirgrid 110kV substation to the North in Wallingstown. The site area of the proposed substation is approximately 0.60ha. The proposed substation is to support development in the Wallingstown area in Little Island / 0.1 km away / 22 August 2016Granted
- 23/4506The construction of a single-storey 10/20kV ESB substation and all associated site development works. / 0.1 km away / 11 May 2023Granted
- 22/5746Development at the site of the permitted, not yet constructed, 110kV substation on the former Mitsui Denman site consisting of modifications to the 110kV substation permitted by Cork County Council under Pl.Reg.No. 16/5606, as extended under Pl.Reg.No. 21/5225. The proposed modifications will consist of: (1) an increase in the floor area of the permitted two-storey Gas Insulated Switchgear (GIS) 110/20kV substation building (Building A) from c.236.34m2 to c.1,291m2, as well as an increase in height from c.10.4m to c.15m; (b) 1 no. additional single-storey 20 kV switch room and protection building (Building C) (c.151m2); (c) an increase in site area from c.06ha to 0.9249ha: (d) all associated site works including 1 no. additional lighting rod (c.12.5m in height), revisions to 2.4m high palisade security fencing, a new sliding gate, a kiosk on a concrete plinth, and the realignment of the 2 no. 110kV underground cable ducts between the proposed substation and the existing EirGrid 110kV substation to the north. / 0.1 km away / 19 September 2022Granted
- 07/10956Construction of warehouse facility with ancillary two-storey office building and associated site works / 0.1 km away / 07 July 2008Granted
- 15/6678The extension of an existing car park from 44 to 95 number spaces together with associated site works including a stepped path connecting to an adjoining property / 0.1 km away / 16 March 2016Granted
- 25/5059Retention permission for a) the change of use of the original building from warehouse and offices to a safety training centre, b) provision of thirteen containers for use in association with the safety training centre, c) construction of two links located to the east of the building connecting the building to two containers, d) provision of plant used for the purposes of safety training including water tank with pump house, LPG tanks and a fire training platform and e) other ancillary development including above door signage, fencing and gates. Permission for the construction of a bike shelter storage and other ancillary development, including the provision of EV parking along with additional landscaping / 0.1 km away / 08 January 2026Granted
- 15/5450Demolition of existing structures on site and construction of Phase 1 of a Business Park development to include 4 no. office based industry/enterprise buildings of 2 to 3 storey's with associated roads and access infrastructure, car parking, landscaping, site level changes, services and ancillary works, construction of 2 no. roundabouts at access points off the R623 and construction of 4 no. electricity substations - Extention of duration of permission granted under planning ref: 07/12475 / 0.1 km away / 24 August 2015Granted