Ballynabointra Midleton
Planning application 08/4218
DecisionConditional grant
Decided12 March 2008
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Cork County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Cork has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Ballynabointra Midleton?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- 09/7297Two-storey dwellinghouse, septic tank and associated site works / 0.2 km away / 03 December 2009Granted
- 23/6118The development will consist of the construction of a new storage shed and an external paved yard to facilitate the importation, storage and processing of road planings with an application site of c. 1.0 hectares. The development will comprise- Construction of an external yard comprising a reinforced concrete ground bearing slab (c.2032m2) to store and process imported road planings. Construction of a portal frame storage shed (c.2053m2) to store processed road planings. Installation of sub-surface drainage to collect surface water run-off which will discharge via a silt trap and hydrocarbon interceptor to the adjoining quarry floor (and to the ground thereafter). / 0.2 km away / 24 April 2024Granted
- 12/4480Erection of a new Asphalt Plant incorporating an 18.25m above ground level emissions stack, located to the west of the existing quarry void, together with associated site works to include localised re-alignment of the internal haul road and provision of hardstanding; fuel tank; bitumen storage tanks; control cabin and containers / 0.3 km away / 17 September 2012Granted
- 12/4278Construction of timber frame manufacturing factory consisting of single storey manufacturing/dispatch area, single storey store, two storey office, external lean-to canopies, signage, plant room, site entrance, internal roadways, car parking, waste water treatment and associated works, extension of duration of permission granted under Planning Reg. No. 06/5398 (PL04.223603) / 0.3 km away / 17 April 2012Granted
- 06/5398Construction of timber frame manufacturing factory consisting of single storey manufacturing/dispatch area, single storey store area, two storey office, external lean-to canopies, signage, detached plant room building, site entrance, internal roadways, provision for car parking, waste water treatment plant and associated site works / 0.3 km away / 26 April 2007Granted
- 08/8847Retention of generator building, storage container, electrical switch room building, staff portacabin, diesel tank and bund, E.S.B. substation/electrical building, two-storey office/laboratory building and associated site works / 0.4 km away / 05 November 2008Granted
- 23/5644The development will consist of the installation of a replacement block production yard and block storage area within an application area of c.2hectares. The development will comprise of; 1) the construction of new block production yard, comprising a reinforced concrete ground bearing slab (c.7,155m2), 2) installation of sub-surface storm water drainage beneath the concrete slab which will discharge via a silt trap and hydrocarbon interceptor to the adjoining quarry floor (and to ground thereafter) and 3) provision of a hard standing (unpaved) area (c.2,950m2) for concrete block storage pending sale and dispatch off-site. / 0.4 km away / 04 October 2023Granted
- 15/4529Construction of new gated access to serve the Lagan Concrete site off the Ballynabointra Road. The proposed works include the provision of a wheelwash, 2.4 metre high palisade fencing, traffic signs, road markings, public lighting and all associated site works and services / 0.4 km away / 14 July 2015Granted