Ballynabointra Midleton
Planning application 12/4278
DecisionUnconditional grant
Decided17 April 2012
Application typeEXTENSION OF DURATION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Cork County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Cork has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Ballynabointra Midleton?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- 06/5398Construction of timber frame manufacturing factory consisting of single storey manufacturing/dispatch area, single storey store area, two storey office, external lean-to canopies, signage, detached plant room building, site entrance, internal roadways, provision for car parking, waste water treatment plant and associated site works / 0.0 km away / 26 April 2007Granted
- 08/4218Retention and completion of vehicle maintenance facility incorporating two storey office over storage area, installation of proprietary treatment unit and associated site works / 0.3 km away / 12 March 2008Granted
- 09/7297Two-storey dwellinghouse, septic tank and associated site works / 0.4 km away / 03 December 2009Granted
- 14/4995Retention of quarrying including the winning rock by blasting in excess of the area approved under Planning Ref. No. 08/4711, Retention of Mill House, Retention of change of use of agricultural building as limestone product store and all ancillary works / 0.5 km away / 28 April 2015Granted
- 08/4711Extraction of rock from quarry using blasting techniques / 0.5 km away / 04 June 2008Granted
- 06/11928Erection of 2 no. 16.25m high 110kV overhead line cable interface lattice steel masts / 0.5 km away / 21 December 2006Granted
- 23/6118The development will consist of the construction of a new storage shed and an external paved yard to facilitate the importation, storage and processing of road planings with an application site of c. 1.0 hectares. The development will comprise- Construction of an external yard comprising a reinforced concrete ground bearing slab (c.2032m2) to store and process imported road planings. Construction of a portal frame storage shed (c.2053m2) to store processed road planings. Installation of sub-surface drainage to collect surface water run-off which will discharge via a silt trap and hydrocarbon interceptor to the adjoining quarry floor (and to the ground thereafter). / 0.6 km away / 24 April 2024Granted
- 18/5871Construction of an extension to the eastern side of existing dwellinghouse and alterations including roof windows and demolition of existing extension, increase height of existing roadside boundary wall, new entrance gates and all associated site works. Extension of Duration of Permission granted under Planning Reference: 13/5074. / 0.6 km away / 10 September 2018Granted