Caherbarnagh Rathmore
Planning application 08/5406
DecisionRefused
Decided07 May 2008
Application typeOUTLINE PERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Cork County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
Refusal reasons not machine-readable
Documents are indexed. Reason extraction for Cork has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Caherbarnagh Rathmore?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- 15/6698Construction of dwellinghouse, mechanical treatment unit, intermittent filter and all site development works / 0.1 km away / 17 August 2016Refused
- 04/7310Retention of sand and gravel extraction and restoration of land to original levels / 1.0 km away / 09 December 2004Refused
- 05/7269Dwellinghouse / 1.5 km away / 29 November 2005Refused
- 07/6016Dwelling / 1.5 km away / 08 May 2007Refused
- 06/10133Dwellinghouse / 1.5 km away / 23 January 2007Refused
- 03/1641Dwellinghouse / 1.7 km away / 30 May 2003Refused
- 10/4887Construction of 90MW Pumped Hydro Energy Storage Scheme (PHES). The Gortavehy 90MW pumped hydro energy storage scheme will consist of an upper reservoir & a peat storage bund with embankments and an upper intake structure. A lower reservoir with a dam & spillway & lower intake structure. An underground power house. Underground tunnels consisting of a penstock, a tailrace & an access tunnel connecting to the power house. An outdoor 110kV switchyard with connection works. Permanent access roads & a new site entrance on the L1130. Percolation area with a wastewater treatment unit. Site boundary treatments including walls, fencing & landscaping, underground services, on site disposal of surface & storm water to settlement ponds & associated & ancillary site development works / 1.8 km away / 08 June 2010Refused
- 13/6429Construction of a two-storey dwelling house, domestic garage, septic tank and percolation area and all site development works / 1.9 km away / 21 February 2014Refused