Brinny Innishannon
Planning application 09/6835
DecisionConditional grant
Decided07 October 2009
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Cork County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Cork has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Brinny Innishannon?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- 12/4032Construction of a single storey personnel and material access link (floor area of 24.2m.sq), with associated site works, located between the existing Operation's Building 1 (OPS1) and the existing storage and lift building. The height of proposed link is 5m. / 0.0 km away / 05 March 2012Granted
- 12/5083(a)Erection of four 250m3 (13metres high) storage tanks in the area of the existing waste water treatment facility, involving the demolition of two existing redundant shed buildings. (b)Removal/demolition of two existing redundant waste water treatment tanks and the construction of a decanter, control and plant room building of 211m2 (7.5 meters high) in the area of the existing waste water treatment facility, above a redundant bund that will become a basement space designated for future use as a plant room. (c)The construction of a 6.25m2 (3.3 metres high) storm water monitoring building, at the southern end of the facility. Associated site works will consist of paths and landscaping / 0.1 km away / 12 July 2012Granted
- 17/5829A single storey extension to the north of building 4 Suite 2 to facilitate the transfer of material from the production suite, (floor area of 24.8sq.m) and associated site works. The replacement of the existing site security fencing to the perimeter of the site with a new 2400mm high fence. This application relates to development which comprises of an activity which requires an integrated pollution prevention and control licence / 0.1 km away / 06 September 2017Granted
- 22/4275The development will consist of the construction of a two storey extension with external mezzanine at roof level (17.130m High) to the existing production building, a single storey extension to the existing electrical sub-station (5.289m high), external plant, pipe-rack, pumps and associated equipment. The application relates to a development which comprises or is for the purpose of an activity requiring an Industrial Emissions Directive Licence issued by the Environmental Protection Agency (EPA) / 0.1 km away / 06 April 2022Granted
- 21/4848A single storey central server room extension (22 sq m) and associated ancillary site works to the rear of the existing service building. This application relates to a development, which comprises an activity for which an Industrial Emissions License under part IV of the Environmental Protection Agency Act 1992 (as amended) is required. / 0.1 km away / 25 May 2021Granted
- 18/4345Retention for the construction of a 14sqm first floor extension to the east façade of an existing production building (Building 8) for a new cold room storage for industrial/pharmaceutical use and the construction of 2no. new door openings to the ground floor of the north façade of an existing production building (Building 22). This application relates to a development which comprises an activity for which an Industrial Emissions Licence under part IV of the Environment Protection Agency 1992 (as amended) is required. / 0.1 km away / 29 March 2018Granted
- 11/4339(a) New pedestrian corridor connecting the production areas of Operations Building 1 (OPS 1) to Operations Building 2 (OPS 2) consisting of a single storey corridor to facilitate personnel moving between the Operations Buildings with a local first floor crossover which will include stairs and personnel lifts to provide access for non-production personnel crossing the new corridor. The development will consist of a total area of 142 square metres at ground floor level and 64 square metres for the first floor cross-over and plant room and height of 10.300 metres. Associated site works will consist of paths and landscaping. (b) Change of use of existing switch room building S900 (total area of 53 square metres) to general use by factory personnel for small part stores and changing facilities. / 0.1 km away / 15 April 2011Granted
- 11/6052Works to existing building 22 fermentation building previously granted permission under Planning Reg. No. S/93/464 consisting of:[a] elevational changes to the ground floor of the existing two storey structure consisting of replacement of existing cladding with new windows, doors and metal cladding to the south, east and west elevations and associted paths and landscaping, and [b] retention of existing extension to the south east corner of the building on the ground and first floors / 0.1 km away / 17 November 2011Granted