15 Cuil Na Coille, Slievereagh Ballyvourney Macroom
Planning application 10/4901
DecisionConditional grant
Decided10 June 2010
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Cork County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Cork has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near 15 Cuil Na Coille, Slievereagh Ballyvourney Macroom?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- 22/6433Athraithe a dhéanamh ar an fhorbairt ceadaithe cheana faoi thagairt phleanála 19/5869 don chéad phas d’athfhorbairt phasach agus athrú úsáide de iarr Choláiste Íosagáin, anois in anchaoi, ag An Sliabh Riabhach, Baile Bhuirne, Maigh Chromtha, Co. Chorcaí. Tá na leasaithe seo leanas á moladh ar an fhorbairt a ceadaíodh roimhe seo: (i) Páirt-scartáil de fhoirgneamh iar Choláiste Íosagáin (an chuid aon stór ar chúl an iarr fhoirgneamh scoile), (ii) Mionathraithe ar na leaganacha amach den fhoirgneamh atá ann cheana ceadaithe faoi thagairt pleanála 19/5869, (iii) Síneadh nua 3 stór a thogáil, ina mbeidh san áireamh forsheomra iontrála, ardaitheoir, staighre, leithris, pasáistí agus seomraí innealra ar chúl an phríomh fhoirgneamh atá ann cheana le húsáid mar spásanna coimhdeacha leis an úsáid oifige ceadaithe faoi thagairt pleanála 19/5869, (iv) Tógail 2 umar stórála uisce comhraicthe dóiteáin os cionn talún, (v) Tógail carrchlóis, draenáil, tírdhreachtú, comharthaíocht agus no hoibreacha suímh ar fad bainteach leo. Permission for amendments to development permitted under Ref No. 19/5869 for the 1st phase of a phased redevelopment and change of use of the former Coláiste Íosagáin Building which is now in disrepair in Sliabh Riabhach. The following are the proposed amendments to the previously approved development: 1.Partial Demolition of former Coláiste Iosagáin existing building (single storey structure to rear of former school building) 2.Minor alterations to the layout of the building previously permitted under 19/5869. 3. Construction of new three-storey extension which will include entrance lobby, lifts, stairs, bathrooms, passages, and machinery room to the rear of the existing main building for use as spaces ancillary to the office use permitted under 19/5869. 4. Construction of 2 no. above-ground fire-fighting water storage tanks 5. Construction of car parks, drainage, landscaping, signage, and all associated site works. / 0.1 km away / 05 April 2023Granted
- 19/5869An chéad phas de fhorbait céimnithe, ina mbeidh, (i) athrú úsáide go húsáid oifige do chuid den fhoirgneamh atá ann cheana (ii) athrú úsáide go húsáid halla taispeántais do chuid den mbunurlár (iii) páirteanna den tógáil aon stór ag cúl an fhoirgnimh agus seomraí coire 3 stór agus na botháin stórais coimhdeacha a leagadh (iv) struchtúr do ardaitheoir trí stór agus staighrí a thógáil ag cúl phríomh fhoirgneamh atá ann cheana (v) athchóiriú agus athruithe a dhéanamh ar an chuid lárnach den fhoirgneamh atá ann cheana (vi) athruithe a dhéanamh ar fhallaí teorainn, iotráil suímhe agus geataí atá ann cheana, láithreacha nua páirceála, oibreacha draenála, tírdhreachtú, comharthaíocht agus oibreacha suímhe gaolmhara. /The first phase of a phased development consisting of (i) Change of use of existing building to office use, (ii) Change of use of part of ground floor to use as exhibition hall, (iii) Demolition of part of a single storey construction to the rear of the building, 3-storey boiler rooms and ancillary storage sheds, (iv) Construction of a 3-storey elevator structure and stairs to the rear of the main existing building, (v) Renovation and changes to the central part of the existing building, (vi) Changes to the existing boundary walls, site entrance and gates, new parking spaces, drainage works, landscaping, signage and associated site works. At the former Colaiste Íosagáin, empty now, Slievereagh, Ballyvourney, Macroom, Co.Cork / 0.1 km away / 25 August 2020Granted
- 05/6317Dwellinghouse and garage / 0.2 km away / 01 February 2007Granted
- 10/6098Erection of advertising sign post / 0.2 km away / 15 October 2010Granted
- 09/5884Construction of hair salon studio / 0.2 km away / 30 July 2009Granted
- 08/9298Construction of garage / 0.2 km away / 03 December 2008Granted
- 03/6786Dormer bungalow and treatment unit / 0.2 km away / 24 February 2004Granted
- 19/5026Construction of new domestic entrance to existing dwellinghouse. / 0.2 km away / 13 June 2019Granted