Iar Choláiste Íosagáin, atá anois folamh ag An Sliabh Riabhach/ Slievereagh, Baile Bhuirne/Ballyvourney, Maigh Chromatha, Macroom, Co. Chorcaí/Co. Cork
Planning application 22/6433
DecisionConditional grant
Decided05 April 2023
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Cork County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Cork has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Iar Choláiste Íosagáin, atá anois folamh ag An Sliabh Riabhach/ Slievereagh, Baile Bhuirne/Ballyvourney, Maigh Chromatha, Macroom, Co. Chorcaí/Co. Cork?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- 19/5869An chéad phas de fhorbait céimnithe, ina mbeidh, (i) athrú úsáide go húsáid oifige do chuid den fhoirgneamh atá ann cheana (ii) athrú úsáide go húsáid halla taispeántais do chuid den mbunurlár (iii) páirteanna den tógáil aon stór ag cúl an fhoirgnimh agus seomraí coire 3 stór agus na botháin stórais coimhdeacha a leagadh (iv) struchtúr do ardaitheoir trí stór agus staighrí a thógáil ag cúl phríomh fhoirgneamh atá ann cheana (v) athchóiriú agus athruithe a dhéanamh ar an chuid lárnach den fhoirgneamh atá ann cheana (vi) athruithe a dhéanamh ar fhallaí teorainn, iotráil suímhe agus geataí atá ann cheana, láithreacha nua páirceála, oibreacha draenála, tírdhreachtú, comharthaíocht agus oibreacha suímhe gaolmhara. /The first phase of a phased development consisting of (i) Change of use of existing building to office use, (ii) Change of use of part of ground floor to use as exhibition hall, (iii) Demolition of part of a single storey construction to the rear of the building, 3-storey boiler rooms and ancillary storage sheds, (iv) Construction of a 3-storey elevator structure and stairs to the rear of the main existing building, (v) Renovation and changes to the central part of the existing building, (vi) Changes to the existing boundary walls, site entrance and gates, new parking spaces, drainage works, landscaping, signage and associated site works. At the former Colaiste Íosagáin, empty now, Slievereagh, Ballyvourney, Macroom, Co.Cork / 0.0 km away / 25 August 2020Granted
- 10/4901Internal alterations and ground and first floor extension (133.5 square metres) to an existing dwellinghouse, construction of a shed (13.5 square metres) and an underground rainharvesting tank, provision of solar panel at roof level of house and associated site works / 0.1 km away / 10 June 2010Granted
- 16/4912Fo-Staisiun Leictreach agus Seomra Lasc lena hais, cho maith le oibrithe coimhdeach laithreain, a thogail le hais an Monarcha Nua do Phroiseas Bidh le Follain Teo (Electrical substation and switch room which will be located within the site boundaries of the new food process facility) / 0.2 km away / 15 June 2016Granted
- 15/4464Cead pleanala chun (1) Meadu a chur leis an stor do thairge deanta, cuid de'n fhoirgneamh a thogail fe lathair agus (2) Stor athchursala tirim agus clos athchursala, chomaith le oibrithe coimhdeach laithreain, a thogail le hais an monarcha nua do phroiseas bidh le Follain Teo / 0.2 km away / 19 June 2015Granted
- 13/4748Cead Pleanála chun monarcha próiseas bidh a thógáil, ina mbeidh áiseanna ullmhúcháin bidh, proiseas and pacaistiocht, stór do earraí deanta, seomraí gaileadán agus innealra, oifigí. Gailearaí feachana agus siopa do chuairteoirí, bealach isteach agus amach do fheithiclí, áiseanna pairceáil agus cúrsaiochta, corais draenala searachais agus baistí, comharthaí agus oibreacha coimhdeach laithreain. Permission for construction of a food processing factory which will include food preparation facilities, processing and packaging, a store for finished products, boiler and machinery rooms, offices, a viewing gallery and shop for visitors, entrance and egress for vehicles, parking and circulation facilities, sewage and rainwater drainage systems, signs and all associated site works / 0.2 km away / 30 July 2013Granted
- 19/61931) Cead Pleanala a fhail le foirgneamh storala breise le framai cruach iarainn a thogail mar mheadu achair ar an bhFoirgneamh Storala ata togtha cheana fein (faoi Cead Pleanala 18/06386), chomaith le oibrithe coimdeach laithreain ar shuiomh ata congarach do’n Mhonarcha Nua do Phroiseas Bidh le Follain Teo. 2) Cead Pleanala a fhail le paneil fotavoltach greine a chur ar dhionta an priomh Monarcha Phroiseas Bidh agus an Foirgneamh Storala. [1) Permission for construction of an additional steel framed storage building, thus extending the area of the existing storage building (granted under Planning Ref: No: 18/6386) as well as associated site works on the site close to the new Follain Teo food processing factory. 2) Permission to install a photovoltaic solar panel on the roof of the main food processing factory and the storage building]. / 0.2 km away / 17 December 2019Granted
- 22/4665Le framai cruach iarainn a thogail in aired ar an mba ualaigh ata suite laistiar den Monarcha Phroiseas Bidh le Follain Teo. (faoi Cead Pleanala 13/04748), chomaith le oibrithe coimhdeach laithreain. - To construct a steel framed enclosure over the existing loading bay area to the existing Folláin Teo food process facility (under Planning Permission 13/04748) inclusive of all ancillary site works. / 0.2 km away / 23 May 2022Granted
- 08/5575Construction of single storey catalyst technology development laboratory with 3 no. external single storey storage buildings, continuation of existing estate roadway, construction of 2 no. site entrances, surface car parking, underground surface water attenuation tank and associated site works / 0.2 km away / 03 February 2009Granted