ESB Dunmanway 110kV Station Ballyhalwick Dunmanway Co. Cork
Planning application 12/461
DecisionConditional grant
Decided28 August 2012
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Cork County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Cork has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near ESB Dunmanway 110kV Station Ballyhalwick Dunmanway Co. Cork?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- 03/2841Alterations to 110kv substation consisting of 38kv/ 20kv transformer and bunding, 38 & 20 kv switch gear, transformers & assoc. works / 0.0 km away / 06 August 2003Granted
- 00/1390Installation of a 110 kV 15MVAr Capacitor Bank & associated equipment in existing 110kV substation / 0.0 km away / 10 May 2000Granted
- 99/1028Erection of a 110kV line bay & extension to existing 110kV busbar located in fenced compound / 0.0 km away / 29 April 1999Granted
- 19/315To consist of a new bay which will comprise of a cable chair, a circuit breaker, a voltage transformer, a current transformer and a conductor that transfers electricity between them and onto the existing busbar and a 15m high lightning nonopole. The proposed bay has an approximate footprint of 408m2 (34m x 12m) and is 7m in height. An underground cable within the ESB compound of approximately 150m in length also forms part of the proposed development. The area within the red line application boundary is 0.1078ha / 0.0 km away / 04 July 2019Granted
- 06/287Dwellinghouse, installation of small treatment plant & associated site works & permission of retention of domestic garage / 0.2 km away / 07 July 2006Granted
- 16/707Permission to construction extension to dwelling. / 0.3 km away / 10 January 2017Granted
- 01/3588Alterations to roof & extension to dwelling / 0.3 km away / 17 August 2001Granted
- 04/2501Construction of dwellinghouse and associated site works / 0.3 km away / 09 June 2004Granted