Ballyhalwick Dunmanway Co Cork
Planning application 16/707
DecisionConditional grant
Decided10 January 2017
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Cork County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Cork has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Ballyhalwick Dunmanway Co Cork?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- 06/287Dwellinghouse, installation of small treatment plant & associated site works & permission of retention of domestic garage / 0.1 km away / 07 July 2006Granted
- 01/3588Alterations to roof & extension to dwelling / 0.1 km away / 17 August 2001Granted
- 10/352Retention of extensions to dwelling and permission to construct rear extension to dwelling and ancillary site works / 0.1 km away / 02 July 2010Granted
- 00/3744Domestic garage / 0.2 km away / 17 August 2000Granted
- 18/575To construct extension to dwelling / 0.2 km away / 14 November 2018Granted
- 19/315To consist of a new bay which will comprise of a cable chair, a circuit breaker, a voltage transformer, a current transformer and a conductor that transfers electricity between them and onto the existing busbar and a 15m high lightning nonopole. The proposed bay has an approximate footprint of 408m2 (34m x 12m) and is 7m in height. An underground cable within the ESB compound of approximately 150m in length also forms part of the proposed development. The area within the red line application boundary is 0.1078ha / 0.2 km away / 04 July 2019Granted
- 03/2841Alterations to 110kv substation consisting of 38kv/ 20kv transformer and bunding, 38 & 20 kv switch gear, transformers & assoc. works / 0.2 km away / 06 August 2003Granted
- 12/461Alterations to the existing 110kV station to include new 38kV GIS building, new MV GIS building, existing toilet building to be demolished and replaced with new toilet building, extension to control room, eight new lightning masts, two new 38kV masts, three new transformers, two new house transformers, new neutral earth resistor, existing 110kV busbar to be demolished and replaced with new 110kV tubular busbar, existing 38kV busbar and associated equipment and three 38kV masts to be demolished, two new oil interceptors and all associated drainage, and associated site works / 0.3 km away / 28 August 2012Granted