Bantry General Hospital Bantry Co. Cork
Planning application 15/218
DecisionConditional grant
Decided18 June 2015
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Cork County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Cork has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Bantry General Hospital Bantry Co. Cork?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- 19/603Construction of a single storey extension circa 70SQM to the northern elevation of existing laboratory together with all associated site development works / 0.0 km away / 12 November 2019Granted
- 13/702Construction of a new single storey hospital extension (367sqm) to the south of existing Ward Block, comprising new Medical Asssessment Unit consisting of 2no. 4 Bay Cubicle areas, Isolation Room, Nurses Station, Patient Toilet Facilities and associated Clinical functions and refurbishment and change of use of part of existing building from 2no. Wards into offices, interview room/meical records store/Ensuite together with all associated site development works / 0.0 km away / 19 February 2014Granted
- 22/753The construction of new covered ambulance set down bays, new entrance into the existing hospital, minor internal reconfiguration works and the demolition of existing external ramp, along with new ambulance parking, accessible parking and all associated site development works / 0.0 km away / 06 February 2023Granted
- 08/143Alteration of existing hospital entrance, provision of car parking and associated site works / 0.0 km away / 06 March 2008Granted
- 07/1745Construct glazed enclosure entrance and alter steps to main hospital portico entrance, including all ancillary site works / 0.0 km away / 22 August 2007Granted
- 24/699The construction of a two-storey building extension to the existing hospital to provide a 16-bed Rehabilitation Unit and Undercroft Plant Area at ground floor level, a 24 bed in-patient ward at first floor level and a Louvred Plant room Enclosure at roof level. Permission is also sought for refurbishment works within the ground floor of the existing hospital and the placement of a Plant room on the existing hospital roof. The works will include all associated site development works, realignment of existing parking spaces to provide additional parking, the upgrade of the adjoining landscaping and amenity areas associated with the proposed Stroke Rehabilitation Unit and In-Patient Ward building extension and permission for modifications to northern end of the existing pedestrian walkway which runs along the eastern boundary and associated ancillary works / 0.0 km away / 19 February 2025Granted
- 21/536Construction of a single storey Endoscopy Unit and the construction of a single storey extension to the existing hospital to provide 16 no. beds for a Stroke Rehabilitation Unit and all associated site development works including a link from the proposed Endoscopy Unit to the existing hospital, alterations to the road layout and parking, upgrading of landscaping and amenity areas associated with the proposed Endoscopy Unit and Stroke Rehabilitation Unit and permission for the construction of an overflow carpark to the north of the site and associated ancillary works / 0.0 km away / 17 February 2022Granted
- 06/22Construction of a two storey, eight bed hospital extension and associated site works to the existing structure / 0.0 km away / 07 March 2006Granted