Bantry General Hospital Carrignagat Bantry Co. Cork
Planning application 24/699
DecisionConditional grant
Decided19 February 2025
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Cork County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Cork has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Bantry General Hospital Carrignagat Bantry Co. Cork?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- 21/536Construction of a single storey Endoscopy Unit and the construction of a single storey extension to the existing hospital to provide 16 no. beds for a Stroke Rehabilitation Unit and all associated site development works including a link from the proposed Endoscopy Unit to the existing hospital, alterations to the road layout and parking, upgrading of landscaping and amenity areas associated with the proposed Endoscopy Unit and Stroke Rehabilitation Unit and permission for the construction of an overflow carpark to the north of the site and associated ancillary works / 0.0 km away / 17 February 2022Granted
- 08/143Alteration of existing hospital entrance, provision of car parking and associated site works / 0.0 km away / 06 March 2008Granted
- 07/1745Construct glazed enclosure entrance and alter steps to main hospital portico entrance, including all ancillary site works / 0.0 km away / 22 August 2007Granted
- 19/603Construction of a single storey extension circa 70SQM to the northern elevation of existing laboratory together with all associated site development works / 0.0 km away / 12 November 2019Granted
- 15/218Construction of a new first floor single storey hospital extension (430sqm) to the south of existing Ward Block, comprising 8no. single bed with Ensuite facilities, associated staff base, office, sluice, clean utility, and internal refurbishment works to St. Joseph's Ward to include new Dining Area, Nurses Station, C&M Office, Link Corridor, Clinical Storage Areas, WC facilities along with refurbishment of the existing 2no. 4 bed wards, new first floor extension (77sqm) to west of existing Ward Block to include 4 bed Pre-Op Assessment Ward together with all associated site development works / 0.0 km away / 18 June 2015Granted
- 13/702Construction of a new single storey hospital extension (367sqm) to the south of existing Ward Block, comprising new Medical Asssessment Unit consisting of 2no. 4 Bay Cubicle areas, Isolation Room, Nurses Station, Patient Toilet Facilities and associated Clinical functions and refurbishment and change of use of part of existing building from 2no. Wards into offices, interview room/meical records store/Ensuite together with all associated site development works / 0.0 km away / 19 February 2014Granted
- 22/753The construction of new covered ambulance set down bays, new entrance into the existing hospital, minor internal reconfiguration works and the demolition of existing external ramp, along with new ambulance parking, accessible parking and all associated site development works / 0.0 km away / 06 February 2023Granted
- 06/22Construction of a two storey, eight bed hospital extension and associated site works to the existing structure / 0.0 km away / 07 March 2006Granted