Rossmore Quarry Barryscourt & Rossmore Townlands Carrigtohill County Cork
Planning application 18/6465
DecisionUnconditional grant
Decided09 November 2018
Application typeEXTENSION OF DURATION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Cork County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Cork has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Rossmore Quarry Barryscourt & Rossmore Townlands Carrigtohill County Cork?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- 21/5965The development will comprise of continuance use of the existing quarry development within an overall application area of c.24.7 hectares; extraction to the permitted level of 40m below Ordnance Datum, within the extraction area permitted under Plan. Reg. 03/4570; final restoration of the quarry void area and an area of 3.8 hectares to the North adjacent to the public road. Permission is sought for twenty years plus two years for final restoration (total duration 22 years). Permission is also being sought for an extension to the existing operating hours for the ready mixed concrete plant for out of hours operation of the plant up to a maximum of 40 occasions per year, to supply critical and strategic building/infrastructure/maintenance projects whose construction requires supply of concrete outside normal plant operating hours. An Environmental Impact Assessment Report has been prepared for the planning application. / 0.0 km away / 14 March 2022Granted
- 03/4570SEE APPLICATION FOR DETAILS / 0.1 km away / 07 July 2004Granted
- 20/4199The construction of 2 no. new ESB substation & distribution room buildings and the decommissioning of an existing ESB substation and all associated site works. / 0.2 km away / 19 November 2020Granted
- 24/5822Permission to (A) Decommission existing septic tank and percolation area serving existing dwelling and (B) install a new septic tank and percolation area. / 0.4 km away / 21 November 2024Granted
- 24/5827Permission to construct a new dwelling house. / 0.4 km away / 21 November 2024Granted
- 20/6709The implementation of a landscaping scheme to provide for the screening and landscaping of the northern boundary of the site using existing overburden materials, within an application area of 3.55 hectares. / 0.5 km away / 28 June 2021Granted
- 14/4061Extension of quarrying of sand, gravel and limestone over an area of 7.2 hectares, an increase in the output of limestone from the existing quarry and the proposed extension area, the quarrying of limestone by blasting, the construction and operation of an asphalt plant and all ancillary site development works and landscaping of an overall site of 15.5 hectares. Extension of duration to Permission granted under An Bórd Pleanála Reference No. PL 04.203762 (pl.reg.no. 02/5476). / 0.5 km away / 06 March 2014Granted
- 02/5476SEE APPLICATION FOR DETAILS / 0.5 km away / 14 July 2003Granted