Rossmore Quarry Rossmore Townland Carrigtohill County Cork
Planning application 20/4199
DecisionConditional grant
Decided19 November 2020
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Cork County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Cork has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Rossmore Quarry Rossmore Townland Carrigtohill County Cork?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- 21/5965The development will comprise of continuance use of the existing quarry development within an overall application area of c.24.7 hectares; extraction to the permitted level of 40m below Ordnance Datum, within the extraction area permitted under Plan. Reg. 03/4570; final restoration of the quarry void area and an area of 3.8 hectares to the North adjacent to the public road. Permission is sought for twenty years plus two years for final restoration (total duration 22 years). Permission is also being sought for an extension to the existing operating hours for the ready mixed concrete plant for out of hours operation of the plant up to a maximum of 40 occasions per year, to supply critical and strategic building/infrastructure/maintenance projects whose construction requires supply of concrete outside normal plant operating hours. An Environmental Impact Assessment Report has been prepared for the planning application. / 0.2 km away / 14 March 2022Granted
- 18/6465Ext. of an existing quarry over an area of 19.9ha, and the deepening of the quarry floor from the level permitted under Reg. Ref. 99/3410 to 40m below Ordnance Datum, relocation and reconfiguration of existing 38kv electricity supply pole sets that traverse the southeast of the site, and all other associated development incl. the restoration works of the final quarry void (Extractive Area) and an area of 3,8 ha to the north adjacent to the public rd. (Rd Frontage Restoration Area). The development also consists of the retention of the northern and southern quarry faces over an area of 0.872ha from the extent of the quarry faces permitted under Reg. Ref. 99/3410 at Barryscourt, Rossmore, Carrigtohill. Extension of Duration of Permission granted under Planning Reference: 03/4570. / 0.2 km away / 09 November 2018Granted
- 04/5593Extension to offices, car parking and relocation of sewage treatment unit / 0.3 km away / 18 January 2005Granted
- 03/1644Change of use of dwelling to offices, sewage treatment unit and additional car parking spaces / 0.3 km away / 11 August 2003Granted
- 03/4570SEE APPLICATION FOR DETAILS / 0.3 km away / 07 July 2004Granted
- 24/5827Permission to construct a new dwelling house. / 0.4 km away / 21 November 2024Granted
- 24/5822Permission to (A) Decommission existing septic tank and percolation area serving existing dwelling and (B) install a new septic tank and percolation area. / 0.4 km away / 21 November 2024Granted
- 24/6436Permission to construct a new dwelling house, new vehicular entrance, domestic garage, install a wastewater treatment & percolation area and all associated site works. / 0.4 km away / 07 April 2025Granted