Barryscourt, Carrigtohill
Planning application 04/5593
DecisionConditional grant
Decided18 January 2005
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Cork County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Cork has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Barryscourt, Carrigtohill?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- 03/1644Change of use of dwelling to offices, sewage treatment unit and additional car parking spaces / 0.0 km away / 11 August 2003Granted
- 24/6436Permission to construct a new dwelling house, new vehicular entrance, domestic garage, install a wastewater treatment & percolation area and all associated site works. / 0.2 km away / 07 April 2025Granted
- 22/67121. Construction of agricultural building for the storage of straw & ancillary dry goods, agricultural machinery, along with the storage of vintage tractors & machinery for personal use. 2. Upgrading of existing entrance to the proposed development along with associated site works. / 0.2 km away / 26 October 2023Granted
- 24/5827Permission to construct a new dwelling house. / 0.3 km away / 21 November 2024Granted
- 20/4199The construction of 2 no. new ESB substation & distribution room buildings and the decommissioning of an existing ESB substation and all associated site works. / 0.3 km away / 19 November 2020Granted
- 25/4156Permission for a 20kV underground grid connection cable in the townlands of Barryscourt, Rossmore and Ballintubbrid West, near Carrigtwohill, Co. Cork. The proposed development is intended to connect the permitted Barryscourt Solar Park (Pl. Ref. 17/4596) to the existing Carrigtwohill 38KV Substation. The Proposed development will consist of: The laying of 20kV underground electrical grid connection (c.2.45km in length), utilising both private lands and public roads, with c.1.157km in the public road (L3619), from the existing Carrigtwohill 38kV substation to the permitted Barryscourt Solar Park (Pl. ref. 17/4596). The proposed development includes all associated site development and site enabling works and ancillary infrastructure, including 5 no. joint bays and 20kV underground ducting and cabling. A Natura Impact Statement (NIS) accompanies this Planning Application. / 0.3 km away / 08 September 2025Granted
- 24/5822Permission to (A) Decommission existing septic tank and percolation area serving existing dwelling and (B) install a new septic tank and percolation area. / 0.3 km away / 21 November 2024Granted
- 21/5965The development will comprise of continuance use of the existing quarry development within an overall application area of c.24.7 hectares; extraction to the permitted level of 40m below Ordnance Datum, within the extraction area permitted under Plan. Reg. 03/4570; final restoration of the quarry void area and an area of 3.8 hectares to the North adjacent to the public road. Permission is sought for twenty years plus two years for final restoration (total duration 22 years). Permission is also being sought for an extension to the existing operating hours for the ready mixed concrete plant for out of hours operation of the plant up to a maximum of 40 occasions per year, to supply critical and strategic building/infrastructure/maintenance projects whose construction requires supply of concrete outside normal plant operating hours. An Environmental Impact Assessment Report has been prepared for the planning application. / 0.5 km away / 14 March 2022Granted