Barryscourt Carrigtwohill Co. Cork
Planning application 22/6712
DecisionConditional grant
Decided26 October 2023
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Cork County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Cork has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Barryscourt Carrigtwohill Co. Cork?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- 04/5593Extension to offices, car parking and relocation of sewage treatment unit / 0.2 km away / 18 January 2005Granted
- 03/1644Change of use of dwelling to offices, sewage treatment unit and additional car parking spaces / 0.2 km away / 11 August 2003Granted
- 25/4156Permission for a 20kV underground grid connection cable in the townlands of Barryscourt, Rossmore and Ballintubbrid West, near Carrigtwohill, Co. Cork. The proposed development is intended to connect the permitted Barryscourt Solar Park (Pl. Ref. 17/4596) to the existing Carrigtwohill 38KV Substation. The Proposed development will consist of: The laying of 20kV underground electrical grid connection (c.2.45km in length), utilising both private lands and public roads, with c.1.157km in the public road (L3619), from the existing Carrigtwohill 38kV substation to the permitted Barryscourt Solar Park (Pl. ref. 17/4596). The proposed development includes all associated site development and site enabling works and ancillary infrastructure, including 5 no. joint bays and 20kV underground ducting and cabling. A Natura Impact Statement (NIS) accompanies this Planning Application. / 0.3 km away / 08 September 2025Granted
- 17/4596A solar photovoltaic panel array consisting of up to approximately 68,000 m2 of solar panels on ground mounted steel frames, 2 no. substation buildings, 3 no. transformer units, 1 no. storage & control cabin, 1 no. storage & combined substation cabin, underground cable and ducts, boundary security fence, new internal tracks, CCTV and all associated site services and works. Planning Permission is sought for a period of 10 years. / 0.4 km away / 30 August 2018Granted
- 24/6436Permission to construct a new dwelling house, new vehicular entrance, domestic garage, install a wastewater treatment & percolation area and all associated site works. / 0.4 km away / 07 April 2025Granted
- 10/6261Completion of raising levels of low lying agricultural land and construction of new entrance and ancillary works granted under planning ref. no. 05/5959 (New permission to expire on the 16/11/2012) / 0.4 km away / 03 November 2010Granted
- 05/5959Raising levels of low lying agricultural land and construction of new entrance and ancillary works / 0.4 km away / 12 October 2005Granted
- 20/4199The construction of 2 no. new ESB substation & distribution room buildings and the decommissioning of an existing ESB substation and all associated site works. / 0.5 km away / 19 November 2020Granted